01


01 - Rackcdn.comc24110ab053e5c234c6f-9b7150e100ab604df0aafbaf58c9fe02.r58.cf3.rackcdn.com/...

3 downloads 189 Views 184KB Size

126a High Street Old Woking Surrey GU22 9JN Tel;- 01483 750074 Fax:- 01483 751995

Testing 1303

INTEGRITY TEST CERTIFICATE OF FOUNDATION PILES For Hill Piling Ltd REPORT: TCSL – 6197. Visit 01 CLIENT:

Hill Piling Ltd Unit 1 Springfield Industrial Estate Springfield Road Burnham-on-Crouch Essex CM0 8UA

SITE ADDRESS :

Durkan Union Road Clapham London SW4 6JG

DATE OF TESTING:

September 11th, 2013

No: PILES TESTED:

29

PERFORMED BY:

Christian Doe

PILE TYPE:

350mm nominal diameter continuous flight auger (CFA) piles

PILE LENGHTS:

10.7 to 23.6 from final level

PILES TESTED:

P204, P205, P207 to P209inc, P212 to P214inc, P218 to P224inc, P227 to P236inc, P239 to P242inc. CONCLUSION OF RESULTS The interpretation of the recorded test traces indicate that of the 29 piles tested no major defects have occurred within the material of the pile shafts during their construction, therefore, the piles are considered to be of a reliable integrity throughout their length with no significant changes in cross-sectional area.

Date Reported: September 12th, 2013

Checked By:………………… . Barry Shirley Operations Manager