126a High Street Old Woking Surrey GU22 9JN Tel;- 01483 750074 Fax:- 01483 751995

Testing 1303

INTEGRITY TEST CERTIFICATE OF FOUNDATION PILES For Hill Piling Ltd REPORT: TCSL – 6197. Visit 07 CLIENT:

Hill Piling Ltd Unit 1 Springfield Industrial Estate Springfield Road Burnham-on-Crouch Essex CM0 8UA

SITE ADDRESS :

Durkan Union Road Clapham London SW4 6JG

DATE OF TESTING:

October 10th, 2013

No: PILES TESTED:

5

PERFORMED BY:

Christian Doe

PILE TYPE:

350mm nominal diameter continuous flight auger (CFA) piles

PILE LENGHTS:

10.7 to 23.6 from final level

PILES TESTED:

Block C: P111, P118, P135, P136, P146.

CONCLUSION OF RESULTS The interpretation of the recorded test traces indicate that of the 5 piles tested no major defects have occurred within the material of the pile shafts during their construction, therefore, the piles are considered to be of a reliable integrity throughout their length with no significant changes in cross-sectional area.

Date Reported: October 14th, 2013

Checked By:………………… . Barry Shirley Operations Manager