General Notes

Block A Units: F-02, F-05, F-21, F-24 Note F-05 and F-24 are handed

C

Copyright Stephen Davy Peter Smith Architects 2013

All dimensions are given in millimetres, and internal dimensions are taken to face of structure. Do not scale from the drawing. All dimensions and conditions to be checked and confirmed on site by the Contractor. The Contractor should inform the Architect of any discrepancies before proceeding with the work. All elements of work and materials are to comply with Building Regulations and British Standards, good industry practice and the recommendations of material and component manufacturers. All drawings are indicative only. The sub-contractor is to submit shop drawings to the contract administrator of all the relevant components and elements for comment prior to fabrication. P4

All products are to be suitable for their purpose. The Contractor is to install all products where noted in accordance with manufacturers' recommendations/specifications and inform the Architect of any discrepancies or changes in the specification before proceeding with the work. This drawing is to be read in conjunction with all other relevant documentation including that produced by other consultants, subcontractors and suppliers.

Kitchen Type A2 1310(AS)10-01

P1

90.5

1023

FG

D03 A2

72

1822.5

Bathroom 4.5sqm

Bathroom Type 03 1310(AS)11-02

P2

1688

D04 A2

1316

Additional layer of MR plaster board to sit flush with tile backer board

72

Key / Notes

D05 A2

Door Reference D≠ : Door No /xx: Unit Type Refer to door schedules, series 1310(AS)08-XX.

P≠

Partition Reference Refer to drawing 1310(AS)07-03 Wall Tile Backing Board Refer to drawing 1310(AS)07-03

B A

P1

D

P2

W

72

-

CF 10.02.14 Broom cupboard added to kitchen Tenure Defined. Bathroom & Kitchen types WB 06.09.13 added, Tile backer board added to Bathroom, Doors amended where bubbled to allow for 300nib, Handed units noted, Issued for Construction Issued for Tender WB 28.06.13

Rev

1999.5

Comment

By

Date

D

P2

D≠ xx

916(s/o)

72

DW

828

Refer to Mechanical Engineer's drawings and specifications for all information on mechanical and electrical items.

Entrance door openings: Refer to the G.A. floor plans. Also to be read in conjunction with door schedules, drawing series 1310(AS)08-XX.

2688

72

P2a

Future Hoist

2426.5

3233.5

WM

P1

2688

0.8sqm

D02 A2

916(s/o)

126

M&E

840(s/o)

B

102

F/F

916(s/o)

W

Refer to Structural Engineer's drawings and specifications for all information on structural frame/ elements.

D01 A2

stephen davy architects peter smith

Kitchen/Living/Dining P RW

P RW

3858

20sqm

Double 12sqm

3326.5

72

3210.5

Fanshaw House, Fanshaw Street, London N1 6HX Tel: 020 7739 2020 Fax: 020 7739 2021 E-mail: [email protected] Website: www.davysmitharchitects.co.uk

Client

Durkan Ltd Durkan House 214 - 224 High Street Waltham Cross Hertfordshire EN8 7DU Project

Union Road Union Road / Clapham Road Clapham SW4 Drawing Title

Flat Layout Drawings-Shared Ownership Flat Type A2 1B2P - 42.5sqm Job No.

Drawn By

Date

Checked by

1310

June 2013 Drawing No.

WB

Scale

1:50 @ A3

GD/KK

1310(GA)401