ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH AU: 1800 029 701 N Z: 0800 466 444
[email protected] www.abscosheds.com.au
Absco Industries Premier Shed Model: 23151GK FRONT: 2.26m SIDE: 1.52m HEIGHT: 1.95m
TE SLAB
CONCRE
6060mm
31
00 mm
16
RETE
CONC
20
mm
SLAB
m
2360m
WHEN LAYING YOUR CONCRETE SLAB, ENSURE THERE IS A REBATED EDGE 25mm DEEP AROUND THE PERIMETER
BOTTOM CHANNEL REBATED EDGE TE
RE
NC
CO
100mm
THIS WILL HELP WATER EGRESS FROM THE BASE OF THE SHED
75mm WIDE REBATE CONCRETE SLAB
We thank you for choosing an Australian made When laying concrete slab, ensure there Wind rating: Not rated. shed. For further assistance please visit our detailed is a rebated edge 25mm deep around If you require a wind rated product please contact instructional video library at Http://www.abscosheds.com.au/watch-videos the perimeter. This will help water egress us:
[email protected] or 1800 029 701 the base of the shed. At ABSCO Industries we are always looking tofrom be number ONE, so please let us know what you think of our instructions. Feedback makes us better.
[email protected]
MANU FA CT URED IN A US TR ALIA
ABSCO INDUSTRIES
Download the Absco Sheds Assembly App for instructional videos ASSEMBLY INSTRUCTION MANUAL
SHED MODEL: 23151GK
21-11-2017
PAGE 01
SNAPTiTE Assemb ly
Absco Industries
Assembly Instruction Manual
Model: 60303WECOK
06/02/2019
1.10
1
ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH GENERAL INSTRUCTIONS •
Before commencing any assembly, read through these instructions in detail to gain a thorough understanding of assembly methods and associated details.
•
Unpack the carton and carefully identify and check off all the parts against the parts described and illustrated on "COMPONENTS PACKING LIST" pages.
•
Local authority approval must be obtained prior to construction of the shed. Once you have selected your site you will need to lodge a site plan to your local council.
SITE PREPARATION •
The site for the shed must be level. An uneven surface may result in misalignment of parts.
•
The shed shall be erected on top of a reinforced concrete slab and anchored down appropriately illustrated on “FINAL CONSTRUCTION” page. If using a rebated slab ensure that all frame uprights are trimmed 25mm.
10mm drill bits metal & masonry
3mm drill bit
TOOLS REQUIRED
SAFETY NOTES •
Some parts may have sharp edges. It is advisable to wear gloves when handling these items and safety glasses if drilling holes. Sensible shoes are highly recommended.
•
Do not erect your shed in windy conditions.
•
It is highly recommended to erect the shed with two or more people. RECOMMENDED
Absco Industries
Assembly Instruction Manual
Model: 60303WECOK
06/02/2019
1.10
2
ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH
COMPONENT PACKING LIST Check off all components. MAIN PACK CARTON (PACK 1 OF 2) QTY
COMPONENT DESCRIPTION
PART No.
CHECK QTY
COMPONENT DESCRIPTION
PART No.
2
STEEL SHEET 1915mm X 773mm
36L
1
STEEL SHEET 1725mm X 773mm
A
2
STEEL SHEET 2045mm X 773mm
38L
2
STEEL SHEET 1725mm X 773mm
B
16
STEEL SHEET 1546mm X 773mm
45A
RIDGE BEAM
2
CHECK
97AL
L = 1521mm
1
STEEL SHEET 1785mm X 711mm
34A
RIDGE BEAM
2
97AR
L = 1521mm
1
STEEL SHEET 1785mm X 711mm
35A
2
2
STEEL SHEET 1785mm X 731mm
33A
2 1
Absco Industries
Assembly Instruction Manual
RIDGE BEAM JOINER L: 450mm (17.7")
PEAK BRACE
ZARSP
15A
FITTINGS & ACCESSORIES PACKET (SEE PAGE 4)
Model: 60303WECOK
06/02/2019
1.10
3
ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH
COMPONENT PACKING LIST FITTINGS & ACCESSORIES PACKET CONTENTS
3
DOOR STRAP L: 165mm
12A
18
2
CAP GABLE L: 170mm
14A
2
1
PSTKSGL SINGLE DOOR FITTINGS PACK
1
1
PSTKDBL DOUBLE DOOR FITTING PACK
20
CHANNEL JOINER L= 200mm (7.9") RIDGE PLATES
CSJ RBP
RIDGE CAP JOINER 16mm TEK SCREWS
98A FAST014
PSTKSGL - SINGLE DOOR FITTINGS PACK
1 1 1
DOOR PADBOLT 3mm DRILL BIT
FAST006
1
DRILL
1
SELF TAPPING SCREWS PACKET CONTAINING 220
DOOR PADBOLT HASP
FAST007
PHILLIPS DRIVER BIT
FAST038
PACK 6P SCREW PACK 6
1
PACK 6P - SCREW PACK 6
6
3/16 COUNTERSUNK SCREWS & NUTS
3.2 x 8mm BLIND POP RIVETS
6
PSTKDBL - DOUBLE DOOR FITTINGS PACK
3 1 1
DOOR PADBOLT 3mm DRILL BIT
FAST006
2
DRILL
1
SELF TAPPING SCREWS PACKET CONTAINING 220
DOOR PADBOLT HASP
FAST007
PHILLIPS DRIVER BIT
FAST038
PACK12P SCREW PACK 12
1
PACK12P - SCREW PACK 12
8
3/16 ROUND HEAD BOLTS & NYLOCK NUTS
12
3/16 COUNTERSUNK SCREWS & NUTS
Absco Industries
Assembly Instruction Manual
12
3.2 x 8mm BLIND POP RIVETS
Model: 60303WECOK
06/02/2019
1.10
4
ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH
COMPONENT PACKING LIST MAIN PACK CARTON (PACK 2 OF 2) COMPONENT DESCRIPTION
QTY
PART No.
CHECK QTY
COMPONENT DESCRIPTION
PART No.
STEEL SHEET 1915mm X 773mm
36R
6
STEEL SHEET 1785mm X 773mm
31A
2
STEEL SHEET 2045mm X 773mm
38R
3
STEEL SHEET 1785mm X 773mm
30A
2
40
2
80
C1482
1
60303WCP-(J) CHANNELPACK (SEE PGs 6 & 7)
C1704
1
PORTAL FRAME FITTINGS PACK (SEE BELOW)
2
40
CHANNEL L = 1482mm
80
CHANNEL L = 1704mm
CHECK
PORTAL FRAME ACCESSORIES
2 2 2
Absco Industries
KNEE PLATE
APEX PLATE
MULTI PURPOSE BRACKET
Assembly Instruction Manual
4 120 26
Model: 60303WECOK
DYNABOLT
16mm TEK SCREWS
45mm TEK SCREWS
06/02/2019
1.10
5
ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH
COMPONENT PACKING LIST MAIN PACK (PACK 2 OF 2) CHANNEL SET QTY
1 2 1 1 1 4 6 2
COMPONENT DESCRIPTION
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
Absco Industries
PART No.
CHECK QTY
55AL
1
55BL
2
55CL
1
56AL
1
56BL
1
60AL
4
81AL
6
81BL
2
Assembly Instruction Manual
COMPONENT DESCRIPTION
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
CHANNEL L = 1496.5mm
Model: 60303WECOK
06/02/2019
PART No.
CHECK
55AR
55BR 55CR 56AR 56BR 60AR 81AR 81BR
1.10
6
ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH
COMPONENT PACKING LIST MAIN PACK (PACK 2 OF 2) CHANNEL SET (CONT.) QTY
3 2 6 1 1 2 2
COMPONENT DESCRIPTION
CHANNEL WITH HINGES L = 1725mm
CHANNEL L = 1725mm
CHECK QTY
58A
3
58B
1
58C
CHANNEL L = 773mm
CHANNEL L = 1568mm
79A 79B
CHANNEL L = 788mm
84L
CHANNEL L = 1518mm
CHANNEL L = 1518mm
Absco Industries
PART No.
84R
Assembly Instruction Manual
1 1 1 6 4
COMPONENT DESCRIPTION
JAMB L= 1785mm
PART No.
CHECK
89A
89B JAMB L= 1785mm
89C JAMB L= 1725mm
90A JAMB L= 1568mm
90B JAMB L= 788mm
91A JAMB L= 1120mm
87A LIP TRIM L= 1546mm
Model: 60303WECOK
06/02/2019
1.10
7
ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH
SNAPTiTE ASSEMBLY GUIDE The Snaptite Assembly System locks end channels to all roof and wall sheets without the need for tools and fasteners. To assemble each panel, the perimeter channels are secured to the top and bottom of each panel. Gently tap the channel over the SNAPTiTE lugs on the sheet, working along the sheet. Each perimeter channel must finish flush with the edges of the sheets. Simply tap the channel along the sheets until each end is neatly flush. If you need to remove channels from the panels, slide it off from the side.
Channel locks the shed panel into position without the need for screws!
FASTENING SYMBOLS SNAP T iTE
Secure channel to sheeting by SNAPTiTE fastening method. Join components together with one screw at this location only, as some channels have extra holes that are not required for this model of shed. Do not join components together at this location yet, as the screws may obstruct further assembly of the other components.
Absco Industries
Assembly Instruction Manual
D
Join components together by pre-drilling the holes first. Use one component as template to mark where the holes are and drill with a 3mm drill bit. 3mm pop rivet 4mm nut and bolt set.
Model: 60303WECOK
06/02/2019
1.10
8
ABSCO WORKSHOP SHED MODEL: 60303WECOK 5.96mW x 3.00mD x 2.10mH
Guide on Joining Spliced Channels The text marked on all parts must be shown on the same side as each other
=
=
=
=
CSJ
=
JOIN>>
JOIN>>
JO
IN
Step 2. Join the first channel to the CSJ by inserting the centre of the CSJ, on an angle, to the end of the channel where the JOIN>> text is marked.
JOIN>> =
Step 3. Join the second channel to the CSJ by positioning the
SJ
J
=