      REQUEST FOR QUALIFICATIONS – ARCHITECTURAL DESIGN SERVICES Arkansas State University – Jonesboro, in accordance with the policies of the Board of Trustees, is soliciting response from qualified architects for the renovation of Wilson Hall. Project Description Arkansas State University has partnered with New York Institute of Technology to deliver a NYIT College of Osteopathic Medicine at the Jonesboro campus. Wilson Hall was selected for the host building due to the transfer of current occupants to the new Humanities and Social Sciences building, and for the ideal building size and campus location. Wilson Hall is an 86,188 gross square feet, 4story concrete and masonry structure constructed in 1932, with major renovations and investments in the 1960’s and within the last decade. The project will include major architectural renovations for specialty labs, with general renovations for classrooms, offices and other support spaces. It is anticipated all areas of the building, except the IT Store on the first level, will be utilized for the Osteopathic program. Appendix A presents the current floor plans and draft renovated program floor plans. Current planned renovation project budget is $5,000,000. NYIT budget scope specialty equipment & supplies, technology, program specific FFE is in excess of $10 million. Submission The deadline for responses is 4:00 PM CDST on Friday, May 1, 2015. Respondents will provide (10) published copies and an electronic copy (PDF format, less than 10mb required file size) to: David Handwork, P.E. Director of Planning Design and Construction Arkansas State University 2713 Pawnee Street Jonesboro, AR 72401 Email: [email protected] Phone: (870) 680-4691 Cell: (870) 897-2613

         AState.edu                                                        

    NYIT.edu

 

1    

 

  Professional Services Required The project committee will be comprised of ASU-J and NYIT constituents. Architect will work with representatives of this team and Facilities Management Planning Design and Construction for principle responsibility of: • Program development / refinement • Schematic Design, Design Development, and Construction documents • Critique of Construction Management (CM) Contractor budget submittals at Schematic Design, Design Development and 90% Construction documents • All inclusive lab design services, including equipment lists and specifications • All inclusive Low Voltage (IT, A/V, security) design services (with input from ASU-J and NYIT technical staff) • All inclusive interior design services and non-lab FFE design services • Production of bid documents for Construction Manager procurement • Construction administration • Commissioning services for labs, specialty equipment / systems, and low voltage systems • Project close out • Warranty administration and 1-year post occupancy inspection and review NOTE: A Technology Integrator Professional will be selected separately from the Architectural Design Services Professionals. The Integrator professional will work direct with NYIT and concurrent with the Architect on coordinating the specialty education systems (i.e. simulation labs, etc.) in the design, construction and commissioning phases. This will be separate from the Low Voltage sub consultant services under the Architect scope. Statement of Qualifications Format and Content A selection committee comprised of ASU-J and NYIT constituents will review Statements of Qualification. To aide committee review of competing firms, the SoQ document should be structured in the following order and content: 1. Lead Firm Base Information a. Name and address of firm b. Primary contact telephone numbers and email addresses c. Web page address, and any social media addresses 2. Brief History of Lead Firm a. Size of firm (staff numbers) b. Number of years in business c. Organization chart of firm

         AState.edu                                                        

    NYIT.edu

 

2    

 

  3. Design Team Background a. Architecture Team i. Principle In Charge ii. Director of Design for Osteopathic programs iii. Project Manager iv. Project Architect(s) v. Lab Designer(s) (Gross Anatomy, OMM, ICC, etc.) vi. Interior Designer vii. Construction Administration Manager viii. Other b. Partnered Firm (non-design lead), if utilized i. Partnered firm manager c. Consultants i. Structural Engineer ii. Mechanical Engineer iii. Electrical Engineer iv. Low Voltage Consultant (IT, A/V, security infrastructure) v. Other d. Resumes of Team Members (Architecture Team, Partnered Firm, Consultants) 4. Representative Projects / Project Experience– List a minimum of five (5) projects completed by your firm that best represents a similar scope, budget, program and complexity. Projects can be renovations or new construction. For each project, include: a. Name and Location b. Owner Representative name and contact information c. Project Description (include any unique aspects) d. Photographs e. Total Square Footage i. New construction / additions ii. Renovations f. Project Schedule i. List initial program or Conceptual Design Date ii. List the Substantial Completion Date g. Cost Effective Design i. Initial Budget ii. Bid Amount iii. Final Construction Cost iv. List any changes in scope if applicable h. Cost per Square Foot i. Construction only – excluding site cost ii. Total cost, including FFE and all soft cost 5. Proof of Licensure or Eligibility a. Architects: All firms will be licensed, or eligible for licensure, in the State of Arkansas. Eligible firms not currently licensed must send a          AState.edu                                                        

    NYIT.edu

 

3    

 

  letter to the Arkansas State Board of Architects, Landscape Architects, Interior Designers (501-682-3171) stating their intent to respond to an RFQ issued by Arkansas State University. Please include project name, submittal date, and proof of valid NCARB certification in the letter. Consulting and joint venture firms are also required to be licensed by the Arkansas State Board. Notification to the State Board must be made PRIOR to responding to this solicitation, and A COPY OF EITHER A VALID ARKANSAS LICENSE OR THE QUALIFYING LETTER FOR ALL TEAM MEMBER FIRMS MUST BE INCLUDED WITH SUBMITTALS. The final selected firm will have 30 days to make application for corporate licensure after they are awarded the contract. 6. Proof of current professional liability insurance coverage ($1,000,000 minimum required). 7. Disclosure Forms (See Appendix B) Selection Criteria and Process The selection committee will review Statement of Qualifications documents and grade upon the following point criteria. The (3) highest scored firms will be notified for interview by noon Tuesday May 5, 2015. Unsuccessful firms will be notified same day via email and/or phone call. Interviews for firms will occur on Wednesday and Thursday May 13 & 14, 2015 (times TBD). Interview format will be communicated prior to interview date. RFP RANKING CRITERIA

WEIGHT

1. Prior and quantity similar experience for developing a new Osteopathic medical programs 2. Demonstration of similar projects of aggressive schedule 3. Staff resources, experience, and team qualifications 4. Demonstration of project cost containment 5. Demonstration of leading a project from remote location 6. Demonstration of good design in renovated spaces 7. Other factors – Use of technology, understanding of new teaching methods, etc. TOTAL

         AState.edu                                                        

    NYIT.edu

 

20 pts 20 pts 20 pts 20 pts 20 pts 15 pts 10 pts 125 pts

4    

 

  Project Special Requirements and Schedule The project scope of renovation of Wilson Hall will have an aggressive schedule. Pursuant to Arkansas Code §19-4-1415, ASU-J will utilize construction procurement delivery method of construction manager (CM) with agreed guaranteed maximum price. The use of a CM will afford constructability input, pricing, and scheduling of advance work scope at all design stages. The design team should be advised the following project schedule is reflective of imperative milestone dates, the most important being the May 15, 2016 substantial completion. • • • • • • • • • • • • • • • • • • • • • •

April 20-22, 2015 - List advertisement Request for Qualifications for Design Professionals April 22, 2015 - List advertisement Request for Qualification for Construction Manager April 27, 2016 – List advertisement Request for Qualifications for AV Integrator May 1, 2015 - Design Professional RFQ submittal due May 1, 2015 - Construction Manager RFQ submittal due May 8, 2015 – AV Integrator RFQ submittal due May 11-15, 2015 - Interviews and selection of Design Professionals, Issue Pre-design Services PO May 11-15, 2015 - Interviews and selection of Construction Manager, Issue Pre-Construction Services PO May 11-15, 2015 – Interviews and Selection of IV Integrator, Issue PreIntegrator PO May 21 & 22, 2015 - Design Charrette June 9, 2015 - Post Schematic Design / Early Design Development budget delivered to NYIT/ASU June 10, 2015 - Method of Finance and Professional Services Contracts submitted for July Arkansas Legislative Review June10, 2015 - Long lead items specified for ASU procurement to be contractor installed at later date June 24, 2015 - Design Development Documents complete, review meeting July 1, 2015 - Arkansas Legislative Review, Deadline for Wilson Hall occupant vacancy July 6-24, 2015 - Asbestos Floor Tile Abatement July 22, 2015 - 90% Construction Documents Review, Early Demolition / Infrastructure Bid Package Due August 5, 2015 - 100% Construction Documents, Demolition Bid Opening August 17, 2015 - Contractor mobilization, begin demolition scope September 2, 2015 - Construction GMP Submitted September 21, 2015 - Demolition complete, Construction Scope begins (9) months to 100% substantial completion Progress meetings will occur weekly, onsite when possible with video conferencing to NYIT staff

         AState.edu                                                        

    NYIT.edu

 

5    

 

  • • • • • •

May 1, 2016 - Critical areas / offices substantially complete, begin commissioning of systems / labs May 15, 2015 - Begin partial occupancy with critical staff / programs June 1, 2016 - Project substantially complete, building ready for full occupancy June 15, 2016 - Post occupancy review and punch list, staff training July 1, 2016 - Complete final punch list. Begin project close-out process August 2016 – First class, NYIT Osteopathic School of Medicine at Arkansas State University

Other unique project requirement is the location of Wilson Hall in the heart of the central campus core, with no direct adjacencies of streets or parking lots. It is imperative the design team assist the owner and construction manager with logistical planning of means and methods during demolition and construction phases. Campus and Building Tour Availability – Pre and Post RFQ Submission Tours of the Wilson Hall building will be available on a limited, first scheduled basis. To schedule tours, contact David Handwork at phone numbers listed on page 1, or Janis Cook at (870) 680-4730. Spring 2015 semester classes will be in session with finals pending. Therefore, dead-day and weekend hours are the only available time for tours. Each firm will be allotted no more than (2) hours of building touring time. Friday April 24 – 3:00 – 5:00 PM Saturday April 25 – 9:00 AM-11:00 AM; 2:00- 4:00 PM Sunday April 26 – 2:00 – 4:00 PM Tuesday April 28 (Dead Day) – 7:00 AM – 9:00 AM; 9:30 AM – 11:30 PM; 1:30 PM – 3:30 PM; 4:00 PM – 6:00 PM End of RFQ Body

         AState.edu                                                        

    NYIT.edu

 

6    

 

 

APPENDIX A FLOOR PLANS OF EXISTING AND PROPOSED PROGRAM

         AState.edu                                                        

    NYIT.edu

 

7    

 

1/16" = 1'-0"

SCALE: Office

83 SF

126C

90 SF

141 SF

126E 127 SF

Computer Lab

103

103A

850 SF

346 SF

Corridor

Office

Corridor

Mechanical

FFC01

126B

KKC01

101

119 SF

100 SF

Computer Lab

125 594 SF

1782 SF

105 SF

103B

Office

145 SF

Classroom

DWN

Classroom

Office

Office

Office

102

128

127

103D

97 SF

88 SF

89 SF

4/22/2014

74 SF

Office

126D

102A

DATE

134 SF

Office

Office

REV.

103C

DATE

Office

103E

JRC

Office

Office 126A

76 SF

96 SF

Corridor AAC01 1415 SF

Janitor

Office Stairs DDS01

116

Mechanical

119

135 SF

118

33 SF

Stairs Office

325 SF

260 SF

Vending Office

117

115

357 SF

Office

Office

AAS01 256 SF

124A

124B

124C

118 SF

119 SF

117 SF

135 SF

Office 104 186 SF

Office

Corridor

114

CCC01

133 SF

Office

770 SF

Corridor

105

Office

DDC01

130 SF

332 SF

Corridor

113

BBC01

134 SF

841 SF

Classroom

Office

124

106

Office

131 SF

112

988 SF

135 SF

Elevator AAE01

Office 140 SF

111

42 SF

159 SF

Mechanical Office

110E

138 SF

EEC01

89 SF

107 SF

Women Office 109E

Office

151 SF

109

120 166 SF

212 SF

Corridor

Office Storage

JJC01

110C

105 SF

128 SF

Storage 110D

Men

517 SF

121

Classroom 123 1046 SF

167 SF

Office 109D 99 SF

Office

Office

109C

109B

102 SF

161 SF

Wilson Hall

108

Corridor

Level 1 Floor Plan

Office

Office 109A 115 SF

Office

Stairs

122

EES01

259 SF

20 SF

IT Store 110A

Stairs

Mechanical

CCS01

110

258 SF

120 SF

317 SF

IT Store 110B

Stairs

1605 SF

BBS01 255 SF

A-1

107

1/16" = 1'-0" 221C

201D

11 SF

Vestibule

Office Storage

Office Storage

203B

201C

7 SF

8 SF

204

Office

221D

115 SF

92 SF

220D

221E

23 SF

Office

Office Storage

248 SF

220A

96 SF

201

220E

130 SF

1032 SF

Office

Office Service

221

FFC02

129 SF

41 SF

8 SF

Office

Classroom

219

218

193 SF

600 SF

Office Corridor GGC02 49 SF

Office

Office Storage

202

203A

201 SF

83 SF

Office

Computer Support

221H

201B

98 SF

78 SF

Lobby

220

Office

Office

151 SF

Office Storage

221G

221F

220C

84 SF

87 SF

61 SF

4/22/2014

259 SF

232 SF

221B

REV.

203

201A

Office

DATE

Office

Office

JRC

Office

Office

DATE

Office Storage

AAV02 139 SF

DWN

6 SF

Classroom

SCALE:

Office Storage

Office Storage

AAL02

Office Storage

514 SF

Corridor

Corridor

220B

HHC02

AAC02

76 SF

747 SF

555 SF

Corridor JJC02 160 SF

Janitor 210A

Stairs

Stairs

205C

205A

166 SF

180 SF

AAS02

Seminar

256 SF

217C

Mechanical

Mechanical

377 SF

212

210

403 SF

374 SF

MAPS

Classroom 217B 355 SF

Classroom 205 775 SF

Elevator Classroom

AAE02

582 SF

Corridor

Class Storage

Corridor

205B

CCC02

193 SF

796 SF

EEC02 147 SF

Corridor

Auditorium

DDC02

211

148 SF

3200 SF

Office

Office

Corridor

209

213

BBC02

134 SF

111 SF

746 SF

Classroom

Men

206

Classroom

214

Women

1030 SF

216

199 SF

208

1030 SF

201 SF

Office Storage

Office Storage

215C

215B

77 SF

80 SF

Level 2 Floor Plan

217A

42 SF

Stairs EES02

Office

19 SF

215A 169 SF

Mechanical 207 547 SF

Stairs

Office

CCS02

207A

258 SF

118 SF

Storage 211A 2490 SF

Stairs Office 215

BBS02 255 SF

236 SF

A-2

260 SF

28 SF

Office

Office

Wilson Hall

DDS02

1/16" = 1'-0"

SCALE: 83 SF

195 SF

Office 313D 101 SF

314 584 SF

Office

Office

Office

Office

Office

Office

Office

Office

Office

311

310

309

308

307

306

305

304

176 SF

176 SF

174 SF

177 SF

165 SF

187 SF

175 SF

205 SF

Classroom

Classroom

Classroom

301

302

303 461 SF

580 SF

402 SF

DWN

Seminar Lab

313

Office Storage

Copy Room

300 SF

313E

312

132 SF

134 SF

4/22/2014

313A

84 SF

DATE

Office

REV.

313B

DATE

Office

313C

JRC

Office

Copy Room 313F

Corridor

69 SF

Corridor

DDC03

AAC03

828 SF

884 SF

IT

Storage

Stairs DDS03

Janitor

E&P Lab

260 SF

315 312 SF

Mechanical

322B

322A

43 SF

86 SF

Stairs AAS03

Classroom

321A

Mechanical

330

13 SF

323

372 SF

256 SF

382 SF

321 394 SF

Storage 322 1113 SF

Corridor

Classroom 316

BBC03

436 SF

708 SF

Classroom 329 526 SF

Elevator AAE03

Classroom Corridor

565 SF

CCC03

Classroom 328

781 SF

Office Office

Office

320

Office

327

327C

279 SF

75 SF

324

112 SF

104 SF

Office 327A

Men Women

325

317

319

192 SF

1034 SF

223 SF

Language Lab

318A

Office 327D 71 SF

Seminar 327F 311 SF

Office 97 SF

93 SF

Office

Office

Office

327B

326B

68 SF

Wilson Hall

424 SF

Level 3 Floor Plan

42 SF

316A

Office 327E 80 SF

184 SF

318B 133 SF

Office 326 173 SF

Office

CCS03 258 SF

Office 318C 98 SF

209 SF

Mechanical

Stairs

318D 136 SF

Office 326A

BBS03 255 SF

219 SF

A-3

318

Stairs

1/16" = 1'-0"

SCALE: 407

Classroom

Seminar

210 SF

406

404

Classroom

424 SF

375 SF

403

Office

402

401

211 SF

207 SF

431 SF

4/22/2014

Office

408 207 SF

DATE

84 SF

REV.

405A

200 SF

DATE

Office

JRC

Office

Office

405B

DWN

Office

Office 405 205 SF

Corridor Corridor

AAC04

DDC04

853 SF

794 SF

Mechanical

Stairs Office

Mechanical

Office

409

409A

181 SF

177 SF

AAS04

383 SF

415

Janitor

Office

Office

Office

Office

Office

Office

GA Office

400 SF

415A

416

417

418

419

420

421

427

135 SF

143 SF

111 SF

376 SF

17 SF

167 SF

143 SF

135 SF

256 SF

Corridor BBC04 746 SF

Classroom

Classroom

426

410

525 SF

523 SF

Corridor CCC04 776 SF

Elevator AAE04

Classroom

Classroom

425

411

430 SF

429 SF

Women 423 123 SF

Office 414 119 SF

Men 413 223 SF

Level 4 Floor Plan

42 SF

Wilson Hall

Utility 424B 9 SF

Politiki 424 808 SF

Classroom 412 599 SF

Class Storage Stairs

412A

CCS04

106 SF

258 SF

Office 424A 105 SF

Stairs BBS04 255 SF

A-4

260 SF

Stairs

422

DDS04

SCALE: 1/8"=1'

Mechanical Space

Adjunct Faculty

Learning Lab 3

105

Learning Lab 2 104

Learning Lab 4

Learning Lab 5

Flexible Learn Lab 6

103

102

Mechanical

125

124

123

558 SF

441 SF

432 SF

500 SF

101

447 SF

433 SF

594 SF

DATE

3-16-15

REV.

Learning Lab 1

PAC

Basic Science Suite

DWN.

DATE

Legend

1782 SF

Storage 126

IT Store

96 SF

Common Space Corridor AAC01 1415 SF

DDS01

118

260 SF

325 SF

Basic Science Staff Meeting

119

Stairs

33 SF

AAS01 256 SF

Vending 117

111

357 SF

400 SF

Flexible Office 106 185 SF

Corridor CCC01 910 SF

Faculty 7

Corridor

107 130 SF

DDC01

Faculty 8

Corridor

332 SF

112

BBC01

134 SF

841 SF

Faculty 6 108

Faculty 9

131 SF

113

Year 1 & Year 2 Classroom 122

135 SF

1963 SF 15.1 sf/student @ 130 students

Elevator AAE01

Faculty 5 109

Faculty 10

140 SF

114

42 SF

159 SF

Mechanical 110E

Work

Storage

Corridor

110A

110B

EEC01

82 SF

52 SF

107 SF

89 SF

Women 120

Department Chair Office

Admin. 110

166 SF

MEDICINE at A-State

Mechanical

NYIT COLLEGE OF OSTEOPATHIC

Janitor Stairs

115

266 SF

212 SF

Storage Storage

122A

127D

Men

517 SF

121

394 SF

167 SF

110D

115B

102 SF

161 SF

Faculty 1 115A 115 SF

Office

Stairs

127A

EES01

259 SF

20 SF

IT Store Stairs

Mechanical

CCS01

116

258 SF

127C

IT Store

317 SF

127

Stairs BBS01

1605 SF

255 SF

120 SF

127B

DRAWING NO:

Faculty 2

4

99 SF

Faculty 3

1

110C

OF

Faculty 4

SCALE: 1/8"=1' 38 SF AAV02

Campus Dean

Meeting Room 202G

Student Administration

Future Office 202F

Future Office 202E

Future Office 202C

119 SF

157 SF

120 SF

Planning & Assessment 202A

139 SF

201A

Coffee 201B

264 SF

Registrar

Admissions

Admissions

223C

223D

222A

114 SF

91 SF

96 SF

38 SF

131 SF

Storage 201D

391 SF

Corridor 202

OMM Lab

Waiting

Unassigned Space

Corridor 223

35 SF

283 SF

Coffee 202H

Restroom 202J

Restroom 202K

59 SF

34 SF

32 SF

Assistant Dean 222B 164 SF

Admin Assist

90 SF

Registrar

Interview

223B

223A

97 SF

83 SF

201

201

202L 59 SF

201 SF

78 SF

Student Life

Admin Assistant

Alumni

221B 97 SF

Corridor 221 183 SF

Admin Assistant

Waiting

Work Copy Storage

Auditorium Mechanical Space Common Space

Stairs

Media Specialist

Faculty Specialist

DDS02

203B

203A

260 SF

106 SF

122 SF

Men 221E 50 SF Coffee 221G 51 SF

221A 71 SF

AAL02

Women 221F 64 SF

Corridor

514 SF

Corridor

221D 123 SF

124 SF

Lobby

Academic Affairs

Learning Specialist

221C

222 512 SF

Computer Support

Work/Copy

Coffee 222C 44 SF Private Restroom 222D 46 SF

Corridor

HHC02

AAC02

747 SF

555 SF

JJC02 160 SF

Janitor 210A 28 SF

Student Affairs Meeting

Stairs

220

AAS02 256 SF

312 SF

Mechanical

Mechanical Media Specialist 203C

Corridor

210

203

374 SF

212 403 SF

247 SF

Coffee 203L

114 SF

59 SF

Financial Aid 1 Financial Aid 2 Financial Aid 3

Women 203K

I.T. Integrator 203D

50 SF

108 SF

217

218

219

96 SF

96 SF

140 SF

1

2

3

4

5

Men 203J 50 SF

Curriculum 203E

Storage 203H

114 SF

Elevator

53 SF

AAE02 42 SF

Curriculum 203F 131 SF

Work/ Copy 203G

Corridor

100 SF

CCC02

Corridor EEC02

Admin Assistant

213 SF

DDC02

211

147 SF

796 SF

Assistant Dean 204B

Corridor

Auditorium

148 SF

3200 SF

Unassigned Office

Storage

Storage

Waiting

209

208C

208B

204

134 SF

41 SF

40 SF

OMM Lab 213 110 SF

397 SF

Corridor

OMM Control Room

BBC02 746 SF

Instruct

6

7

MEDICINE at A-State

Legend

DATE

11 SF

Vestibule

REV.

6 SF

NYIT COLLEGE OF OSTEOPATHIC

6 SF

3-16-15

202A

PAC

202D

Private Restroom 201C DATE

Storage

DWN.

Storage

216 159 SF

214 1216 SF

Men

Storage

201 SF

Meeting Room 204A

8

Admin Assistant

EES02 19 SF

45 SF

Unassigned Room

10

215 235 SF

Unassigned Room

Stairs

294 SF

9

208 1791 SF

207 317 SF

Unassigned Room

258 SF

205 117 SF

208A 645 SF

Mechanical 206

Stairs BBS02

117 SF

255 SF

Mechanical Chase

DRAWING NO:

CCS02

Unassigned Office

4

Stairs

2

Restroom 204D

199 SF

208

OF

46 SF

214

Women

Coffee 204C

SCALE: 1/8"=1' 36 SF

Second Year

305

Surgical Sim w/ Scrub 304

584 SF

437 SF

Faculty/ Staff Training Room

Simulation Control Room 303

Auditorium

Storage

Storage

325B

325A

30 SF

43 SF

Sim ER

Skills Lab

Learning Lab 1

Learning Lab 2

Learning Lab 3

302

301

326

325

324

448 SF

206 SF

513 SF

512 SF

446 SF

145 SF

DWN.

51 SF

Learning Lab 4

Learning Lab 5

323

322

446 SF

551 SF

DATE

322A

REV.

303A

3-16-15

Storage

PAC

Storage

DATE

Legend

Storage Storage

Gross Anatomy Scrub

Storage

323A

326A

324A

36 SF

30 SF

43 SF

Mechanical Space Corridor

Common Space

DDC03

Corridor

828 SF

AAC03 884 SF

Exam Room 308H

260 SF

117 SF

121 SF

312A 13 SF

Storage

IT

313A

313B

43 SF

86 SF

Stairs AAS03 256 SF

Mechanical Mechanical

314

312

382 SF

Corridor BBC03 150 SF

394 SF

Auditorium Balcony

Exam Room 308F

313 1113 SF

95 SF

Exam Room 308J 99 SF

Exam Room 308E 120 SF

Exam Room 308K

Gross Anatomy Lab 319

102 SF

1927 SF

Elevator AAE03

Exam Room 308D 122 SF

42 SF

Exam Room 308M

Corridor

100 SF

CCC03 781 SF

Corridor 315 619 SF

Exam Room 308N

Exam Room 308C

97 SF

97 SF

ICC Office 4

Women's Locker Room

308B

311

315A

Gross Anatomy Cold Room 319B

283 SF

112 SF

291 SF

199 SF

ICC Control Room

MEDICINE at A-State

DDS03

Exam Room 308G

NYIT COLLEGE OF OSTEOPATHIC

Janitor Stairs

Receptionist

Women Standardized Patients Showers, Lockers and Restrooms 308A

308

310

638 SF

223 SF

Prep. Lab 319A

Patient Waiting

223 SF

ICC Office 3

262 SF 309D 97 SF

ICC Office 2 309C 133 SF

Men's Locker Room 315B 298 SF

ICC Common Area

98 SF

Storage

309B

315C

136 SF

256 SF

Stairs BBS03 255 SF

DRAWING NO:

258 SF

309A

Mechanical

4

CCS03

ICC Office 1

209 SF

3

Stairs

OF

309

Faculty Office 4 402E

Faculty Office 5 402F

Faculty Office 6 402G

Faculty Office 7 401D

214 SF

97 SF

97 SF

97 SF

103 SF

100 SF

117 SF

118 SF

94 SF

3-16-15

REV.

Faculty Office 3 402D

PAC

402A

Faculty Office 2 402C

DATE

SCALE: 1/8"=1'

Clinical Adjuncts

Faculty Office 1 402B

Department Chair

Clinical Meeting Room 403

Faculty Office 9 401B

DWN.

Faculty Office 8 401C

DATE

Legend

129 SF

427 SF

Opti Department 402

Reference

Work/ Copy 402K

406 SF

Admin Assist

88 SF

Silent Study

Storage 402J

Storage 402H

41 SF

51 SF

111 SF

Corridor DDC04

853 SF

Research

794 SF

Mechanical

366 SF

410

Janitor

400 SF

410A 17 SF

Student Fellows' Office 411 167 SF

Research Office 2 412 143 SF

Research Office 3 413 135 SF

Research Office 4 414 135 SF

Research Office 5 415 143 SF

Research Office 6 416

Mechanical

111 SF

383 SF

256 SF

Flexible Space

417

423 376 SF

1

Silent Study

2

3

405

Corridor

523 SF

BBC04

Adjunct Professors 422

746 SF

525 SF

6

5

4

Corridor CCC04 776 SF

Elevator AAE04

Opti Director 421B

Administrative Assistant

42 SF

128 SF

Silent Study

421

406

Work/ Copy 421A

195 SF

429 SF

95 SF

Waiting

Women 418 123 SF

Office

MEDICINE at A-State

404

NYIT COLLEGE OF OSTEOPATHIC

AAS04

409 119 SF

Men 408 223 SF

Library 419

Silent Study

818 SF

407 599 SF

Storage CCS04

106 SF

258 SF

Stairs Librarian Office

BBS04

419A

255 SF

103 SF

DRAWING NO:

407A

4

Stairs

4

260 SF

Stairs

Silent Study

OF

Stairs DDS04

Common Space

182 SF

Corridor AAC04

Mechanical Space

401

Faculty Office 10 401A

 

APPENDIX B ARKANSAS DISCLOSURE FORMS

         AState.edu                                                        

    NYIT.edu

 

8    

 

CONTRACT AND GRANT DISCLOSURE AND CERTIFICATION FORM Failure to complete all of the following information may result in a delay in obtaining a contract, lease, purchase agreement, or grant award with any Arkansas State Agency. SUBCONTRACTOR:

Yes

SUBCONTRACTOR NAME:

No IS THIS FOR:

Goods?

TAXPAYER ID NAME: YOUR LAST NAME:

Services?

Both?

FIRST NAME:

M.I.:

ADDRESS: CITY:

STATE:

ZIP CODE:

---

COUNTRY:

AS A CONDITION OF OBTAINING, EXTENDING, AMENDING, OR RENEWING A CONTRACT, LEASE, PURCHASE AGREEMENT, OR GRANT AWARD WITH ANY ARKANSAS STATE AGENCY, THE FOLLOWING INFORMATION MUST BE DISCLOSED:

F

I

O R

N D I V I D U A L S

*

Indicate below if: you, your spouse or the brother, sister, parent, or child of you or your spouse is a current or former: member of the General Assembly, Constitutional Officer, State Board or Commission Member, or State Employee:

Mark (√)

Position Held

Current

Former

Name of Position of Job Held [senator, representative, name of board/ commission, data entry, etc.]

For How Long? From MM/YY

To MM/YY

What is the person(s) name and how are they related to you? [i.e., Jane Q. Public, spouse, John Q. Public, Jr., child, etc.] Person’s Name(s)

Relation

General Assembly

Constitutional Officer State Board or Commission Member State Employee None of the above applies

F

O R

A

V

E N D O R

( B

U S I N E S S

) *

Indicate below if any of the following persons, current or former, hold any position of control or hold any ownership interest of 10% or greater in the entity: member of the General Assembly, Constitutional Officer, State Board or Commission Member, State Employee, or the spouse, brother, sister, parent, or child of a member of the General Assembly, Constitutional Officer, State Board or Commission Member, or State Employee. Position of control means the power to direct the purchasing policies or influence the management of the entity. What is the person(s) name and what is his/her % of ownership interest and/or Mark (√) For How Long? Name of Position of Job Held what is his/her position of control? Position Held [senator, representative, name of Ownership Position of From To Current Former board/commission, data entry, etc.] Person’s Name(s) MM/YY MM/YY Interest (%) Control

General Assembly

Constitutional Officer State Board or Commission Member State Employee None of the above applies

Rev. 08/20/07

Contract and Grant Disclosure and Certification Form Failure to make any disclosure required by Governor’s Executive Order 98-04, or any violation of any rule, regulation, or policy adopted pursuant to that Order, shall be a material breach of the terms of this contract. Any contractor, whether an individual or entity, who fails to make the required disclosure or who violates any rule, regulation, or policy shall be subject to all legal remedies available to the agency. As an additional condition of obtaining, extending, amending, or renewing a contract with a state agency I agree as follows: 1. Prior to entering into any agreement with any subcontractor, prior or subsequent to the contract date, I will require the subcontractor to complete a CONTRACT AND GRANT DISCLOSURE AND CERTIFICATION FORM. Subcontractor shall mean any person or entity with whom I enter an agreement whereby I assign or otherwise delegate to the person or entity, for consideration, all, or any part, of the performance required of me under the terms of my contract with the state agency. 2. I will include the following language as a part of any agreement with a subcontractor:

Failure to make any disclosure required by Governor’s Executive Order 98-04, or any violation of any rule, regulation, or policy adopted pursuant to that Order, shall be a material breach of the terms of this subcontract. The party who fails to make the required disclosure or who violates any rule, regulation, or policy shall be subject to all legal remedies available to the contractor. 3. No later than ten (10) days after entering into any agreement with a subcontractor, whether prior or subsequent to the contract date, I will mail a copy of the CONTRACT AND GRANT DISCLOSURE AND CERTIFICATION FORM completed by the subcontractor and a statement containing the dollar amount of the subcontract to the state agency.

I certify under penalty of perjury, to the best of my knowledge and belief, all of the above information is true and correct and that I agree to the subcontractor disclosure conditions stated herein. Signature___________________________________________Title____________________________Date_________________ Vendor Contact Person________________________________Title____________________________Phone No._________ Agency use only

Agency Agency Agency Contact Contract Number______ Name___________________ Contact Person________________Phone No.___________ or Grant No._____

Rev. 08/20/07