City of Columbus, Department of Public Service Traffic Signal Installation


City of Columbus, Department of Public Service Traffic Signal Installation10ba4283a7fbcc3461c6-31fb5188b09660555a4c2fcc1bea63d9.r13.cf1.rackcdn.com/...

4 downloads 146 Views 112KB Size

City of Columbus, Department of Public Service Traffic Signal Installation - Dexter Falls at Hayden Run Road (540007-100041) & Tussing Road at Highland Park Drive (540007-100042)

“This bid tabulation is distributed for informational purposes only and is limited to showing the prices for each item and the total bid amount submitted by a contractor. The Director of Public Service recommends a bid for award after evaluating the bids to determine which contractor is the lowest, responsive, responsible, and best bidder as set forth in Chapter 329 of the City Code. The award of any contract is contingent upon the passage of an ordinance by City Council.”

SA005442 Bid Tab June 18, 2014 Engineer's Estimate Group Number 1 1 1 1 1 1 1 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4

Group Name ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY ROADWAY EROSION CONTROL EROSION CONTROL EROSION CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC CONTROL TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS

Ref. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63

Item No.

202 204 304 448 608 608 608 207 207 207 630 630 630 630 630 630 630 642 644 644 644 644 644 644 625 625 625 625 625 625 625 625 625 625 625 630 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 632 633

PAVEMENT REMOVAL SUBGRADE COMPACTION 6" AGGREGATE BASE 2.5" SURFACE COURSE (LIGHT DUTY), PG64-22 8" CONCRETE WALK CURB RAMP, TYPE A DETECTABLE WARNING

UNITS SY SY CY CY SF EA EA EA EA FT FT SF SF EA EA EA EA MILE FT FT FT MILE EA FT FT FT FT FT FT EA EA FT FT EA EA LS EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA EA FT FT FT FT FT FT FT EA EA EA

DESCRIPTION

INLET PROTECTION (DANDY BAG) INLET PROTECTION (BEAVER DAM) PERIMETER FILTER FABRIC FENCE

GROUND MOUNTED SUPPORT, NO. 3 POST SIGN, FLAT SHEET, AS PER PLAN STREET NAME SIGN SIGN SUPPORT ASSEMBLY, POLE MOUNTED, AS PER PLAN REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSAL REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL REMOVAL OF POLE MOUNTED STREET NAME SIGN, AS PER PLAN CENTER LINE (SINGLE YELLOW), TYPE 1 STOP LINE CROSSWALK LINE CHANNELIZING LINE, 8" CENTER LINE, DOUBLE YELLOW BIKE MARKING REMOVAL OF PAVEMENT MARKING CONDUIT, 2", 725.051 CONDUIT, 3", 725.051 CONDUIT, CONCRETE ENCASED, 2", 725.051 TRENCH TRENCH, 30" DEEP, AS PER PLAN PULL BOX, 725.06, 12"x18", AS PER PLAN PULL BOX, 27" GROUND ROD NO. 4 AWG 600 VOLT DISTRIBUTION CABLE, AS PER PLAN BRACKET ARM, 25' BRACKET ARM, 30' SIGNING MISC: TRAFFIC SIGNAL SIGNS VEHICULAR SIGNAL HEAD, (LED) 3 SECTION, 12 INCH LENS, 1 WAY (WITH BACKPLATE), , AS PER PLAN VEHICULAR SIGNAL HEAD, (LED) 5 SECTION, 12 INCH LENS, 1 WAY (WITH BACKPLATE), , AS PER PLAN PEDESTRIAN SIGNAL HEAD (LED), COUNTDOWN, AS PER PLAN PEDESTRIAN PUSHBUTTON, AS PER PLAN DETECTOR LOOP COVERING OF VEHICULAR SIGNAL HEAD, AS PER PLAN COVERING OF PEDESTRIAN SIGNAL HEAD, AS PER PLAN STRAIN POLE FOUNDATION PEDESTAL FOUNDATION SIGNALIZATION MISC: SLEEVE FOR ANCHOR BASE FOUNDATION PEDESTAL, 5' TRANSFORMER BASE PEDESTAL, 10.7' TRANSFORMER BASE STRAIN POLE, TYPE 4170, DESIGN #6, AS PER PLAN STRAIN POLE, TYPE 4170, DESIGN #7, AS PER PLAN STRAIN POLE, TYPE 4170, DESIGN #8, AS PER PLAN CONDUIT RISER, 2" DIA. MESSENGER WIRE, 7 STRAND, 3/8 INCH DIA. WITH ACCESSORIES TETHER WIRE WITH ACCESSORIES SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG SIGNAL CABLE, 9 CONDUCTOR, NO. 14 AWG LOOP DETECTOR LEAD-IN CABLE POWER CABLE, 3 CONDUCTOR, NO. 6 AWG SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG POWER SERVICE SIGNALIZATION, MISC: VIDEO DETECTION SYSTEM CABINET FOUNDATION

1 of 2

QUANTITY 31.00 31.00 5.10 2.20 330.00 6.00 6.00 4.00 4.00 100.00 84.00 23.50 32.00 9.00 7.00 6.00 6.00 0.05 103.00 240.00 10.00 0.01 5.00 24.00 874.00 17.00 185.00 753.00 53.00 4.00 2.00 16.00 78.00 2.00 5.00 1.00 12.00 3.00 10.00 4.00 2.00 14.00 10.00 8.00 4.00 1.00 3.00 1.00 4.00 3.00 1.00 2.00 569.00 569.00 1,155.00 495.00 1,607.00 250.00 260.00 2.00 2.00 2.00

UNIT COST $10.00 $3.00 $50.00 $190.00 $7.50 $810.00 $155.00 $250.00 $200.00 $2.00 $10.00 $15.00 $15.00 $100.00 $11.00 $10.00 $10.00 $3,400.00 $6.00 $3.00 $1.00 $3,400.00 $100.00 $1.50 $4.50 $7.00 $30.00 $9.00 $9.00 $600.00 $1,200.00 $175.00 $5.00 $1,000.00 $1,000.00 $500.00 $875.00 $1,200.00 $700.00 $450.00 $950.00 $40.00 $25.00 $2,500.00 $700.00 $100.00 $600.00 $800.00 $7,000.00 $8,000.00 $9,000.00 $100.00 $10.50 $13.00 $2.80 $3.50 $5.50 $5.50 $5.50 $1,000.00 $20,000.00 $2,000.00

TOTAL $310.00 $93.00 $255.00 $418.00 $2,475.00 $4,860.00 $930.00 $1,000.00 $800.00 $200.00 $840.00 $352.50 $480.00 $900.00 $77.00 $60.00 $60.00 $170.00 $618.00 $720.00 $10.00 $34.00 $500.00 $36.00 $3,933.00 $119.00 $5,550.00 $6,777.00 $477.00 $2,400.00 $2,400.00 $2,800.00 $390.00 $2,000.00 $5,000.00 $500.00 $10,500.00 $3,600.00 $7,000.00 $1,800.00 $1,900.00 $560.00 $250.00 $20,000.00 $2,800.00 $100.00 $1,800.00 $800.00 $28,000.00 $24,000.00 $9,000.00 $200.00 $5,974.50 $7,397.00 $3,234.00 $1,732.50 $8,838.50 $1,375.00 $1,430.00 $2,000.00 $40,000.00 $4,000.00

U.S. Utility Contractor Co., Inc. UNIT COST TOTAL $17.70 $548.70 $3.54 $109.74 $106.20 $541.62 $944.00 $2,076.80 $24.78 $8,177.40 $560.50 $3,363.00 $177.00 $1,062.00 $147.50 $590.00 $147.50 $590.00 $11.80 $1,180.00 $34.22 $2,874.48 $88.53 $2,080.46 $141.60 $4,531.20 $708.00 $6,372.00 $135.70 $949.90 $135.70 $814.20 $135.70 $814.20 $6,230.40 $311.52 $9.44 $972.32 $3.84 $921.60 $3.54 $35.40 $9,440.00 $94.40 $171.10 $855.50 $23.60 $566.40 $3.75 $3,277.50 $12.96 $220.32 $13.86 $2,564.10 $8.67 $6,528.51 $14.49 $767.97 $374.90 $1,499.60 $1,068.40 $2,136.80 $204.40 $3,270.40 $3.52 $274.56 $1,746.48 $3,492.96 $1,956.52 $9,782.60 $2,332.00 $2,332.00 $873.70 $10,484.40 $1,462.14 $4,386.42 $588.90 $5,889.00 $357.20 $1,428.80 $1,297.23 $2,594.46 $101.90 $1,426.60 $53.90 $539.00 $2,575.73 $20,605.84 $939.27 $3,757.08 $432.72 $432.72 $846.90 $2,540.70 $1,511.66 $1,511.66 $4,899.86 $19,599.44 $5,272.74 $15,818.22 $5,414.34 $5,414.34 $458.93 $917.86 $8.45 $4,808.05 $16.15 $9,189.35 $2.39 $2,760.45 $3.16 $1,564.20 $1.68 $2,699.76 $5.26 $1,315.00 $5.65 $1,469.00 $827.00 $1,654.00 $11,574.00 $23,148.00 $1,609.59 $3,219.18

M P Dory Co UNIT COST TOTAL $60.00 $1,860.00 $5.40 $167.40 $130.00 $663.00 $540.00 $1,188.00 $14.00 $4,620.00 $700.00 $4,200.00 $190.00 $1,140.00 $135.00 $540.00 $135.00 $540.00 $1.00 $100.00 $15.00 $1,260.00 $27.50 $646.25 $55.00 $1,760.00 $490.00 $4,410.00 $40.00 $280.00 $20.00 $120.00 $40.00 $240.00 $5,700.00 $285.00 $8.60 $885.80 $3.50 $840.00 $3.20 $32.00 $8,640.00 $86.40 $160.00 $800.00 $22.00 $528.00 $5.80 $5,069.20 $14.00 $238.00 $12.00 $2,220.00 $7.50 $5,647.50 $9.00 $477.00 $650.00 $2,600.00 $1,800.00 $3,600.00 $250.00 $4,000.00 $3.00 $234.00 $2,280.00 $4,560.00 $2,680.00 $13,400.00 $2,000.00 $2,000.00 $780.00 $9,360.00 $1,440.00 $4,320.00 $480.00 $4,800.00 $360.00 $1,440.00 $1,200.00 $2,400.00 $40.00 $560.00 $20.00 $200.00 $2,930.00 $23,440.00 $750.00 $3,000.00 $300.00 $300.00 $630.00 $1,890.00 $1,340.00 $1,340.00 $4,540.00 $18,160.00 $5,030.00 $15,090.00 $5,230.00 $5,230.00 $690.00 $1,380.00 $9.40 $5,348.60 $13.20 $7,510.80 $2.50 $2,887.50 $3.60 $1,782.00 $2.00 $3,214.00 $4.65 $1,162.50 $2.20 $572.00 $450.00 $900.00 $20,800.00 $41,600.00 $1,770.00 $3,540.00

Complete General Construction Company UNIT COST TOTAL $65.00 $2,015.00 $25.00 $775.00 $120.00 $612.00 $800.00 $1,760.00 $20.00 $6,600.00 $160.00 $960.00 $280.00 $1,680.00 $200.00 $800.00 $260.00 $1,040.00 $6.50 $650.00 $30.00 $2,520.00 $75.00 $1,762.50 $150.00 $4,800.00 $600.00 $5,400.00 $120.00 $840.00 $120.00 $720.00 $120.00 $720.00 $6,000.00 $300.00 $10.00 $1,030.00 $3.50 $840.00 $3.00 $30.00 $9,000.00 $90.00 $400.00 $2,000.00 $20.00 $480.00 $4.00 $3,496.00 $7.50 $127.50 $12.50 $2,312.50 $5.50 $4,141.50 $6.00 $318.00 $400.00 $1,600.00 $1,400.00 $2,800.00 $150.00 $2,400.00 $4.00 $312.00 $1,800.00 $3,600.00 $1,900.00 $9,500.00 $900.00 $900.00 $650.00 $7,800.00 $1,200.00 $3,600.00 $500.00 $5,000.00 $325.00 $1,300.00 $1,200.00 $2,400.00 $30.00 $420.00 $30.00 $300.00 $2,850.00 $22,800.00 $875.00 $3,500.00 $1,500.00 $1,500.00 $750.00 $2,250.00 $1,500.00 $1,500.00 $4,000.00 $16,000.00 $4,500.00 $13,500.00 $4,600.00 $4,600.00 $450.00 $900.00 $12.00 $6,828.00 $20.00 $11,380.00 $2.50 $2,887.50 $3.00 $1,485.00 $1.50 $2,410.50 $5.00 $1,250.00 $5.00 $1,300.00 $1,400.00 $2,800.00 $17,500.00 $35,000.00 $2,000.00 $4,000.00

Asplundh Construction Corporation UNIT COST TOTAL $58.30 $1,807.30 $5.30 $164.30 $127.00 $647.70 $530.00 $1,166.00 $13.80 $4,554.00 $689.00 $4,134.00 $186.00 $1,116.00 $133.00 $532.00 $133.00 $532.00 $1.10 $110.00 $30.70 $2,578.80 $79.50 $1,868.25 $127.00 $4,064.00 $386.00 $3,474.00 $122.00 $854.00 $122.00 $732.00 $327.00 $1,962.00 $5,597.00 $279.85 $8.50 $875.50 $3.40 $816.00 $3.20 $32.00 $8,480.00 $84.80 $154.00 $770.00 $21.20 $508.80 $3.50 $3,059.00 $1.70 $28.90 $9.80 $1,813.00 $11.40 $8,584.20 $32.40 $1,717.20 $535.00 $2,140.00 $967.00 $1,934.00 $102.00 $1,632.00 $4.90 $382.20 $2,134.00 $4,268.00 $2,347.00 $11,735.00 $6,996.00 $6,996.00 $704.00 $8,448.00 $1,253.00 $3,759.00 $485.00 $4,850.00 $347.00 $1,388.00 $836.00 $1,672.00 $55.00 $770.00 $48.40 $484.00 $1,866.00 $14,928.00 $483.00 $1,932.00 $449.00 $449.00 $845.00 $2,535.00 $1,603.00 $1,603.00 $5,038.00 $20,152.00 $5,255.00 $15,765.00 $5,561.00 $5,561.00 $665.00 $1,330.00 $5.70 $3,243.30 $9.00 $5,121.00 $2.00 $2,310.00 $2.50 $1,237.50 $1.40 $2,249.80 $2.00 $500.00 $2.00 $520.00 $411.00 $822.00 $21,496.00 $42,992.00 $1,699.00 $3,398.00

Group Number 4 4 4 5 5 5 5 9

Group Name TRAFFIC SIGNALS TRAFFIC SIGNALS TRAFFIC SIGNALS MISCELLANEOUS MISCELLANEOUS MISCELLANEOUS MISCELLANEOUS Force Account

Ref. No. 64 65 66 67 68 69 70 359

Item No.

633 633 633 614 614 614 624

SPEC

UNITS EA EA EA LS HR HR LS PCT

DESCRIPTION

CONTROLLER WORK PAD CONTROLLER UNIT W/CABINET, 4 PH, P44, BASE MOUNTED, AS PER PLAN CONTROLLER UNIT W/CABINET, 8 PH, P44, BASE MOUNTED, AS PER PLAN MAINTAINING TRAFFIC, AS PER PLAN LAW ENFORCEMENT OFFICER WITHOUT PATROL CAR, AS PER PLAN LAW ENFORCEMENT OFFICER WITHOUT PATROL CAR, AS PER PLAN MOBILIZATION

CONTINGENCY (12%)

GRAND TOTAL:

2 of 2

QUANTITY 2.00 1.00 1.00 1.00 12.00 12.00 1.00 1.00

UNIT COST $350.00 $17,000.00 $17,000.00 $5,000.00 $50.00 $50.00 $5,000.00 $33,928.32

TOTAL $700.00 $17,000.00 $17,000.00 $5,000.00 $600.00 $600.00 $5,000.00 $33,928.32 $316,664.32

UNIT COST $239.20 $7,944.00 $8,321.60 $20,062.00 $67.26 $49.56 $2,258.00 $31,946.34

TOTAL $478.40 $7,944.00 $8,321.60 $20,062.00 $807.12 $594.72 $2,258.00 $31,946.34 $298,165.87

UNIT COST $200.00 $9,800.00 $10,150.00 $10,000.00 $65.00 $45.00 $2,600.00 $32,032.19

TOTAL $400.00 $9,800.00 $10,150.00 $10,000.00 $780.00 $540.00 $2,600.00 $32,032.19 $298,967.14

UNIT COST $375.00 $9,800.00 $10,000.00 $10,000.00 $65.00 $46.00 $10,000.00 $32,223.00

TOTAL $750.00 $9,800.00 $10,000.00 $10,000.00 $780.00 $552.00 $10,000.00 $32,223.00 $300,748.00

UNIT COST $806.00 $8,097.00 $8,481.00 $42,513.00 $58.30 $79.50 $10,000.00 $35,799.48

TOTAL $1,612.00 $8,097.00 $8,481.00 $42,513.00 $699.60 $954.00 $10,000.00 $35,799.48 $334,128.48