Contractor


[PDF]Contractor - Rackcdn.com10ba4283a7fbcc3461c6-31fb5188b09660555a4c2fcc1bea63d9.r13.cf1.rackcdn.com...

0 downloads 277 Views 99KB Size

Contractor/ Vendor Submitting Timestamp Bid

Contractor/ Vendor Phone Number:

Service Provider Charge POP Installation/ (Recurring Contractor/ Vendor Email Location One Time Monthly Address: A: Charge Charge)

Additional Notes

By Checking the Box Below I acknowledge and certify that all the above information is correct and current. Any unforeseen costs Name/ Title shall hereby be Pending of bid the responsibility Circuit submitter: of the Contractor. Number

3Mbps/3Mbps $513 MRC $950 NRC 5Mbps/5Mbps $523 MRC $950 NRC 10Mbps/10Mbps $583 MRC $950 NRC 20Mbps/20Mbps $655 MRC $950 NRC 50Mbps/50Mbps $885 MRC $950 NRC 100Mbps/100Mbps $1095 MRC $950 NRC 7/10/2014 9:34:55 Visionary

7/14/2014 9:43:51 Charter

307.685.5536 [email protected]

See chart

See chart

307 251-2746 [email protected]

please see additional notes for options

please see additional notes for options

Construction estimate: $4750 NRC Multiple monthly and one time charge options at 1130 Sheridan Ave Suite 110 Cody Wy for Layer 2 fiber Ethernet service to be delivered to Z location at 2001 Capitol Ave Cheyenne, WY on an existing Charter Ethernet port/circuit on a 36 month term. Pricing is subject to final engineering site survey prior to contract. 10 Mbps Layer 2 fiber Ethernet symmetrical bandwidth: $615 monthly, $19,000 installation. 20 Mbps Layer 2 fiber Ethernet symmetrical bandwidth: $675 monthly, $17,000 installation. 30 Mbps Layer 2 fiber

POP Location A and Contact: 1130 Sheridan Ave Ste 110, Cody Service WY Provider Contact: Identification Bill Oates Number Installation 307-777(SPIN) Timeframe 3995

Signature/ Affirmation of Bid

WY20141130Sher

60 days from time of contract 143026108 signature

Larry Pastor/Major Account Signature/ Executive Affirmation of Bid

1130 Sheridan Ave Suite 110 Cody WY

1130 Sherian Ave Suite 110 Cody 143027752 90-120 days WY

Brian Worthen

1130 Sheridan Ave, Cody WY

Ethernet symmetrical bandwidth: $700 monthly, $17,000 installation. 50 Mbps Layer 2 fiber Ethernet symmetrical bandwidth: $800 monthly, $14,000 installation. 100 Mbps Layer 2 fiber Ethernet symmetrical bandwidth: $975 monthly, $10,000 installation. 200 Mbps Layer 2 fiber Ethernet symmetrical bandwidth: $1025 monthly, $9,000 installation. 300 Mbps Layer 2 fiber Ethernet symmetrical bandwidth: $1075 monthly, $7,000 installation.

7/14/2014 13:49:26 TCT

7/14/2014 13:50:17 TCT

307-568-3357 [email protected]

307-568-3357 [email protected]

$8000

$8000

This bid includes cost to install a circuit at 1130 Sheridan Ave Ste 110. This will be delivered to the TCT aggregation point. MRC reflects a 3 year term. Please note that upon approval of this bid, TCT would need authorization from the property owner in order move forward with $322 construction. This bid includes cost to install a circuit at 1130 Sheridan Ave Ste 110. This will be delivered to the TCT aggregation point. MRC reflects a 3 year term. Please note that upon approval of this bid, TCT would need authorization from the property owner in order move forward with $644 construction.

Patrick/ Business Development Signature/ Executive Affirmation of Bid

TBD

143004957

10/30/2014 10 Mbps

Patrick/ Business Development Signature/ Executive Affirmation of Bid

TBD

143004957

10/30/2014 20 Mbps

7/14/2014 14:19:20 TCT

7/14/2014 14:20:18 TCT

7/14/2014 14:21:01 TCT

7/14/2014 14:21:41 TCT

307-568-3357 [email protected]

307-568-3357 [email protected]

307-568-3357 [email protected]

307-568-3357 [email protected]

$8000

$8000

$8000

$8000

$1610

$2484

$3289

$3680

This bid includes cost to install a circuit at 1130 Sheridan Ave Ste 110. This will be delivered to the TCT aggregation point. MRC reflects a 3 year term. Please note that upon approval of this bid, TCT would need authorization from the property owner in order move forward with construction. This bid includes cost to install a circuit at 1130 Sheridan Ave Ste 110. This will be delivered to the TCT aggregation point. MRC reflects a 3 year term. Please note that upon approval of this bid, TCT would need authorization from the property owner in order move forward with construction. This bid includes cost to install a circuit at 1130 Sheridan Ave Ste 110. This will be delivered to the TCT aggregation point. MRC reflects a 3 year term. Please note that upon approval of this bid, TCT would need authorization from the property owner in order move forward with construction. This bid includes cost to install a circuit at 1130 Sheridan Ave Ste 110. This will be delivered to the TCT aggregation point. MRC reflects a 3 year term. Please note that upon approval of this bid, TCT would need authorization from the property owner in order

Patrick/ Business Development Signature/ Executive Affirmation of Bid

TBD

143004957

10/30/2014 50 Mbps

Patrick/ Business Development Signature/ Executive Affirmation of Bid

TBD

143004957

10/30/2014 100 Mbps

Patrick/ Business Development Signature/ Executive Affirmation of Bid

TBD

143004957

10/30/2014 500 Mbps

Patrick/ Business Development Signature/ Executive Affirmation of Bid

TBD

143004957

10/30/2014 1000 Mbps

move forward with construction.

7/14/2014 14:27:03 CenturyLink

3072876489 [email protected]

600

143005231

Jess Ollila / Account Manager

Signature/ Affirmation of Bid

52169468

tbd - based 143005231 on contract

1130 Sheridan Ave., Cody, WY