FLOOR 2nd 3rd 4th


[PDF]FLOOR 2nd 3rd 4th - Rackcdn.comc24110ab053e5c234c6f-9b7150e100ab604df0aafbaf58c9fe02.r58.cf3.rackcdn.com/...

0 downloads 290 Views 174KB Size

Core A

General Notes

Core C

C

300 34 EQ

42.5

EQ

FLOOR

42.5

Entrance Lobbies Core C 1:5

EQ

34 EQ

76 EQ

FLOOR

Typical Sign Height 1:10

42.5 EQ

FLATS

All elements of work and materials are to comply with Building Regulations and British Standards, good industry practice and the recommendations of material and component manufacturers.

22 22 22 22

22

30

34 EQ

FLOOR

22

76

42.5

EQ

FLATS

46

6th 5th 4th 3rd 2nd 1st

11-12

34-35 36-40

09-10 07-08

This drawing is to be read in conjunction with all other relevant documentation including that produced by other consultants, subcontractors and suppliers.

05-06 03-04

Refer to Structural Engineer's drawings and specifications for all information on structural frame/ elements.

01-02

01-05

Refer to Mechanical Engineer's drawings and specifications for all information on mechanical and electrical items.

All Signage drawings to be read in conjuction with each other: 1310(AS)12/04 - 1310(AS)12/13

22

34 EQ

76 EQ

42.5 EQ

FLOOR

FLATS

5th 4th 3rd 2nd

13-14

46

12-15

105 EQ

30

Entrance Lobbies Core D 1:5

16-18

All products are to be suitable for their purpose. The Contractor is to install all products where noted in accordance with manufacturers' recommendations/specifications and inform the Architect of any discrepancies or changes in the specification before proceeding with the work.

Key

22 22

04-07

22

282

22

08-11

22

22

03 01-02

09-12 05-08 01-04

30

22

22 22 22 22 22 22 22 22 22 22

06-10

2nd Floor

300

30

22

11-15

FLATS

Core D

EQ

42.5

5th 4th 3rd 2nd 1st Grd

16-20

FLOOR

All drawings are indicative only. The sub-contractor is to submit shop drawings to the contract administrator of all the relevant components and elements for comment prior to fabrication.

1500

105 EQ

22

326

22

01-06

21-25

30

42.5

5th 4th 3rd 2nd Grd

22

07-12

300

370

EQ

22

22 22

13-16

30

22

22

22

238

4th 3rd 2nd

Core B Entrance Lobbies Core B 1:5

105

Copyright Stephen Davy Peter Smith Architects 2014

All dimensions are given in millimetres, and internal dimensions are taken to face of blockwork. Do not scale from the drawing. All dimensions and conditions to be checked and confirmed on site by the Contractor. The Contractor should inform the Architect of any discrepancies before proceeding with the work.

46

FLATS

46

22

76

30

EQ

30

Entrance Lobbies Core A 1:5

105

22

42.5

300

Rev

Comment

By

Date

CONSTRUCTION 220 42 EQ

FFL

01-03 04-06 TYPICAL SIGNAGE DETAILS Typical Lift Sign All Floors 1:5 300 216

300 42

30

Stair / Elevator / Exit Direction 1:5

STAIRS 150

22 30

82

30 30

BIKE STORE A

240

30

Brushed stainless steel plate, edges rounded, 2 mm thick, sizes as shown, Text, number engraved 0.5 mm and blackened, Font: Arial, Text and arrow centred

Durkan Ltd Durkan House 214-224 High Street Waltham Cross Hertfordshire EN8 7DU Project Title

Union Road Union Road / Clapham Road Clapham SW4 Drawing Title

30

42

22 12 22 12 22

83

30

134

30

300 83

116

Client

30

Flats 01-06

Fanshaw House, Fanshaw Street, London N1 6HX Tel: 020 7739 2020 Fax: 020 7739 2021 E-mail: [email protected] Website: www.davysmitharchitects.co.uk

2nd Floor

22

151

18 11 18 22

22

2nd Floor

Typical Stair Sign All Floors 1:5

22 12 22

30

30

30

EQ

160

30

30

151

136

15122 18 11 18

42

Stephen Davy Peter Smith Architects

220

ELEVATOR & STAIRS

Typical Signage Details Note: Drawings are indicative only. Sub-contractor to submit shop drawings prior to fabrication. Signage to comply with all relevant British Standards.

Job No.

Drawn By

Date

Checked by

1310

Oct 2014 Drawing No.

AM

Scale 1:5/1:10 @ A3

GD

1310(AS)12/04

Revision -