VOLUSIA TRANSPORTATION PLANNING ORGANIZATION FEASIBILITY STUDY – “FINAL” City of Port Orange, Florida Project: Herbert Street Sidewalk Bicycle/Pedestrian Facility South Nova Road (SR 5A) to Jackson Street GAI Project No. A091305.02

Prepared for: Volusia Transportation Planning Organization March 21, 2011

Final March 2011 Volusia Transportation Planning Organization Herbert Street Sidewalk Bicycle/Pedestrian Facility - Feasibility Study South Nova Road (SR 5A) to Jackson Street Sponsor: City of Port Orange, Florida

Table of Contents Executive Summary

1

1. Introduction

3

Project Purpose and Scope

4

Project Description

4

Segment One

4

Segment Two

4

Project Cost Summary

4

Project Concept

5

2. Exhibits Exhibit 1

Vicinity Map

Exhibit 2

Land Use Map

10

Exhibit 3

Concept Plan and Typical Cross Sections

11

Exhibit 4

Utility Data

25

Exhibit 5

Photographic Documentation of Existing Conditions

28

3. Appendices Appendix A Engineer’s Opinion of Probable Construction Cost Appendix B FDOT Long Range Estimate (LRE) Reports

9

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Executive Summary The Herbert Street Sidewalk Bicycle/Pedestrian Facility, when constructed, will become an important component of the City’s overall multi-modal transportation system. This bicycle/pedestrian link provides the connectivity from several schools with the city’s recreational facilities and a large portion of their service offices. The corridor also has historic value to the local community. The scope of this feasibility study is to address the project as proposed by the applicant, the City of Port Orange, and to determine whether these proposed improvements (5’ concrete sidewalks and 5’ asphalt bicycle lanes on the north and south sides of the existing roadway) can be designed and constructed within the existing R/W of Herbert Street. This study also reviews the connectivity of the project with existing and proposed multi-modal links, and the ADA compliance issues that must be incorporated into these project areas. The concept plan and proposed cross sections describe a solution that meets the application’s criteria. Alternative studies for combining of the east to west bicycle and pedestrian access solely along the northern R/W were not included in the scope, as this would require the removal of the majority of the existing tree canopy in the northeastern section of the existing roadway. The concept plan shows that all proposed work can be performed within the existing available R/W. The relocation of existing overhead utilities on the south side of the project is proposed, along with the removal of two existing trees (one that is a 6” to 8” caliper and one greater than 18” caliper). The overhead electrical utility provider will need to be contacted by either the City or their designer to determine the potential costs associated with the relocation of these facilities. The subrogating utilities will be required to relocate their facilities as they are typically permitted on these overhead electrical poles by agreement. There may be some cost to relocate these utilities, which will also need to be considered by the designer. One of these oak trees, proposed for removal, is over 18” in diameter, and it currently occupies a space within the clear recovery area of the east bound travel lane. The City may have the desire to preserve this tree, which would require the designer to consider the tree’s health, the clear recovery safety aspects, and the options of obtaining either additional R/W or a dedicated easement around the tree on the private property side. Note that all work proposed by the City’s application and the funding source require all improvements to be designed and constructed within the current available R/W. The tree preservation option may create a delay to the funding and design of this project. Improvements to portions of the existing bicycle/pedestrian facilities at the western connection location will be required to meet the ADA compliance requirements. This may be as minimal as re-striping and the addition of detectable warning strips within the existing curb ramps. The eastern end connection creates a break in the linkage that must be considered in the final design. The City will need to determine how the bicycle/pedestrian access will be provided east of Jackson Street. It is suggested that the design and construction of the receiving ramps and landings be provided as part of

1

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

this project to allow sidewalk users a safe place to stop and return to the west where this access is provided. The projected cost for this project defines the line items necessary for the design, demolition and construction of the work proposed by the concept plan. The project cost range from the LRE value of $161,270.00 and the Engineers Estimate of Probable Construction Cost value of $189,102.00. This study does not include the cost of easements, additional R/W, or the costs associated with the stormwater permit or other design related permit applications. The cost of the City of Port Orange fiberglass rebar is not covered by the FDOT LRE Cost Reports. However, these costs have been included in the Engineer’s Opinion of Probable Construction Cost. The City (as the Applicant) will need to consider the overall project cost, utility relocation costs and the preservation of the large tree on the south side of the project, before they move forward with the design and implementation phases of this project. Each of these items has a considerable impact on the final project cost.

2

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Introduction The City of Port Orange, Florida (City) (as the applicant) is proposing the design and construction of the Herbert Street Sidewalk Bicycle / Pedestrian Facility. The overall project length is approximately 700 linear feet. Portions of this sidewalk bicycle / pedestrian facility are proposed to be constructed on the north and south sides of the existing Herbert Street roadway, from State Road 5A (South Nova Road), east to Jackson Street. The proposed application design concept consists of a 5’ concrete sidewalk and 5’ asphalt paved shoulder with pavement striping along the north side of the roadway, and 5’ asphalt paved shoulder bicycle lane on a portion of the south side of the roadway. This proposed sidewalk bicycle / pedestrian facility will become a link for the walkway system that connects to Sugar Mill Elementary School, Silver Sands Middle School, and the City Center Recreational Facilities. It may also serve Aunt Melinda’s House preschool/daycare that is located along the northeast corner of Herbert Street and South Nova Road within the project limits. All of the applicant’s proposed design and construction (Project) is planned to occur on City or State owned property and/or within the existing right-of-way (R/W) as shown in the application. Currently, there are existing sections of pedestrian sidewalk located on the north and south sides of Herbert Street, within the project limits. These existing sidewalks are typically 6’-0” in width, and are constructed as 4” thick concrete sidewalks at the NE and SE corners of the South Nova Road intersection at the end of the curb returns. The R/W is constrained on the west end of the project, by the existing roadway configuration. Based on City provided as-builts (Quentin L. Hampton & Associates, dated July 1990) the following existing conditions were observed during field observations. The west end of the project R/W is 50’-0” in width, with two 11’-6” travel lanes, one 10’-0” left turn lane, two 2’-0” curb and gutter sections, two 6’-0” sidewalk sections and two 2’-0” utility corridors. The two traffic lanes, turn lane, curb and gutter sections, and the two sidewalks occupy 46’-0” of the available 50’-0” R/W. The unused R/W sections are split with 2’-0” remaining on the north side and 2’-0” on the south side. Each of these unused R/W sections house utilities and are located behind the existing sidewalks along Herbert Street. The east end of the project has a 60’-0” R/W. The two travel lanes transition from 11’-6” to 10’-0” in width, through the majority of this section, to the intersection of Jackson Street. An open drainage swale exists in the SE quadrant of the project along the south side of the roadway, and there is an open drainage swale along the partially wooded area on the north side of the road. Votran maintains an east bound bus stop along the south side of the roadway. This stop consists of a sign and bench with no other improvements. This bus link stop should be incorporated into the pedestrian access of the final design for this project. Existing overhead utilities, underground telephone, a fire hydrant, and business water meter services are located along the southern R/W of the project. The north side of the R/W contains a 12” ductile iron pipe (DIP) force main, a 6” PVC water main, a fire hydrant, and underground telephone. There is a need for a sidewalk bicycle / pedestrian (multi-modal) pathway to provide a safer access to the schools and along this historic city street, as well as provide connectivity to these facilities and to the local neighborhoods. The City has certified that this proposed joint participation project is consistent with the Volusia Transportation Planning Organization (VTPO) Bicycle and Pedestrian School Safety Review Study, which includes a number of Goals, Objectives, and Policies that support the continued development of alternate transportation systems of pedestrian and bicycle paths for public uses as a means to access Parks, Schools, Neighborhoods and Commercial Facilities. The City has provided certification as the Project Sponsor. The City of Port Orange is coordinating the joint participation for this project with the VTPO. 3

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Project Purpose and Scope The purpose of this report is to review the Project application/proposal and existing conditions within the Project site to evaluate whether the proposed funding is sufficient to complete the Project. • Identify the conceptual Project scope. • Provide a conceptual plan. • Evaluate the constructability of the Project. • Identify any issues that could adversely impact the Project. • Assess whether the Project meets its intended purpose. Representatives from GAI Consultants, Inc. conducted a site visit on December 3, 2010, to review the project site, collect photographic documentation, and to evaluate the existing site conditions.

Project Description For this study the City’s proposed Project has been divided into two separate segments, based on the available R/W and the observed physical constraints. Each segment is shown based on the Concept Plan (Exhibit 3, Page 11). The concept plan is based on the current R/W with the posted roadway speed of 35 MPH. The overall project location and the connectivity facilities are shown on the vicinity map. (Refer to Exhibit 1 – Vicinity Map. Page 9) The land uses on the properties adjacent to the proposed project consist of commercial and residential development as shown on land use map. (Refer to Exhibit 2 – Land Use Map, Page 10) Segment 1 – Design and construct a 5’-0” wide concrete sidewalk and a 5’-0” asphalt paved shoulder bicycle lane along the northern R/W of the existing Herbert Street roadway, from State Road 5A (South Nova Road) east to Jackson Street. Segment 2 - Design and construct a 5’-0” asphalt paved shoulder bicycle lane along the southern R/W of the existing Herbert Street roadway, from State Road 5A (South Nova Road) east to Jackson Street. Although the application does not show a sidewalk as a part of this segment, it should be considered to incorporate the existing Votran stop and to provide a complete multi-modal project.

Project Cost Summary A.

City of Port Orange (City)

The City submitted an XU Application for Bicycle / Pedestrian Project to the VTPO in 2010. This application only addressed the north side R/W improvements, with a total project construction cost of $30,589.00. The XU Application indicates that the City will provide local matching funds, while the VTPO would provide the majority of the funds, in the form of Florida Department of Transportation (FDOT) XU Funds. This proposed project will utilize Federal funds requiring both the VTPO and the City to meet the requirements and standards established by the FHWA.

4

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

B.

Engineer’s Opinion of Probable Construction Cost

The Engineer’s Opinion of Probable Construction Cost is based on a combination of FDOT historical cost and construction cost data generated from the consultant’s experience on previous similar projects. The Engineer’s Opinion of Probable Construction Cost prepared by GAI Consultants, Inc. indicates a budget of $189,102.00. GAI’s Engineer’s Opinion of Probable Construction Cost includes separate lines item for the FDOT Phase 61, design, and CEI costs. Costs for project development, public meetings, and environmental studies have been estimated and are included as separate line items on the Engineer’s Opinion of Probable Construction Cost. A detailed breakdown of GAI’s projected cost is provided in Appendix A. C.

Long Range Estimate System (LRE)

The LRE System is a proprietary program, maintained by the FDOT, which is based on the most current cost data available from statewide construction projects. The LRE data input and reports were prepared by GAI Consultants, Inc. The LRE System provides four standardized reports, which can be viewed in Appendix B. These reports provide several breakouts of the project identifying the associated project costs. LRE-1 and LRE-26 indicate a total construction budget of $161,270.00. This LRE Report is approximately $27,832.00 less than the Engineer’s Opinion of Probable Construction Cost prepared by GAI Consultants, Inc.

Project Concept The Herbert Street Sidewalk Bicycle / Pedestrian Facility proposed by the City/Project Sponsor has two (2) primary segments. These segments are divided into sub-segments based on the differing R/W widths within the Project corridor. The applicant’s first segment is the design and construction of a 5’-0” wide concrete sidewalk and a 5’-0” asphalt paved shoulder bicycle lane along the northern R/W of the existing Herbert Street, from State Road 5A (South Nova Road) east to Jackson Street. The applicant’s second segment is the design and construction of a 5’-0” asphalt paved shoulder bicycle lane along the southern R/W of the existing Herbert Street, from State Road 5A (South Nova Road) east to Jackson Street. Each of these segments has been separated, and described in detail as follows: Segment 1 – Herbert Street North. (Begin Project Sta. 0+00) east to Jackson Street (End Project Sta. 7+00) on the LT (Left) side of the R/W. Segment 1 of the proposed project has been divided in to two (2) separate sub-segments 1A and 1B, based on the varying R/W widths from 50’-0” to 60’-0” within the project corridor. Segment 1A starts at the NE corner of SR 5A – South Nova Road and continues east approximately 240 LF to the end of the 50’-0” R/W section. Segment 1B starts at the end of the 50’ R/W, which is the beginning of the 60’-0” R/W section and continues east approximately 460 LF to the northwest side of the intersection at Jackson Street. Each of these segments has different existing conditions and proposed design solutions as described below. Segment 1A of the proposed sidewalk bicycle/pedestrian facility (approximately 240 linear feet) will be designed within the available northern R/W of Herbert Street. The project starts at the northeast of SR 5A (South Nova Road) and Herbert Street with existing 6’-0” concrete sidewalk abutting type ‘F’ curb and gutter meeting the asphalt roadway. The sidewalk terminates approximately 60’ east of this intersection, where it ties into the parking lot of the commercial

5

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

development. The parking lot pavement terminates approximately 180’ east of the sidewalk terminus. This is also the point where the R/W expands from 50’-0” to the 60’-0” in width, and the beginning of the residential property land use area. Refer to Exhibits 3.1 and 3.2 for typical existing roadway cross-sections for this segment of the project. There is a cross access conflict (one-way exit) at this location for the Aunt Melinda’s House (a privately owned Day Care and Pre-School facility), via the existing alley. Safety at this cross access location may require additional signage, pavement markings and potentially detectable warning strips in the pedestrian pathway. Design and safety principles suggest a separation between public and private spaces, and the vehicular access across the bicycle and pedestrian routes within this project segment. The distinct separation of these spaces can benefit the City from a risk management aspect, as well as promote the corridor’s overall safety. The removal of parking lot pavement and the replacement with a concrete sidewalk, with an ADA compliant surface, is proposed along the sidewalk bicycle/pedestrian access as the best solution for the project. This would provide a 6’0” wide sidewalk facility shared by bicyclists and pedestrians, with separation from the travel lanes. Modifications to the existing curb ramps at the NE and NW corners of SR 5A (South Nova Road) will be required to incorporate the proposed facilities and to bring the existing facilities into current ADA compliance. The existing parking lot should be surveyed to determine if the existing pavement cross-slopes and surfaces comply with the maximum ADA requirement of cross slope of 2% and the maximum grade of 5%. If the existing pavement is ADA compliant, striping of the pedestrian path could be considered as a cost savings to the City along this portion of the project. Refer to Exhibits 3.11 and 3.22 for the proposed cross sections, and Exhibit 3.22A for the pavement striping optional cross section. Additionally, discussions and coordination with the private property are suggested to tie-in the proposed public facilities with the existing commercial development ADA accesses. No improvements or reduction of the existing driveway access is proposed by the concept for this project area. Segment 1B of the proposed sidewalk bicycle/pedestrian facility (approximately 460 linear feet) will be designed within the available northern R/W of Herbert Street. The project starts at the NW corner of the 60’-0” Herbert Street R/W (Station 2+40 LT). This remaining section is partially cleared from the Edge of Pavement (EOP) to the R/W. The 5’-0” sidewalk is proposed to be designed within the available R/W from the northern EOP to the northern R/W line. The sidewalk will meander between the existing trees to save the trees and to utilize the existing tree canopy to improve the walk ability of the corridor. The bicycle portion in this segment will be a designated 5’-0” wide asphalt bicycle lane within the northern edge of the Herbert Street roadway. Refer to Exhibits 3.3 and 3.4 for typical existing roadway cross-sections for this segment of the project. The design of this sub-segment also suggests the addition of one new storm inlet piped to the south side (Segment 2) proposed storm system. Grading between the proposed sidewalk and proposed edge-of-pavement (EOP) should channelize the stormwater flow to this inlet. Sidewalk/Pedestrian Facility - The proposed sidewalk alignment will meander between the existing trees with the back edge of the sidewalk having a minimum 2’-0” offset from the northern R/W line. This offset allows for the placement of utility poles and other equipment within a 2’-0” utility corridor, while providing the minimum 2’-0” clearance from this equipment at the sidewalk edge. Coordination of existing utilities will be a critical requirement of the design phase. This typical cross section provides for a minimum 4’-0” separation between the edge of the travel lane and the front edge of the sidewalk. In order to install the proposed 5’-0” sidewalk, minor clearing & grubbing of trees and tree roots will be required along the proposed 6

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

alignment. Selective clearing/pruning will also be required to provide the minimum 10’-0” vertical clearance along this proposed sidewalk section. Existing grades vary from the northern EOP to the northern R/W, along this proposed sidewalk alignment. The designer will have to consider grading issues of this R/W area to meet the proposed sidewalk, sidewalk shoulder, and bicycle lane/roadway shoulder grades as shown in the proposed typical cross sections for Segment 1B (Exhibits 3.33 and 3.44). The design of the sidewalk and bicycle lane will require, at a minimum, a permit modification from the St. Johns River Water Management District (SJRWMD). Dependent on the overall drainage basin, outfalls, and current treatment facilities the designer may be required to apply for a stormwater permit for this project. Bicycle Facility – The proposed bicycle facility is a dedicated 5’-0” wide bicycle lane which requires the extension of the existing asphalt pavement section of Herbert Street. This extended asphalt section would provide the typical 5’-0” wide bicycle lane striped and marked per FDOT index 17347. In order to accommodate this bicycle lane extension the designer will need to address stabilization, paving and grading. Approximately 5’-6” of new asphalt pavement will be required along the existing roadway from Sta. 2+40 east to Sta. 6+90. Modification to the existing drainage swale will be required to meet the shoulder slope and clear recovery criteria. This may result in minor losses of existing vegetation (outside of the required clearing for the sidewalk alignment) along this segment. Minor adjustments to the fire hydrant and other utility equipment may be required to meet the new grades. Pavement markings on the existing west bound travel lane must be removed and replaced to accommodate the proposed bicycle lane. This will require the removal and re-striping of both the roadway edge and center lines. The travel lanes in this segment will be widened from 10.5’ to 11’. The improvements described by Segment 1A and Segment 1B only meet a portion of the sidewalk bicycle/pedestrian access improvement requested by the City of Port Orange application. These two segments provide the E to W pedestrian access and provide connectivity at the east and west ends of the project. These two proposed segments only provide for westbound bicycle access, leaving eastbound bicycle access and connectivity with the Votran stop out of the design. The conditions of the funding source require that these aspects be included in the design solution. These are addressed by Segment 2 as follows. Segment 2 – Herbert Street South (Begin Project Sta. 0+00 RT) east to Jackson Street (End Project Sta. 7+00) on the RT (Right) side of the R/W. Segment 2 of the proposed project starts at the SE corner of SR 5A (South Nova Road) and Herbert Street and continues east to Jackson Street, (approximately 700 linear feet). This segment will be designed within the available southern R/W of Herbert Street. The R/W line along Herbert Street does not appear to vary in placement or width as it does on the north side. The property land uses on this side of the street are all commercial developments. (Refer to Exhibit 2 – Land Use Map) The current existing roadway (refer to Exhibits 3.5 and 3.6) section starts with a typical curb and gutter section transitioning to a non-curbed roadway section. There is an open drainage swale at the eastern end of the project which will need to be closed and piped to accommodate the proposed improvements. The design of this Segment requires the continuation of the curbed section from the east end to the west end with a 6’-0” wide concrete sidewalk abutting the back edge of the curb, and a dedicated 5’-0” wide asphalt bicycle lane within the roadway. The proposed sidewalk alignment will have a minimum 2’-0” offset from the southern R/W line. This offset allows for the placement of utility poles and other equipment within a 2’-0” utility corridor, while providing the minimum 2’7

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

0” clearance from this equipment at the sidewalk edge. Coordination of existing utilities will be a critical requirement of the design phase. This proposed sidewalk section will need to accommodate the existing Votran stop (at approximately Sta. 1+90 RT). Installation of FDOT Type ‘D’ curb and extended asphalt roadway pavement section will require excavation, stabilization, grading and pavement design. Three (3) of the existing mitered end sections will need to be removed (or converted to manholes) with the addition of three (3) new storm inlets and approximately 640 LF of pipe to close the existing swale section, complete the storm system, allowing for the placement of sidewalk above (on top of) this drainage facility. The use of the FDOT Type ‘D’ curb will allow existing eastbound travel lane to be widened from 10’-6” to 11’-0” for added bicycle safety. The use of this type of curb allows for the placement of the bicycle lane within the constrained R/W. Modifications to the existing five (5) driveways are also required to provide the ADA cross slopes within the corridor. Driveway demolition and reconstruction within the R/W should be designed to match the existing grades on the abutting private properties. The removal of one large (18”) and one small (6”) existing oak trees will be required to accommodate this proposed alignment. Should the City of Port Orange desire to save these trees, they will need to acquire either additional R/W or dedicated easements to relocate the sidewalk outside of the existing R/W at these two tree locations. The design of this segment will require, at a minimum, a permit modification from the St. Johns River Water Management District (SJRWMD). Dependent on the overall drainage basin, outfalls, and current treatment facilities the designer may be required to apply for a stormwater permit for this project. (Refer to Exhibits 3.55 and 3.66) Relocation of some utility poles and private backflow prevention equipment are also required as part of the final design on the south side improvements. Realignment of the Herbert Street centerline will be required in the eastern portion of this segment to provide the minimum 2’-0” utility offset at the R/W line. The travel lanes in this segment will be widened from 10’-6” to 11’-0”. Segments 1 and 2 of the Herbert Street Sidewalk Bicycle/Pedestrian Facility project can be designed and constructed within the existing R/W of Herbert Street. This multi-use access component meets the criteria and needs established by the VTPO Bicycle & Pedestrian School Safety Review Study and the City of Port Orange. These two segments will provide safer routes to schools and linkages to the City’s recreational facilities. These sidewalks and bicycle lanes will also serve as linking segments of the overall multi-modal aspect within the City of Port Orange. The constraints, limitations, exclusions, and design criteria noted in this study bring to light several aspects that must be addressed by the Project Sponsor and the designer. Stormwater permitting, local clearing permits, and underground/overhead utility adjustments are required to be coordinated as part of the project design. All existing fire hydrants, valve boxes, manholes, storm structures and site elements within the corridor will need to be surveyed and adjusted to meet the proposed alignment and grades during the design phase.

8

2ND ST

IL L M AR G SU

Herbert Street Sidewalk Bicycle/Pedestrian Facility Feasibility Study

3RD ST

4TH ST 5TH ST

6TH ST

RD

Vicinity Map

M AM

V SA

LN

JO AN

V) NA

AW TO NL (D U

SR 4

C

YB RO OK

MEMORIAL PARK

KE

ON

RA

CE

LITTL E T OW N R D

CT

TU MBLE W

E ED

JACKSON ST

TR ALDER DR

W T A I L DR LL O N

A EL

T

R

XT

IR

ACORN LN

ST

D)

WA

T C IR KS MO OA KO O K

21

T

TL N

AS

R VA

S

RD

T

( NO

CITY CENTER SPORTS COMPLEX

GL

K

AY AW

ST

TS NN

ST

DO

GH

T ES

5A

MONTESSORI SCHOOL OF PORT ORANGE

FO

EA

EE

CH SO

OT

ME

SC

HU

IG PA

GOLDEN GATE CIR

POWERS AV

CR

AV

DA

BRANDY HILLS DR

N

VD BL

CE

MANHATTAN WAY

LD

KON TIKI TER

BAREFOOT TR

Schools

RU

PEPPERMINT WAY

AV

SP

MS

ST

SR

TUMBLER DR

LN

GIBSON WAY

ES

EL

LN

CA

V AL

I EW

S

ON

PL

SAMMS AV

EL N ES SQUI RR

CITY CENTER DR

Herbert St Project Area

DG

D

ALOHA TER

BREVARD

Parks

T XC

SAND PEBBLE CIR

JU

ED

CAR A M

SEMINOLE

Legend

HERBERT ST

Y

O

PIEDM ONT AV W

AUTUMN TR

D

ORANGE

LE

GREENFIELD DR

LAKE

R

O O D ST

KS

VE

K INS DR

R

BLUE SKY DR

D

WINDY LN

AL

T

R ID

K

OW EN

JA C

CO

R

COMMUNITY LEARNING CENTER, EAST

SKATE PARK

N

D

M SA

K OA

G

B E R C IR

_ ^

EB 9951 301 E Pine St, Suite 500 Orlando, Florida 32801 Phone: (407) 423-8398

T

ST

DR

IR O N

O

EC

NIK

AS

CIS

DO

RD

ET RE T S RT A E RE RB A E H T EC J O PR

WEST GATE DR CI

D

OV

O

SQ

STONE GATE LN

E AT

C M

AM

TR

GR

G

AR

AN

A

OL D HA M MO C K

CHARLES ST

TR

R

N

CL FR

N

U

MARION VOLUSIA

AT

R KT

RI SP

W

D OO

FLAGLER

R CR

T SS

BC

GA UN

MISTY LN

UL

SU

S

P ON TI A C DR

KR

Y

DR

SUGAR MILL GARDENS

SILVER SANDS MIDDLE SCHOOL

LAKESIDE COMMUNITY CENTER

AR

BI R

N NL

OAK FOREST C I R

PORT ORANGE GYMNASIUM

BO

BE

IPM

CT

O

E ON N ST

FE

SA

R

CH

C

R

ED

C

T IS HR

N

LA R

LEMONTWIST LN

TO M P

D

DR

AR

RU S S

O

D

U NB

R YD

O NIX M

E

U

TL ET

IRISH LN

R

E SW

G ET

BA

N ML

US HO

LN NE

IR

P RINGS R D RS DE E

SILVER C R EE

TULA DR

K

ER

G

A

PUTNAM

D

ST

RC

R LD

SU G A R

SU

ME

RIN

SU M

SP

R GD

I N D IAN HILL DR

RAMPART DR

SUGAR MILL ELEMENTARY SCHOOL

HE

S AV

MADELINE AV

LEWARD WAY

DS

R

LR

C WI N

VE

DM

HU

LN ON

JAMES ST

HIL

NT A

PIE

T ON

AL W

IC

CHRIS D R

FAL

DOVE AV

AL

R NT YO N CA TR GS EY KIN INL K MC MT

C O UN T R Y

ER

O DM

ON

V EA

PP

PI E

LT WA

REED CANAL PARK

VD BL

PE

TYLER DR

²

SCALE:

1 inch = 800 feet

DATE:

PROJECT NO.: EXHIBIT:

1

02/03/2011

A091305.02 PAGE:

9

C

YB RO OK ON

RA

CE

CT

E ED

R CI

ALDER DR

JACKSON ST

TR

²

SCALE:

1 inch = 800 feet

DATE:

PROJECT NO.: EXHIBIT:

Land Use Map

2ND ST

ACORN LN

ST

1( DU 42 SR

KE

XT

LITTL E T OW N R D

TU MBLE W

A EL

T

R

FO

IR

Herbert Street Sidewalk Bicycle/Pedestrian Facility Feasibility Study

3RD ST

4TH ST

LN

JO AN AV ) ON AW T NL

PIEDM ONT AV W

5TH ST

6TH ST

RD

IL L M GA R SU LD

KON TIKI TER

BAREFOOT TR

O

T

GATEWOOD DR

Volusia County Urban Medium Intensity

AS

D)

CITY CENTER DR

RD

Warehouse/Industrial

T

R VA

W T A I L DR LL O N

Commercial

NN

( NO

WA

GL

K

TS

ST

T C IR KS MO OA KO O K

AY AW

ME

OT

5A

O

S

EA

Office/Residential Transition

DO

ST

SR

TL N

Urban High Density Residential 8-16 Units/Acre

EE

DA

SC

GH

T ES

PL

SAMMS AV

HU

IG PA

VE

GOLDEN GATE CIR

V SA

CR

MM

V SA

ST

BRANDY HILLS DR

S

M AM

Public/Quasi-Public

Urban Low Density Residential 4-8 Units/Acre

CE

MANHATTAN WAY

POWERS AV

CH SO

ON

CO

R

NE S

N

VD BL

FLU Suburban Residential 2-4 Units/Acre

RU

PEPPERMINT WAY

AV

SP

KS

SA

K OA

TUMBLER DR

LN

EL

LN

R ID

NO

JA C

GIBSON WAY

ES

D

NIK

KE

CA

O O D ST W

V AL

I EW

BREVARD

Herbert St Project Area

DG

CAR A M

SEMINOLE

Legend

HERBERT ST

JU

ED

ALOHA TER

ORANGE

Y

T XC

SAND PEBBLE CIR

D

AUTUMN TR

R

B E R C IR

R

SQ

ET RE T S RT A E RE RB A E H T EC J O PR

_ ^

EB 9951 301 E Pine St, Suite 500 Orlando, Florida 32801 Phone: (407) 423-8398

LAKE

LE

GREENFIELD DR

D

D

R

G

ST

K INS DR

AL

O

T

BLUE SKY DR

N

WINDY LN

VOLUSIA

T

CIS

RD

L SQU IR RE

C ENTE R

R CR

O

EC

KT

N

W

D OO

AS

AN

DR

G

D

AM

TR

TR

OV

UN

RI SP AR

U

WEST GATE DR

IR O N

C M

S

BI R

GR

IPM

CT

STONE GATE LN

CI

CHARLES ST

AT

R

CH

C CL

KR

FR

DO

OL D HA M MO C K

E AT

Y

DR

O

E ON N ST

FE

T SS

AR

BC

GA

AR

MISTY LN

UL

SU

BO

DR

BE

N NL

A K FOREST CI R

Y IT

R

P ON TI A C DR

N

A

LEMONTWIST LN

R

ED

C

T IS HR

N

LA R

TULA DR

C

SA

D

ER

G

RU S S

O

D

U NB

R YD

O NIX M

E

U

TL ET

IRISH LN

R

E SW

G ET

BA

N ML

US HO

LN NE

IR

P RINGS R D RS DE E

SILVER C R EE

TO M P

LR

ST

RC

R LD

A

FLAGLER

MARION

SU G A R

SU

ME

RIN

SU M

SP

R GD

I N D IAN HILL DR

RAMPART DR

JAMES ST

HE

S AV

MADELINE AV

LEWARD WAY

DS

PUTNAM

HIL

C WI N

VE

DM

HU

LN ON

R

D

ER

NT A

PIE

T ON

C O UN T R Y

K

IC

CHRIS D R

FAL

DOVE AV

AL

R NT YO N CA TR GS EY KIN INL K MC MT

V EA

AL W

LVD

PP

B ON

PE

O DM

LT WA

N YL

PI E

D GI N

TYLER DR

2

02/03/2011

A091305.02 PAGE:

10

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical existing conditions cross-section depicted by this exhibit, was created from the data collected during the site observation, performed by GAI Consultants, Inc. These are not to scale and used for graphic presentation only. This is not to be construed as surveyed or as-built data.

3.1

Existing Conditions Typical Cross-Section – Segment 1A

12

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical existing conditions cross-section depicted by this exhibit, was created from the data collected during the site observation, performed by GAI Consultants, Inc. These are not to scale and used for graphic presentation only. This is not to be construed as surveyed or as-built data.

3.2

Existing Conditions Typical Cross-Section – Segment 1A

13

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical existing conditions cross-section depicted by this exhibit, was created from the data collected during the site observation, performed by GAI Consultants, Inc. These are not to scale and used for graphic presentation only. This is not to be construed as surveyed or as-built data.

3.3

Existing Conditions Typical Cross-Section – Segment 1B

14

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical existing conditions cross-section depicted by this exhibit, was created from the data collected during the site observation, performed by GAI Consultants, Inc. These are not to scale and used for graphic presentation only. This is not to be construed as surveyed or as-built data.

3.4

Existing Conditions Typical Cross-Section – Segment 1B

15

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical existing conditions cross-section depicted by this exhibit, was created from the data collected during the site observation, performed by GAI Consultants, Inc. These are not to scale and used for graphic presentation only. This is not to be construed as surveyed or as-built data.

3.5

Existing Conditions Typical Cross-Section – Segment 2

16

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical existing conditions cross-section depicted by this exhibit, was created from the data collected during the site observation, performed by GAI Consultants, Inc. These are not to scale and used for graphic presentation only. This is not to be construed as surveyed or as-built data.

3.6

Existing Conditions Typical Cross-Section – Segment 2

17

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical proposed cross-section depicted by this exhibit, was created by GAI Consultants, Inc. This was created to establish minimum criteria for project cost purposes and is not to be construed as design data. The location of utilities was based on the visible presence of valve boxes, vault lids, pull boxes, and manholes at the surface within and adjacent to the proposed pathway alignment. These are not to scale and used for graphic presentation only. The width of the available R/W has not been verified at all locations.

3.11

Proposed Typical Cross-Section – Segment 1A

18

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical proposed cross-section depicted by this exhibit, was created by GAI Consultants, Inc. This was created to establish minimum criteria for project cost purposes and is not to be construed as design data. The location of utilities was based on the visible presence of valve boxes, vault lids, pull boxes, and manholes at the surface within and adjacent to the proposed pathway alignment. These are not to scale and used for graphic presentation only. The width of the available R/W has not been verified at all locations.

3.22

Proposed Typical Cross-Section – Segment 1A

19

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical proposed cross-section depicted by this exhibit, was created by GAI Consultants, Inc. This was created to establish minimum criteria for project cost purposes and is not to be construed as design data. The location of utilities was based on the visible presence of valve boxes, vault lids, pull boxes, and manholes at the surface within and adjacent to the proposed pathway alignment. These are not to scale and used for graphic presentation only. The width of the available R/W has not been verified at all locations.

3.22A

Alternate Proposed Typical Pathway Section – Segment 1A

This alternate can only be considered if the existing parking lot pavement has been surveyed and confirmed to meet the ADA sidewalk criteria. Cross slope, vertical grade changes, and surfaces must all be verified.

20

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical proposed cross-section depicted by this exhibit, was created by GAI Consultants, Inc. This was created to establish minimum criteria for project cost purposes and is not to be construed as design data. The location of utilities was based on the visible presence of valve boxes, vault lids, pull boxes, and manholes at the surface within and adjacent to the proposed pathway alignment. These are not to scale and used for graphic presentation only. The width of the available R/W has not been verified at all locations.

3.33

Proposed Typical Cross-Section – Segment 1B

21

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical proposed cross-section depicted by this exhibit, was created by GAI Consultants, Inc. This was created to establish minimum criteria for project cost purposes and is not to be construed as design data. The location of utilities was based on the visible presence of valve boxes, vault lids, pull boxes, and manholes at the surface within and adjacent to the proposed pathway alignment. These are not to scale and used for graphic presentation only. The width of the available R/W has not been verified at all locations.

3.44

Proposed Typical Cross-Section – Segment 1B

22

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical proposed cross-section depicted by this exhibit, was created by GAI Consultants, Inc. This was created to establish minimum criteria for project cost purposes and is not to be construed as design data. The location of utilities was based on the visible presence of valve boxes, vault lids, pull boxes, and manholes at the surface within and adjacent to the proposed pathway alignment. These are not to scale and used for graphic presentation only. The width of the available R/W has not been verified at all locations.

3.55

Proposed Typical Cross-Section – Segment 2

23

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 3

Typical Sections Typical proposed cross-section depicted by this exhibit, was created by GAI Consultants, Inc. This was created to establish minimum criteria for project cost purposes and is not to be construed as design data. The location of utilities was based on the visible presence of valve boxes, vault lids, pull boxes, and manholes at the surface within and adjacent to the proposed pathway alignment. These are not to scale and used for graphic presentation only. The width of the available R/W has not been verified at all locations.

3.66

Proposed Typical Cross-Section – Segment 2

24

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 4

Utility Data The known utilities within this corridor have been identified by the following design ticket. This information will need to be verified and updated by the designer during the design phase. The City/Project Sponsor should be made aware of the utility impacts, by their designer, as they relate to additional project costs that may not be covered by the federal funds or VTPO funds programmed for this project.

25

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

26

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

27

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Exhibit 5

Photographic Documentation of Existing Conditions

The photographs in this exhibit were obtained on December 03, 2010, as part of the site observation and data collection task performed by GAI Consultants, Inc. Note: Some photos refer to station numbers (Example: Sta. 1 + 50 RT) (RT = Right & LT = Left). These are based on field measurements using the edge-of-pavement and other site elements. These also reference specific streets within the project limits, by location and/or segment. Segment 1 – North side of Herbert Street, from SR 5A - Nova Road eastbound to Jackson Street, Sta. 0+00 to Sta. 7+00 LT. Photo #001:

SR 5A – Nova Road & Herbert Street Sta. 0 + 0.00 LT – Looking N. Note: Existing ramps not ADA compliant. Crosswalk striping may need to be modified, and the addition of detectable warning strips are required.

Photo #002:

SR 5A – Nova Road & Herbert Street Sta. 0 + 60.00 LT– Looking NE. Note: Separation and definition of the public and private space suggested, per CPTED principles. Sidewalk along this section is required to be traffic bearing to meet parking lot vehicular conditions. *Survey required along section to determine ADA grade compliance for the pavement striping cost savings alternative.

28

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Photo #003:

Herbert Street Mid-Block Sta. 2 + 40.00 LT– Looking NE. Note: Transition to 5’ sidewalk and the widening of the R/W are design considerations at this location. Verification of fence on private property required. Potential Conflict Location: Private daycare/school use alleyway as egress, which may impact safety at this location. Special pavement marking and/or signage may be required at this location. Photo #004:

Herbert Street Mid-Block Sta. 4 + 40.00 LT– Looking NE. Note: Clearing and grubbing, grading and fire hydrant modification will be required to accommodate the proposed sidewalk and grade changes in this section.

Photo #005:

Herbert Street Sta. 5 + 0.00 LT– Looking W. Note: Selective clearing required to accommodate meandering sidewalk design. Tree removal will need to be permitted by City.

29

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Photo #006:

Herbert Street at Jackson Street Sta. 6 + 60.00 LT– Looking NE. Note: Crosswalk striping and ramps on the east side of Jackson Street required. Relocation of stop sign and stop bar may be required. Connectivity with future eastbound pedestrian / bicycle access is a design consideration at this location.

30

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Segment 2 – South side of Herbert Street, from SR 5A - Nova Road eastbound to Jackson Street, Sta. 0+00 to Sta. 7+00 RT. Photo #007:

Herbert Street at SR 5A Nova Road Sta. 0 + 0.00 RT – Looking W. Note: Existing ramps and crosswalk striping to be modified to meet current ADA criteria.

Photo #007A:

Herbert Street at SR 5A Nova Road Sta. 0 + 20.00 RT – Looking W. Note: Cross slope of existing curb inlet top will require verification of ADA compliance. Signage identifying the joint use of the existing sidewalk by both pedestrians and bicyclists is required. Additional pavement markings may be considered to further clarify the shared use along this existing sidewalk segment.

31

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Photo #008:

Herbert Street Sta. 0 + 90.00 RT – Looking E. Note: Transition from sidewalk to driveway required. Driveway will need to be modified to provide ADA cross slope conditions. Bicycle use will transition from the sidewalk to the striped extended asphalt pavement section at this location.

Photo #009:

Herbert Street Mid-Block Votran Stop Sta. 1 + 80.00 RT – Looking E. Note: Bus stop coordination required as part of the multi-modal aspect of the project. The bench and bus stop route sign locations will need to be incorporated into the sidewalk, while providing the minimum 36” ADA clear access.

Photo #010:

Herbert Street Mid-Block Sta. 2 + 60.00 RT – Looking E. Note: Large Oak tree will need to be removed to accommodate sidewalk and curb section. The private water service equipment may need to be relocated to accommodate curb and sidewalk. Option: City may decide to obtain either an easement or additional R/W to save this tree.

32

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Photo #011:

Herbert Street Sta. 3 + 20.00 RT – Looking E. Note: Mailbox and private water service equipment will need to be relocated to accommodate sidewalk, curb section and asphalt bicycle lane.

Photo #012:

Herbert Street East Sta. 5 + 15.00 RT – Looking E. Note: Utility pole, signage and private water service equipment will need to be relocated to accommodate sidewalk, curb section, and bicycle lane. Drainage will need to be addressed by curb grade line. The piping of the storm system is also required from this point east to accommodate the proposed improvements. Photo #013:

Herbert Street East Sta. 6 + 15.00 RT – Looking E. Note: Piping drainage swale and the extension of the asphalt roadway required to accommodate the placement of sidewalk, curb section, and bicycle lane at this location.

33

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Photo #014:

Herbert Street at Jackson Street Sta. 6 + 80.00 RT – Looking SE. Note: Crosswalk striping and ramp ADA modification to current criteria required on east side of Jackson Street. Relocation of stop signs and stop bars may be required. Removal of mitered end section at drive will be part of piped drainage improvements.

34

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Appendices Appendix A Engineer’s Opinion of Probable Construction Cost

35

VTPO Feasibility Study GAI #A091305.02

Herbert Street Sidewalk Bicycle / Pedestrian Facility Engineer's Estimate of Probable Construction Costs

3/21/2011

REVISED DRAFT SUMMARY SEGMENT: LENGTH:

FDOT PAY ITEM # 101-1 102-1 102-61 104-10-3 104-18 110-1-1 110-4 120-1 285-706 334-1-14 339-1 350-1-3 425-1361 425-4 425-2-61 430-174-101 425-1545 520-2-4 520-3 522-1 522-2 527-1 570-1-2 700-20-11 700-20-40 711-11111 711-11123 711-11125 711-11160 711-11170 715-4400 721-74-1 1644800 711-17

SEGMENTS 1 AND 2 - HERBERT STREET 700.00 LF (0.132 MILES) Both N & S Sides

DESCRIPTION MOBILIZATION (8%) MOT (6%) BUSINESS SIGN SEDIMENT BARRIER INLET PROTECTION SYSTEM CLEARING & GRUBBING REMOVAL OF CONCRETE PAVEMENT REGULAR EXCAVATION OPTIONAL BASE, GROUP 06 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC "D" MISC. ASPHALT PLAIN CEMENT CONCRETE PAVEMENT 8" INLET CURB, P-6 INLETS ADJUST MANHOLE CULVERT PILE, OPTIONAL MATERIAL 0" - 24" DITCH BOTTOM INLET TYPE 'D' CONCRETE CURB TYPE 'D' VALLEY GUTTER, CONCRETE SIDEWALK CONCRETE, 4" THICK SIDEWALK CONCRETE, 6" THICK ADA DETECTABLE WARNING STRIPS ON EXISTING WALKS PERFORMANCE TURF - SOD SINGLE POST SIGN, F&I , <12 SF SINGLE POST SIGN, RELOCATE THERMOPLASTIC, STANDARD, WHITE, SOLID, 6" THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" THERMOPLASTIC, STANDARD, WHITE, SOLID, BICYCLE SYMBOL THERMOPLASTIC, STANDARD, WHITE, SOLID, ARROW LIGHT POLE COMPLETE, RELOCATE TRASH RECEPTACLE FIRE HYDRANT, RELOCATE THERMOPLASTIC REMOVE

FDOT AREA 6 AVERAGE COSTS

UNIT TYPE LS LS EA LF EA AC SY CY SY TN TN SY EA EA EA LF EA LF LF SY SY EA SY AS AS NM LF LF EA EA EA EA EA SF

SEGMENT 1 TOTALS 1.00 1.00 2.00 700.00 1.00 0.07 271.10 138.89 238.80 21.50 1.00 0.00 0.00 0.00 0.00 45.00 1.00 40.00 0.00 230.56 150.00 4.00 197.78 4.00 2.00 0.26 560.00 1,200.00 2.00 2.00 0.00 0.00 1.00 50.00

SEGMENT 2 TOTALS 1.00 1.00 2.00 700.00 1.00 0.02 190.00 207.41 333.00 31.18 1.00 0.00 2.00 1.00 3.00 645.00 1.00 310.00 280.00 305.00 0.00 4.00 66.66 2.00 2.00 0.26 80.00 160.00 2.00 2.00 2.00 1.00 1.00 0.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2011 UNIT EXTENSION COST 10,700.00 $ 10,700.00 4,100.00 $ 4,100.00 71.67 $ 286.68 1.27 $ 1,778.00 59.14 $ 118.28 5,243.25 $ 482.38 13.95 $ 6,432.35 14.80 $ 5,125.24 32.10 $ 18,354.78 75.84 $ 3,995.25 132.27 $ 264.54 110.00 $ 3,620.00 $ 7,240.00 390.80 $ 390.80 2,173.03 $ 6,519.09 33.59 $ 23,177.10 3,233.00 $ 6,466.00 11.50 $ 4,025.00 26.81 $ 7,506.80 28.35 $ 15,183.13 36.85 $ 5,527.50 413.65 $ 3,309.20 2.04 $ 539.46 247.36 $ 1,484.16 50.65 $ 202.60 2,994.78 $ 1,557.29 2.01 $ 1,286.40 4.06 $ 5,521.60 107.26 $ 429.04 44.03 $ 176.12 880.10 $ 1,760.20 947.00 $ 947.00 2,250.00 $ 4,500.00 2.32 $ 116.00

SUBTOTAL FDOT PHASE 61 DESIGN COST CEI COST TOTAL PROJECT COST

P:\ORL\2009\A091305.02 Herbert Street\Revised DRAFT 2-2-11\GAI-OOPCC_Draft_021711

$ $ $ $ $

149,502.00 8,900.00 18,700.00 12,000.00 189,102.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2012 UNIT EXTENSION COST 11,000.00 $ 11,000.00 4,200.00 $ 4,200.00 73.82 $ 295.28 1.31 $ 1,831.34 60.91 $ 121.83 5,400.55 $ 496.85 14.37 $ 6,625.32 15.24 $ 5,279.00 33.06 $ 18,905.42 78.12 $ 4,115.11 136.24 $ 272.48 113.30 $ 3,728.60 $ 7,457.20 402.52 $ 402.52 2,238.22 $ 6,714.66 34.60 $ 23,872.41 3,329.99 $ 6,659.98 11.85 $ 4,145.75 27.61 $ 7,732.00 29.20 $ 15,638.62 37.96 $ 5,693.33 426.06 $ 3,408.48 2.10 $ 555.64 254.78 $ 1,528.68 52.17 $ 208.68 3,084.62 $ 1,604.00 2.07 $ 1,324.99 4.18 $ 5,687.25 110.48 $ 441.91 45.35 $ 181.40 906.50 $ 1,813.01 975.41 $ 975.41 2,317.50 $ 4,635.00 2.39 $ 119.48 $ $ $ $ $

153,943.00 9,200.00 19,200.00 12,300.00 194,643.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2013 UNIT EXTENSION COST 11,300.00 $ 11,300.00 4,300.00 $ 4,300.00 76.03 $ 304.14 1.35 $ 1,886.28 62.74 $ 125.48 5,562.56 $ 511.76 14.80 $ 6,824.07 15.70 $ 5,437.37 34.05 $ 19,472.59 80.46 $ 4,238.56 140.33 $ 280.65 116.70 $ 3,840.46 $ 7,680.92 414.60 $ 414.60 2,305.37 $ 6,916.10 35.64 $ 24,588.59 3,429.89 $ 6,859.78 12.20 $ 4,270.12 28.44 $ 7,963.96 30.08 $ 16,107.78 39.09 $ 5,864.12 438.84 $ 3,510.73 2.16 $ 572.31 262.42 $ 1,574.55 53.73 $ 214.94 3,177.16 $ 1,652.12 2.13 $ 1,364.74 4.31 $ 5,857.87 113.79 $ 455.17 46.71 $ 186.85 933.70 $ 1,867.40 1,004.67 $ 1,004.67 2,387.03 $ 4,774.05 2.46 $ 123.06 $ $ $ $ $

158,505.00 9,500.00 19,800.00 12,700.00 200,505.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2014 UNIT EXTENSION COST 11,600.00 $ 11,600.00 4,400.00 $ 4,400.00 78.32 $ 313.26 1.39 $ 1,942.87 64.62 $ 129.25 5,729.44 $ 527.11 15.24 $ 7,028.80 16.17 $ 5,600.49 35.08 $ 20,056.76 82.87 $ 4,365.72 144.54 $ 289.07 120.20 $ 3,955.67 $ 7,911.34 427.04 $ 427.04 2,374.53 $ 7,123.59 36.70 $ 25,326.24 3,532.79 $ 7,065.57 12.57 $ 4,398.23 29.30 $ 8,202.88 30.98 $ 16,591.01 40.27 $ 6,040.05 452.01 $ 3,616.05 2.23 $ 589.48 270.30 $ 1,621.78 55.35 $ 221.39 3,272.48 $ 1,701.69 2.20 $ 1,405.68 4.44 $ 6,033.60 117.21 $ 468.82 48.11 $ 192.45 961.71 $ 1,923.42 1,034.81 $ 1,034.81 2,458.64 $ 4,917.27 2.54 $ 126.76 $ $ $ $ $

163,192.00 9,800.00 20,400.00 13,100.00 206,492.00

Page 1 of 3

VTPO Feasibility Study GAI #A091305.02

SEGMENT: LENGTH:

FDOT PAY ITEM # 101-1 102-1 102-61 104-10-3 104-18 110-1-1 110-4 120-1 285-706 334-1-14 339-1 350-1-3 425-1361 425-4 425-2-61 430-174-101 425-1545 520-2-4 520-3 522-1 522-2 527-1 570-1-2 700-20-11 700-20-40 711-11111 711-11123 711-11125 711-11160 711-11170 715-4400 721-74-1 1644800 711-17

Herbert Street Sidewalk Bicycle / Pedestrian Facility Engineer's Estimate of Probable Construction Costs FINAL SEGMENT 1 SEGMENT 1 - NORTH HERBERT STREET R/W 700 LF (0.132 MILES)

DESCRIPTION MOBILIZATION (8%) MOT (6%) BUSINESS SIGN SEDIMENT BARRIER INLET PROTECTION SYSTEM CLEARING & GRUBBING REMOVAL OF CONCRETE PAVEMENT REGULAR EXCAVATION OPTIONAL BASE, GROUP 06 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC "D" MISC. ASPHALT PLAIN CEMENT CONCRETE PAVEMENT 8" INLET CURB, P-6 INLETS ADJUST MANHOLE CULVERT PILE, OPTIONAL MATERIAL 0" - 24" DITCH BOTTOM INLET TYPE 'D' CONCRETE CURB TYPE 'D' VALLEY GUTTER, CONCRETE SIDEWALK CONCRETE, 4" THICK SIDEWALK CONCRETE, 6" THICK ADA DETECTABLE WARNING STRIPS ON EXISTING WALKS PERFORMANCE TURF - SOD SINGLE POST SIGN, F&I , <12 SF SINGLE POST SIGN, RELOCATE THERMOPLASTIC, STANDARD, WHITE, SOLID, 6" THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" THERMOPLASTIC, STANDARD, WHITE, SOLID, BICYCLE SYMBOL THERMOPLASTIC, STANDARD, WHITE, SOLID, ARROW LIGHT POLE COMPLETE, RELOCATE TRASH RECEPTACLE FIRE HYDRANT, RELOCATE THERMOPLASTIC REMOVE

FDOT AREA 6 AVERAGE COSTS

UNIT TYPE LS LS EA LF EA AC SY CY SY TN TN SY EA EA EA LF EA LF LF SY SY EA SY AS AS NM LF LF EA EA EA EA EA SF

QUANTITY 1.00 1.00 2.00 700.00 1.00 0.07 271.10 138.89 238.80 21.50 1.00 0.00 0.00 0.00 0.00 45.00 1.00 40.00 0.00 230.56 150.00 4.00 197.78 4.00 2.00 0.26 560.00 1,200.00 2.00 2.00 0.00 0.00 1.00 50.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2011 UNIT EXTENSION COST 3,700.00 $ 3,700.00 2,800.00 $ 2,800.00 71.67 $ 143.34 1.27 $ 889.00 59.14 $ 59.14 5,243.25 $ 377.51 13.95 $ 3,781.85 14.80 $ 2,055.57 32.10 $ 7,665.48 75.84 $ 1,630.56 132.27 $ 132.27 110.00 $ 3,620.00 $ 390.80 $ 2,173.03 $ 33.59 $ 1,511.55 3,233.00 $ 3,233.00 11.50 $ 460.00 26.81 $ 28.35 $ 6,536.38 36.85 $ 5,527.50 413.65 $ 1,654.60 2.04 $ 403.47 247.36 $ 989.44 50.65 $ 101.30 2,994.78 $ 778.64 2.01 $ 1,125.60 4.06 $ 4,872.00 107.26 $ 214.52 44.03 $ 88.06 880.10 $ 947.00 $ 2,250.00 $ 2,250.00 2.32 $ 116.00

SUBTOTAL FDOT PHASE 61 DESIGN COST CEI COST TOTAL PROJECT COST

P:\ORL\2009\A091305.02 Herbert Street\Revised DRAFT 2-2-11\GAI-OOPCC_Draft_021711

3/21/2011

$ $ $ $ $

53,097.00 3,200.00 6,600.00 4,200.00 67,097.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2012 UNIT EXTENSION COST 3,800.00 $ 3,800.00 2,900.00 $ 2,900.00 73.82 $ 147.64 1.31 $ 915.67 60.91 $ 60.91 5,400.55 $ 388.84 14.37 $ 3,895.30 15.24 $ 2,117.24 33.06 $ 7,895.44 78.12 $ 1,679.48 136.24 $ 136.24 113.30 $ 3,728.60 $ 402.52 $ 2,238.22 $ 34.60 $ 1,556.90 3,329.99 $ 3,329.99 11.85 $ 473.80 27.61 $ 29.20 $ 6,732.47 37.96 $ 5,693.33 426.06 $ 1,704.24 2.10 $ 415.58 254.78 $ 1,019.12 52.17 $ 104.34 3,084.62 $ 802.00 2.07 $ 1,159.37 4.18 $ 5,018.16 110.48 $ 220.96 45.35 $ 90.70 906.50 $ 975.41 $ 2,317.50 $ 2,317.50 2.39 $ 119.48 $ $ $ $ $

54,695.00 3,300.00 6,800.00 4,400.00 69,195.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2013 UNIT EXTENSION COST 3,900.00 $ 3,900.00 3,000.00 $ 3,000.00 76.03 $ 152.07 1.35 $ 943.14 62.74 $ 62.74 5,562.56 $ 400.50 14.80 $ 4,012.16 15.70 $ 2,180.76 34.05 $ 8,132.31 80.46 $ 1,729.86 140.33 $ 140.33 116.70 $ 3,840.46 $ 414.60 $ 2,305.37 $ 35.64 $ 1,603.60 3,429.89 $ 3,429.89 12.20 $ 488.01 28.44 $ 30.08 $ 6,934.44 39.09 $ 5,864.12 438.84 $ 1,755.37 2.16 $ 428.04 262.42 $ 1,049.70 53.73 $ 107.47 3,177.16 $ 826.06 2.13 $ 1,194.15 4.31 $ 5,168.70 113.79 $ 227.58 46.71 $ 93.42 933.70 $ 1,004.67 $ 2,387.03 $ 2,387.03 2.46 $ 123.06 $ $ $ $ $

56,335.00 3,400.00 7,000.00 4,500.00 71,235.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2014 UNIT EXTENSION COST 4,000.00 $ 4,000.00 3,100.00 $ 3,100.00 78.32 $ 156.63 1.39 $ 971.43 64.62 $ 64.62 5,729.44 $ 412.52 15.24 $ 4,132.52 16.17 $ 2,246.18 35.08 $ 8,376.28 82.87 $ 1,781.76 144.54 $ 144.54 120.20 $ 3,955.67 $ 427.04 $ 2,374.53 $ 36.70 $ 1,651.71 3,532.79 $ 3,532.79 12.57 $ 502.65 29.30 $ 30.98 $ 7,142.47 40.27 $ 6,040.05 452.01 $ 1,808.03 2.23 $ 440.88 270.30 $ 1,081.19 55.35 $ 110.69 3,272.48 $ 850.84 2.20 $ 1,229.97 4.44 $ 5,323.77 117.21 $ 234.41 48.11 $ 96.23 961.71 $ 1,034.81 $ 2,458.64 $ 2,458.64 2.54 $ 126.76 $ $ $ $ $

58,018.00 3,500.00 7,300.00 4,600.00 73,418.00

Page 2 of 3

VTPO Feasibility Study GAI #A091305.02

SEGMENT: LENGTH:

FDOT PAY ITEM # 101-1 102-1 102-61 104-10-3 104-18 110-1-1 110-4 120-1 285-706 334-1-14 339-1 350-1-3 425-1361 425-4 425-2-61 430-174-101 425-1545 520-2-4 520-3 522-1 522-2 527-1 570-1-2 700-20-11 700-20-40 711-11111 711-11123 711-11125 711-11160 711-11170 715-4400 721-74-1 1644800 711-17

Herbert Street Sidewalk Bicycle / Pedsstrian Facility Engineer's Estimate of Probable Construction Costs FINAL SEGMENT 2 SEGMENT 2 - SOUTH HERBERT STREET R/W 700 LF (0.132 MILES)

DESCRIPTION MOBILIZATION (8%) MOT (6%) BUSINESS SIGN SEDIMENT BARRIER INLET PROTECTION SYSTEM CLEARING & GRUBBING REMOVAL OF CONCRETE PAVEMENT REGULAR EXCAVATION OPTIONAL BASE, GROUP 06 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC "D" MISC. ASPHALT PLAIN CEMENT CONCRETE PAVEMENT 8" INLET CURB, P-6 INLETS ADJUST MANHOLE CULVERT PILE, OPTIONAL MATERIAL 0" - 24" DITCH BOTTOM INLET TYPE 'D' CONCRETE CURB TYPE 'D' VALLEY GUTTER, CONCRETE SIDEWALK CONCRETE, 4" THICK SIDEWALK CONCRETE, 6" THICK ADA DETECTABLE WARNING STRIPS ON EXISTING WALKS PERFORMANCE TURF - SOD SINGLE POST SIGN, F&I , <12 SF SINGLE POST SIGN, RELOCATE THERMOPLASTIC, STANDARD, WHITE, SOLID, 6" THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" THERMOPLASTIC, STANDARD, WHITE, SOLID, BICYCLE SYMBOL THERMOPLASTIC, STANDARD, WHITE, SOLID, ARROW LIGHT POLE COMPLETE, RELOCATE TRASH RECEPTACLE FIRE HYDRANT, RELOCATE THERMOPLASTIC REMOVE

FDOT AREA 6 AVERAGE COSTS

UNIT TYPE LS LS EA LF EA AC SY CY SY TN TN SY EA EA EA LF EA LF LF SY SY EA SY AS AS NM LF LF EA EA EA EA EA SF

QUANTITY 1.00 1.00 2.00 700.00 1.00 0.02 190.00 207.41 333.00 31.18 1.00 0.00 2.00 1.00 3.00 645.00 1.00 310.00 280.00 305.00 0.00 4.00 66.66 2.00 2.00 0.26 80.00 160.00 2.00 2.00 2.00 1.00 1.00 0.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2011 UNIT EXTENSION COST 7,000.00 $ 7,000.00 1,300.00 $ 1,300.00 71.67 $ 143.34 1.27 $ 889.00 59.14 $ 59.14 5,243.25 $ 104.87 13.95 $ 2,650.50 14.80 $ 3,069.67 32.10 $ 10,689.30 75.84 $ 2,364.69 132.27 $ 132.27 110.00 $ 3,620.00 $ 7,240.00 390.80 $ 390.80 2,173.03 $ 6,519.09 33.59 $ 21,665.55 3,233.00 $ 3,233.00 11.50 $ 3,565.00 26.81 $ 7,506.80 28.35 $ 8,646.75 36.85 $ 413.65 $ 1,654.60 2.04 $ 135.99 247.36 $ 494.72 50.65 $ 101.30 2,994.78 $ 778.64 2.01 $ 160.80 4.06 $ 649.60 107.26 $ 214.52 44.03 $ 88.06 880.10 $ 1,760.20 947.00 $ 947.00 2,250.00 $ 2,250.00 2.32 $ -

SUBTOTAL FDOT PHASE 61 DESIGN COST CEI COST TOTAL PROJECT COST

P:\ORL\2009\A091305.02 Herbert Street\Revised DRAFT 2-2-11\GAI-OOPCC_Draft_021711

3/21/2011

$ $ $ $ $

96,405.00 5,800.00 12,100.00 7,700.00 122,005.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2012 UNIT EXTENSION COST 7,200.00 $ 7,200.00 1,300.00 $ 1,300.00 $ 1.31 $ 915.67 60.91 $ 60.91 5,400.55 $ 108.01 14.37 $ 2,730.02 15.24 $ 3,161.76 33.06 $ 11,009.98 78.12 $ 2,435.63 136.24 $ 136.24 113.30 $ 3,728.60 $ 7,457.20 402.52 $ 402.52 2,238.22 $ 6,714.66 34.60 $ 22,315.52 3,329.99 $ 3,329.99 11.85 $ 3,671.95 27.61 $ 7,732.00 29.20 $ 8,906.15 37.96 $ 426.06 $ 1,704.24 2.10 $ 140.07 254.78 $ 509.56 52.17 $ 104.34 3,084.62 $ 802.00 2.07 $ 165.62 4.18 $ 669.09 110.48 $ 220.96 45.35 $ 90.70 906.50 $ 1,813.01 975.41 $ 975.41 2,317.50 $ 2,317.50 2.39 $ $ $ $ $ $

99,101.00 5,900.00 12,400.00 7,900.00 125,301.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2013 UNIT EXTENSION COST 7,400.00 $ 7,400.00 1,300.00 $ 1,300.00 $ 1.35 $ 943.14 62.74 $ 62.74 5,562.56 $ 111.25 14.80 $ 2,811.92 15.70 $ 3,256.61 34.05 $ 11,340.28 80.46 $ 2,508.70 140.33 $ 140.33 116.70 $ 3,840.46 $ 7,680.92 414.60 $ 414.60 2,305.37 $ 6,916.10 35.64 $ 22,984.98 3,429.89 $ 3,429.89 12.20 $ 3,782.11 28.44 $ 7,963.96 30.08 $ 9,173.34 39.09 $ 438.84 $ 1,755.37 2.16 $ 144.27 262.42 $ 524.85 53.73 $ 107.47 3,177.16 $ 826.06 2.13 $ 170.59 4.31 $ 689.16 113.79 $ 227.58 46.71 $ 93.42 933.70 $ 1,867.40 1,004.67 $ 1,004.67 2,387.03 $ 2,387.03 2.46 $ $ $ $ $ $

102,019.00 6,100.00 12,800.00 8,200.00 129,119.00

$ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $

Fiscal Year 2014 UNIT EXTENSION COST 7,600.00 $ 7,600.00 1,300.00 $ 1,300.00 $ 1.39 $ 971.43 64.62 $ 64.62 5,729.44 $ 114.59 15.24 $ 2,896.27 16.17 $ 3,354.31 35.08 $ 11,680.49 82.87 $ 2,583.96 144.54 $ 144.54 120.20 $ 3,955.67 $ 7,911.34 427.04 $ 427.04 2,374.53 $ 7,123.59 36.70 $ 23,674.53 3,532.79 $ 3,532.79 12.57 $ 3,895.57 29.30 $ 8,202.88 30.98 $ 9,448.54 40.27 $ 452.01 $ 1,808.03 2.23 $ 148.60 270.30 $ 540.59 55.35 $ 110.69 3,272.48 $ 850.84 2.20 $ 175.71 4.44 $ 709.84 117.21 $ 234.41 48.11 $ 96.23 961.71 $ 1,923.42 1,034.81 $ 1,034.81 2,458.64 $ 2,458.64 2.54 $ $ $ $ $ $

105,018.00 6,300.00 13,100.00 8,400.00 132,818.00

Page 3 of 3

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Appendices Appendix B FDOT Long Range Estimate (LRE) Report: R-1

36

LRE - R1: Project Summary without Components Report

Page 1 of 1

Date: 2/4/2011 3:50:45 PM

FDOT Long Range Estimating System - Production R1: Project Summary without Components Report Project: 555557-1-52-01

Letting Date: 01/2099

Description: City of Port Orange VTPO Herbert Street Sidewalk Bicycle Pedestrian Feasibility Study District: 05 County: 79 VOLUSIA Project Manager: E HORNE-HARLEY Version 6 Project Grand Total $161,269.71 Description: HERBERT STREET - Between SR 5A - Nova Road and Jackson Street Sequence 1 MIS Total Description: Segment 1 - North Herbert Street R/W

$49,207.27

Sequence 2 MIS Total Description: Segment 2 - South Herbert Street R/W

$77,726.78

Project Sequences Subtotal Maintenance of Traffic Mobilization

$126,934.05 10.00 % 10.00 %

Project Sequences Total

$12,693.40 $13,962.75 $153,590.20

Project Unknowns Design/Build Project Non-Bid Subtotal

0.00 % 0.00 %

Version 6 Project Grand Total

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR02R1C.asp

$0.00 $0.00 $7,679.51 $161,269.71

2/4/2011

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Appendices Appendix B FDOT Long Range Estimate (LRE) Report: R-2

37

LRE - R2: Project Summary with Components Report

Page 1 of 1

Date: 2/4/2011 3:51:29 PM

FDOT Long Range Estimating System - Production R2: Project Summary with Components Report Project: 555557-1-52-01

Letting Date: 01/2099

Description: City of Port Orange VTPO Herbert Street Sidewalk Bicycle Pedestrian Feasibility Study District: 05 County: 79 VOLUSIA Project Manager: E HORNE-HARLEY Version 6 Project Grand Total Description: HERBERT STREET - Between SR 5A - Nova Road and Jackson Street Sequence 1 MIS Description:

Segment 1 - North Herbert Street R/W Component: Earthwork Roadway Shoulder Utilities

Component Subtotals: $1,534.45 $18,372.81 $26,839.32 $2,460.69 $49,207.27

Sequence 1 Total Sequence 2 MIS Description:

Segment 2 - South Herbert Street R/W Component: Earthwork Roadway Shoulder Utilities

Component Subtotals: $1,277.05 $14,524.40 $60,165.13 $1,760.20 $77,726.78

Sequence 2 Total Project Sequences Subtotal Maintenance of Traffic Mobilization

$126,934.05 10.00 % 10.00 %

Project Sequences Total Project Unknowns Design/Build Project Non-Bid Subtotal

$161,269.71

$12,693.40 $13,962.75 $153,590.20

0.00 % 0.00 %

Version 6 Project Grand Total

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR03R2C.asp

$0.00 $0.00 $7,679.51 $161,269.71

2/4/2011

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Appendices Appendix B FDOT Long Range Estimate (LRE) Report: R-3

38

LRE - R3: Project Details by Sequence Report

Page 1 of 5

Date: 2/4/2011 3:51:58 PM

FDOT Long Range Estimating System - Production R3: Project Details by Sequence Report Project: 555557-1-52-01

Letting Date: 01/2099

Description: City of Port Orange VTPO Herbert Street Sidewalk Bicycle Pedestrian Feasibility Study District: 05 Contract Class:

County: 79 VOLUSIA Lump Sum Project: N

Market Area: 06 Design/Build: N

Units: English Project Length: 0.132 MI

Project Manager: E HORNE-HARLEY Version 6 Project Grand Total Description: HERBERT STREET - Between SR 5A - Nova Road and Jackson Street Sequence: 1 MIS - Miscellaneous Construction

$161,269.71

Net Length:

0.133 MI 700 LF

Description: Segment 1 - North Herbert Street R/W Special Combination of an 6' wide x 6" thick and 5' Wide x 4" thick concrete sidewalks, and a 5' asphalt Conditions: bicycle lane , along northern side of existing roadway. The 5' sidewalk section has a minimum of 2' offset from R/W(Typ.) as it meanders between the existing trees. EARTHWORK COMPONENT User Input Data Description Standard Clearing and Grubbing Limits L/R Incidental Clearing and Grubbing Area X-Items Pay item 110-1-1 120-1

Description CLEARING & GRUBBING REGULAR EXCAVATION

Value 0.00 / 0.00 0.00

Quantity Unit Unit Price Extended Amount 0.07 AC $12,000.00 $840.00 138.89 CY $5.00 $694.45 $1,534.45

Earthwork Component Total

ROADWAY COMPONENT X-Items Pay item 102-61 110-4 285-706 334-1-14 339-1 527-1 711-11-111 711-11-123 711-11-125 711-11-160 711-11-170 711-17

Description BUSINESS SIGN REMOVAL OF EXISTING CONCRETE PAVEMENT OPTIONAL BASE,BASE GROUP 06 SUPERPAVE ASPHALTIC CONC, TRAFFIC D MISCELLANEOUS ASPHALT PAVEMENT DETECTABLE WARNING ON EXIST WALK SURF, R THERMOPLASTIC, STD, WHITE, SOLID, 6" THERMOPLASTIC, STD, WHITE, SOLID, 12" THERMOPLASTIC, STD, WHITE, SOLID, 24" THERMOPLASTIC, STD, WHITE, MESSAGE THERMOPLASTIC, STD, WHITE, ARROW THERMOPLASTIC, REMOVE

Quantity Unit Unit Price Extended Amount 2.00 EA $56.61 $113.22 271.10 SY $11.74 $3,182.71 238.80 SY 21.50 TN

$15.00 $90.00

$3,582.00 $1,935.00

1.00 TN

$165.00

$165.00

4.00 EA

$596.67

$2,386.68

0.26 NM

$2,917.17

$758.46

560.00 LF

$1.90

$1,064.00

1,200.00 LF

$4.00

$4,800.00

2.00 EA

$90.62

$181.24

2.00 EA

$48.00

$96.00

50.00 SF

$2.17

$108.50

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

2/4/2011

LRE - R3: Project Details by Sequence Report

Page 2 of 5 $18,372.81

Roadway Component Total

SHOULDER COMPONENT User Input Data Description X-Items Pay item 104-10-3 104-18 520-2-4 520-3 522-1 522-2 570-1-2 EX-Items Pay item 425-1545 430-174-101 700-20-11 700-20-40 711-17

Value

Description SEDIMENT BARRIER INLET PROTECTION SYSTEM CONCRETE CURB, TYPE D VALLEY GUTTER- CONCRETE SIDEWALK CONC, 4" THICK SIDEWALK CONC, 6" THICK PERFORMANCE TURF, SOD

Quantity 700.00 1.00 40.00 250.00 230.56 150.00 197.78

Unit Unit Price Extended Amount LF $1.25 $875.00 EA $95.90 $95.90 LF $10.59 $423.60 LF $19.39 $4,847.50 SY $35.07 $8,085.74 SY $40.94 $6,141.00 SY $2.12 $419.29

Description DITCH BOTTOM INLET TYPE 'D' CULVERT PIPE OPTIONAL MAT'L. 0" - 24" SINGLE POST SIGN F&I SINGLE POST SIGN RELOCATE THERMOPLASTIC REMOVE

Quantity Unit Unit Price Extended Amount 1.00 EA $3,233.00 $3,233.00 45.00 LF $33.59 $1,511.55 4.00 EA 2.00 AS 50.00 SF

$247.36 $50.65 $2.32

$989.44 $101.30 $116.00 $26,839.32

Shoulder Component Total

UTILITIES COMPONENT X-Items Pay item 1644-800

Description FIRE HYDRANT, RELOCATE

Quantity Unit Unit Price Extended Amount 1.00 EA $2,460.69 $2,460.69

Utilities Component Total

Sequence 1 Total

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

$2,460.69

$49,207.27

2/4/2011

LRE - R3: Project Details by Sequence Report

Page 3 of 5

Sequence: 2 MIS - Miscellaneous Construction

Net Length:

0.133 MI 700 LF

Description: Segment 2 - South Herbert Street R/W Special Combination of a 6' wide x 4" thick concrete sidewalk with a minimum 2' offset from R/W (Typ) Conditions: and a 5' asphalt paved bicycle lane adjacent to the proposed curb section. EARTHWORK COMPONENT User Input Data Description Standard Clearing and Grubbing Limits L/R Incidental Clearing and Grubbing Area X-Items Pay item 110-1-1 120-1

Description CLEARING & GRUBBING REGULAR EXCAVATION

Value 0.00 / 0.00 0.00

Quantity Unit Unit Price Extended Amount 0.02 AC $12,000.00 $240.00 207.41 CY $5.00 $1,037.05 $1,277.05

Earthwork Component Total

ROADWAY COMPONENT X-Items Pay item 102-61 110-4 285-706 334-1-14 339-1 527-1 711-11-111 711-11-123 711-11-125 711-11-160 711-11-170

Description BUSINESS SIGN REMOVAL OF EXISTING CONCRETE PAVEMENT OPTIONAL BASE,BASE GROUP 06 SUPERPAVE ASPHALTIC CONC, TRAFFIC D MISCELLANEOUS ASPHALT PAVEMENT DETECTABLE WARNING ON EXIST WALK SURF, R THERMOPLASTIC, STD, WHITE, SOLID, 6" THERMOPLASTIC, STD, WHITE, SOLID, 12" THERMOPLASTIC, STD, WHITE, SOLID, 24" THERMOPLASTIC, STD, WHITE, MESSAGE THERMOPLASTIC, STD, WHITE, ARROW

Quantity Unit Unit Price Extended Amount 2.00 EA $56.61 $113.22 190.00 SY $11.74 $2,230.60 333.00 SY 31.18 TN

$15.00 $90.00

$4,995.00 $2,806.20

1.00 TN

$165.00

$165.00

4.00 EA

$596.67

$2,386.68

0.26 NM

$2,917.17

$758.46

80.00 LF

$1.90

$152.00

160.00 LF

$4.00

$640.00

2.00 EA

$90.62

$181.24

2.00 EA

$48.00

$96.00

$14,524.40

Roadway Component Total

SHOULDER COMPONENT User Input Data Description X-Items Pay item 104-10-3 104-18 520-2-4 520-3 522-1 570-1-2

Value

Description SEDIMENT BARRIER INLET PROTECTION SYSTEM CONCRETE CURB, TYPE D VALLEY GUTTER- CONCRETE SIDEWALK CONC, 4" THICK PERFORMANCE TURF, SOD

Quantity 700.00 1.00 310.00 280.00 305.00 66.66

Unit Unit Price Extended Amount LF $1.25 $875.00 EA $95.90 $95.90 LF $10.59 $3,282.90 LF $19.39 $5,429.20 SY $35.07 $10,696.35 SY $2.12 $141.32

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

2/4/2011

LRE - R3: Project Details by Sequence Report EX-Items Pay item 425-1361 425-1545 425-2-61 425-4 430-174-101 700-20-11 700-20-40

Page 4 of 5

Description INLET CURB P-6 DITCH BOTTOM INLET TYPE 'D' MANHOLE INLET ADJUST CULVERT PIPE, OPTIONAL MATERIAL,0"-24" SINGLE POST SIGN F&I SINGLE POST SIGN RELOCATE

Quantity 2.00 1.00 3.00 1.00 645.00

Unit Unit Price Extended Amount EA $3,620.00 $7,240.00 EA $3,233.00 $3,233.00 EA $2,173.03 $6,519.09 EA $390.80 $390.80 LF $33.59 $21,665.55

2.00 EA 2.00 AS

$247.36 $50.65

$494.72 $101.30 $60,165.13

Shoulder Component Total

UTILITIES COMPONENT EX-Items Pay item 715-4400

Description LIGHT POLE COMPLETE RELOCATE

Quantity Unit Unit Price Extended Amount 2.00 EA $880.10 $1,760.20

Utilities Component Total

$1,760.20

Sequence 2 Total

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

$77,726.78

2/4/2011

LRE - R3: Project Details by Sequence Report

Page 5 of 5

Date: 2/4/2011 3:52:03 PM

FDOT Long Range Estimating System - Production R3: Project Details by Sequence Report Project: 555557-1-52-01

Letting Date: 01/2099

Description: City of Port Orange VTPO Herbert Street Sidewalk Bicycle Pedestrian Feasibility Study District: 05 Contract Class:

County: 79 VOLUSIA Lump Sum Project: N

Market Area: 06 Design/Build: N

Units: English Project Length: 0.132 MI

Project Manager: E HORNE-HARLEY Version 6 Project Grand Total Description: HERBERT STREET - Between SR 5A - Nova Road and Jackson Street

$161,269.71

Project Sequences Subtotal

$126,934.05

102-1 101-1

Maintenance of Traffic Mobilization

10.00 % 10.00 %

$12,693.40 $13,962.75

Project Sequences Total Project Unknowns Design/Build

$153,590.20 0.00 % 0.00 %

$0.00 $0.00

Non-Bid Components: Pay item

Description

999-25

INITIAL CONTINGENCY AMOUNT (DO NOT BID) Project Non-Bid Subtotal

Quantity Unit LS

Unit Price $7,679.51

Version 6 Project Grand Total

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

Extended Amount $7,679.51 $7,679.51 $161,269.71

2/4/2011

VTPO  Herbert Street Sidewalk Bicycle/Pedestrian Facility  City of Port Orange

Appendices Appendix B FDOT Long Range Estimate (LRE) Report: R-26

39

LRE - R26: Project Details by Sequence without Initial Contingency Report

Page 1 of 5

Date: 2/4/2011 3:52:30 PM

FDOT Long Range Estimating System - Production R26: Project Details by Sequence without Initial Contingency Report Project: 555557-1-52-01

Letting Date: 01/2099

Description: City of Port Orange VTPO Herbert Street Sidewalk Bicycle Pedestrian Feasibility Study District: 05 Contract Class:

County: 79 VOLUSIA Lump Sum Project: N

Market Area: 06 Design/Build: N

Units: English Project Length: 0.132 MI

Project Manager: E HORNE-HARLEY Version 6 Project Grand Total Description: HERBERT STREET - Between SR 5A - Nova Road and Jackson Street Sequence: 1 MIS - Miscellaneous Construction

$153,590.20

Net Length:

0.133 MI 700 LF

Description: Segment 1 - North Herbert Street R/W Special Combination of an 6' wide x 6" thick and 5' Wide x 4" thick concrete sidewalks, and a 5' asphalt Conditions: bicycle lane , along northern side of existing roadway. The 5' sidewalk section has a minimum of 2' offset from R/W(Typ.) as it meanders between the existing trees. EARTHWORK COMPONENT User Input Data Description Standard Clearing and Grubbing Limits L/R Incidental Clearing and Grubbing Area X-Items Pay item 110-1-1 120-1

Description CLEARING & GRUBBING REGULAR EXCAVATION

Value 0.00 / 0.00 0.00

Quantity Unit Unit Price Extended Amount 0.07 AC $12,000.00 $840.00 138.89 CY $5.00 $694.45 $1,534.45

Earthwork Component Total

ROADWAY COMPONENT X-Items Pay item 102-61 110-4 285-706 334-1-14 339-1 527-1 711-11-111 711-11-123 711-11-125 711-11-160 711-11-170 711-17

Description BUSINESS SIGN REMOVAL OF EXISTING CONCRETE PAVEMENT OPTIONAL BASE,BASE GROUP 06 SUPERPAVE ASPHALTIC CONC, TRAFFIC D MISCELLANEOUS ASPHALT PAVEMENT DETECTABLE WARNING ON EXIST WALK SURF, R THERMOPLASTIC, STD, WHITE, SOLID, 6" THERMOPLASTIC, STD, WHITE, SOLID, 12" THERMOPLASTIC, STD, WHITE, SOLID, 24" THERMOPLASTIC, STD, WHITE, MESSAGE THERMOPLASTIC, STD, WHITE, ARROW THERMOPLASTIC, REMOVE

Quantity Unit Unit Price Extended Amount 2.00 EA $56.61 $113.22 271.10 SY $11.74 $3,182.71 238.80 SY 21.50 TN

$15.00 $90.00

$3,582.00 $1,935.00

1.00 TN

$165.00

$165.00

4.00 EA

$596.67

$2,386.68

0.26 NM

$2,917.17

$758.46

560.00 LF

$1.90

$1,064.00

1,200.00 LF

$4.00

$4,800.00

2.00 EA

$90.62

$181.24

2.00 EA

$48.00

$96.00

50.00 SF

$2.17

$108.50

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

2/4/2011

LRE - R26: Project Details by Sequence without Initial Contingency Report

Page 2 of 5 $18,372.81

Roadway Component Total

SHOULDER COMPONENT User Input Data Description X-Items Pay item 104-10-3 104-18 520-2-4 520-3 522-1 522-2 570-1-2 EX-Items Pay item 425-1545 430-174-101 700-20-11 700-20-40 711-17

Value

Description SEDIMENT BARRIER INLET PROTECTION SYSTEM CONCRETE CURB, TYPE D VALLEY GUTTER- CONCRETE SIDEWALK CONC, 4" THICK SIDEWALK CONC, 6" THICK PERFORMANCE TURF, SOD

Quantity 700.00 1.00 40.00 250.00 230.56 150.00 197.78

Unit Unit Price Extended Amount LF $1.25 $875.00 EA $95.90 $95.90 LF $10.59 $423.60 LF $19.39 $4,847.50 SY $35.07 $8,085.74 SY $40.94 $6,141.00 SY $2.12 $419.29

Description DITCH BOTTOM INLET TYPE 'D' CULVERT PIPE OPTIONAL MAT'L. 0" - 24" SINGLE POST SIGN F&I SINGLE POST SIGN RELOCATE THERMOPLASTIC REMOVE

Quantity Unit Unit Price Extended Amount 1.00 EA $3,233.00 $3,233.00 45.00 LF $33.59 $1,511.55 4.00 EA 2.00 AS 50.00 SF

$247.36 $50.65 $2.32

$989.44 $101.30 $116.00 $26,839.32

Shoulder Component Total

UTILITIES COMPONENT X-Items Pay item 1644-800

Description FIRE HYDRANT, RELOCATE

Quantity Unit Unit Price Extended Amount 1.00 EA $2,460.69 $2,460.69

Utilities Component Total

Sequence 1 Total

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

$2,460.69

$49,207.27

2/4/2011

LRE - R26: Project Details by Sequence without Initial Contingency Report

Page 3 of 5

Sequence: 2 MIS - Miscellaneous Construction

Net Length:

0.133 MI 700 LF

Description: Segment 2 - South Herbert Street R/W Special Combination of a 6' wide x 4" thick concrete sidewalk with a minimum 2' offset from R/W (Typ) Conditions: and a 5' asphalt paved bicycle lane adjacent to the proposed curb section. EARTHWORK COMPONENT User Input Data Description Standard Clearing and Grubbing Limits L/R Incidental Clearing and Grubbing Area X-Items Pay item 110-1-1 120-1

Description CLEARING & GRUBBING REGULAR EXCAVATION

Value 0.00 / 0.00 0.00

Quantity Unit Unit Price Extended Amount 0.02 AC $12,000.00 $240.00 207.41 CY $5.00 $1,037.05 $1,277.05

Earthwork Component Total

ROADWAY COMPONENT X-Items Pay item 102-61 110-4 285-706 334-1-14 339-1 527-1 711-11-111 711-11-123 711-11-125 711-11-160 711-11-170

Description BUSINESS SIGN REMOVAL OF EXISTING CONCRETE PAVEMENT OPTIONAL BASE,BASE GROUP 06 SUPERPAVE ASPHALTIC CONC, TRAFFIC D MISCELLANEOUS ASPHALT PAVEMENT DETECTABLE WARNING ON EXIST WALK SURF, R THERMOPLASTIC, STD, WHITE, SOLID, 6" THERMOPLASTIC, STD, WHITE, SOLID, 12" THERMOPLASTIC, STD, WHITE, SOLID, 24" THERMOPLASTIC, STD, WHITE, MESSAGE THERMOPLASTIC, STD, WHITE, ARROW

Quantity Unit Unit Price Extended Amount 2.00 EA $56.61 $113.22 190.00 SY $11.74 $2,230.60 333.00 SY 31.18 TN

$15.00 $90.00

$4,995.00 $2,806.20

1.00 TN

$165.00

$165.00

4.00 EA

$596.67

$2,386.68

0.26 NM

$2,917.17

$758.46

80.00 LF

$1.90

$152.00

160.00 LF

$4.00

$640.00

2.00 EA

$90.62

$181.24

2.00 EA

$48.00

$96.00

$14,524.40

Roadway Component Total

SHOULDER COMPONENT User Input Data Description X-Items Pay item 104-10-3 104-18 520-2-4 520-3 522-1 570-1-2

Value

Description SEDIMENT BARRIER INLET PROTECTION SYSTEM CONCRETE CURB, TYPE D VALLEY GUTTER- CONCRETE SIDEWALK CONC, 4" THICK PERFORMANCE TURF, SOD

Quantity 700.00 1.00 310.00 280.00 305.00 66.66

Unit Unit Price Extended Amount LF $1.25 $875.00 EA $95.90 $95.90 LF $10.59 $3,282.90 LF $19.39 $5,429.20 SY $35.07 $10,696.35 SY $2.12 $141.32

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

2/4/2011

LRE - R26: Project Details by Sequence without Initial Contingency Report EX-Items Pay item 425-1361 425-1545 425-2-61 425-4 430-174-101 700-20-11 700-20-40

Description INLET CURB P-6 DITCH BOTTOM INLET TYPE 'D' MANHOLE INLET ADJUST CULVERT PIPE, OPTIONAL MATERIAL,0"-24" SINGLE POST SIGN F&I SINGLE POST SIGN RELOCATE

Quantity 2.00 1.00 3.00 1.00 645.00

Page 4 of 5

Unit Unit Price Extended Amount EA $3,620.00 $7,240.00 EA $3,233.00 $3,233.00 EA $2,173.03 $6,519.09 EA $390.80 $390.80 LF $33.59 $21,665.55

2.00 EA 2.00 AS

$247.36 $50.65

$494.72 $101.30 $60,165.13

Shoulder Component Total

UTILITIES COMPONENT EX-Items Pay item 715-4400

Description LIGHT POLE COMPLETE RELOCATE

Quantity Unit Unit Price Extended Amount 2.00 EA $880.10 $1,760.20

Utilities Component Total

$1,760.20

Sequence 2 Total

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

$77,726.78

2/4/2011

LRE - R26: Project Details by Sequence without Initial Contingency Report

Page 5 of 5

Date: 2/4/2011 3:52:33 PM

FDOT Long Range Estimating System - Production R26: Project Details by Sequence without Initial Contingency Report Project: 555557-1-52-01

Letting Date: 01/2099

Description: City of Port Orange VTPO Herbert Street Sidewalk Bicycle Pedestrian Feasibility Study District: 05 Contract Class:

County: 79 VOLUSIA Lump Sum Project: N

Market Area: 06 Design/Build: N

Units: English Project Length: 0.132 MI

Project Manager: E HORNE-HARLEY Version 6 Project Grand Total Description: HERBERT STREET - Between SR 5A - Nova Road and Jackson Street

$153,590.20

Project Sequences Subtotal

$126,934.05

102-1 101-1

Maintenance of Traffic Mobilization

10.00 % 10.00 %

Project Sequences Total Project Unknowns Design/Build

$12,693.40 $13,962.75 $153,590.20

0.00 % 0.00 %

Project Non-Bid Subtotal Version 6 Project Grand Total

https://www3.dot.state.fl.us/longrangeestimating/estimates/LREAESR04R3E.asp

$0.00 $0.00 $0.00 $153,590.20

2/4/2011

GAI Project No. A091305.02