[PDF]io architecture - Rackcdn.comcf91b45501d65a45ed2c-0fd0e61b59561e751a583bb2da2b6fbe.r10.cf1.rackcdn.co...
3 downloads
179 Views
1MB Size
IO ARCHITECTURE
Fadhli Wong Mohd Hasan Wong Head Program Office, Integrated Operations, Operational Excellence, Petroleum Production & Development Digital Energy Forum 8-9th October 2013, Kuala Lumpur
© 2013 PETROLIAM NASIONAL BERHAD (PETRONAS) All rights reserved. No part of this document may be reproduced, stored in a retrieval system or transmitted in any form or by any means (electronic, mechanical, photocopying, recording or otherwise) without the permission of the copyright owner.
Introduction
Organisation
IO Architecture | 4
| Fadhli Wong Mohd Hasan Wong
Integrated Operations Architecture Integrated Operations Architecture Informed Decisions
Dashboards and Visualizations
New oil PE Existing
Existing
Corporate Portal UWTP subsurface CWTP Plant constraints constraints
PTP
ATP
RF
UPD
Analytics Integration Services Technical Applications Reservoir Management
Enterprise Applications
Well Management
Drilling
Production Operations
ECM (SharePoint)
Drilling
HSE
Data Management Real Time Data (PI Historian)
IO DB
Operational Data
Allocation System
Instrumentation RTU
IO Architecture | 3
PD
Workflow Management
Workflows and Integration
Applications
ILLUSTRATIVE
PLC
| Fadhli Wong Mohd Hasan Wong
DCS
Corporate SoR’s
Production
People, Process, Technology, Integration and Change Management
END-TO-END PRODUCTION SYSTEM FOR OIL New oil PE
Dashboard Tools
Instrumentations & Prerequisites
Translation of requirements:• Business/Operations • EOR Strategy • Terminals • RMP • Monitoring & Surveillance Program IO Architecture | 4
| Fadhli Wong Mohd Hasan Wong
Field
4 - 20mA Signal
Header
Header
Instrumentations & Prerequisites
Oil Production
Header
4 - 20mA Signal
ICP
ICP
PCP
Water Injection
4 - 20mA Signal
Header
Gas Lift
Type of Instrument: 1) Wireless Pressure Transmitter 2) Wireless Temperature Transmitter 3) Wireless Flow Transmitter 4) Control Valve
Gas Injection ICP
PCP
Instrument Room
Gas Lift / Water/Gas Injection Wellhead Automation chematic FIT
TE
FC
PT
Switch / Router
DCS
Analog Junction Box
Antenna
Wireless Gateway
PC
TT
The requirements for the instrumentation come mainly from the RMP, Monitoring & Surveillance Guidelines
IO Architecture | 4
| Fadhli Wong Mohd Hasan Wong
PI Server
Data Management
Manages the data interaction between applications and layers, establish a single point of truth, foster the reuse of data which avoids redundancy and duplication IO Architecture | 5
| Fadhli Wong Mohd Hasan Wong
Data reconditioning, cleansing, validation and aggregation
Applications Tools to facilitate the current day- to- day routine in managing organisation’s resources Optimse Production
Application
IO Architecture | 6
Application
Application
Application
| Fadhli Wong Mohd Hasan Wong
Workflows & Integration Tools to automate the business process, work-process and interfaces between applications to produce data analysis IO Solution Monitoring System Notification displayed in system Change or Notification?
Low Exception Triggered
Change identified in system, Requires analysis by User
Severity
High
Is a Task required? Yes
No
Yes
Medium
Warning
Alarm or Incident
Known Issue?
Knowledge Base
Yes
Yes
Known Issue?
No
No Advice
New Ticket
Assign New Task No Escalate to Incident
Yes
Escalation Required?
No
Resolved Yes
Completed, Ticket Closed, Respond to ticket originator
Lesson Learned
End
Workflow
Business Process IO Architecture | 7
A workflow is a sequence of connected steps, where each step follows the precedent without delay and ends before the subsequent step may begin. For IO, its technical workflows include into this sequence the interaction of users and petro-technical applications to produce results with consistent quality. A business process is a collection of structured activities or tasks that produce a specific service or goal for the user. | Fadhli Wong Mohd Hasan Wong
Collaborative Work Environment & Visualisation There are different types of collaboration, for different IO solutions and for different asset needs.
Represent the analysed data into a meaningful information.
IO Architecture | 8
| Fadhli Wong Mohd Hasan Wong
Organisation
THANK YOU IO Architecture | 9
| Fadhli Wong Mohd Hasan Wong
Acknowledgement 1. Deployment Team, EOR, EPTD, PCSB 2. Mark Anthony Macaranas, Khairul Mustaqim Abd Aziz, Surendran Kandasamy, Dulang IO Team, EOR, EPTD, PCSB 3. IO Department, OE, PCSB
IO Architecture | 8
| Fadhli Wong Mohd Hasan Wong
THANK YOU