Jet Pump and Gas Lift System Combo Produces Real Results


[PDF]Jet Pump and Gas Lift System Combo Produces Real Results903440afd419b48e9ea4-1ae00f793baf04b21219d7316d3d0fd8.r0.cf3.rackcdn.com/...

0 downloads 99 Views 210KB Size

®

Hydraulic Lift

Challenge An operator wanted to install

CASE STUDY: Jet Pump and

gas lift on several of his newlyfracked wells that needed to be dewatered, but there wasn’t

Gas Lift System Combo

gas available; the pipeline infrastructure had not been extended to the well locations.

Produces Real Results

To start producing the wells immediately, the operator needed to find another artificial lift soution.

Solution The Apergy - Hydraulic Lift team installed a jet pump / gas lift combination system that included: • Initially placing the wells on jet pump systems • Dewatering the wells until the pipeline infrastructure was able to provide gas • Removing the jet pump system to utilize the gas lift system

Results The operator was able to produce 4,070 bbl oil, 2,750 mcf gas, and 22,325 bbl water, occurring between the end of the fracking process and the kickoff of the gas lift system.

How the jet pump / gas lift combination works.

®

apergy.com