NEW CONSTRUCTION FLOWCHART
DEVELOPER CONTACTS HILCO ELECTRIC AND APPLIES FOR SERVICE
PRELIMINARY PROJECT MEETING (LOCATION, PLATS, LOAD INFO, ELECTRIC REQUIREMENTS)
CONSTRUCTION COMPLETE AND METER INSTALLED
NO 5 T O 10 W O R K
PRELIMINARY DESIGN AND COST FOR CONSTRUCTION COMPLETED AND PRESENTED TO DEVELOPER
MAJOR DESIGN CHANGES DURING CONSTRUCTION
YES
D A Y S
DEVELOPER AGREES WITH DESIGN, PAYS ANY CONSTRUCTION COSTS, AND PRESENTS LEGAL EASEMENT
ENGINEERING DESIGN RELEASED FOR CONSTRUCTION
NO
10 T O 15 W O R K
YES NO
DEVELOPER CONSTRUCTS METER POLE AND CONTACTS ENGINEERING DEPARTMENT
METER POLE PASSES INSPECTION
YES
ENGINEERING DESIGN RELEASED TO CONSTRUCTION SCHEDULE
D A Y S (*)
( * ) IN THE EVENT OF INCLEMENT WEATHER CONSTRUCTION TIME MAY BE DELAYED. 115 E. Main Street Itasca, Texas 76055-0127 (254) 687-2331 ~ Fax (254) 687-2428