PDF Format


[PDF]PDF Format - Rackcdn.comc24110ab053e5c234c6f-9b7150e100ab604df0aafbaf58c9fe02.r58.cf3.rackcdn.com/...

3 downloads 133 Views 448KB Size

NOTES PLEASE READ THIS DRAWING WITH THE FOLLOWING DRAWINGS: MECHANICAL SERVICES DETAILS & NOTES - DET17/051/01 TYPICAL DWELLING HEATING & DOMESTIC SERVICES DISTRIBUTION SCHEMATIC - SC17/051/01

SVP

SVP

Minimum distance between wall & grille to be 200mm (Typical)

THE LATEST KITCHEN MANUFACTURERS DRAWINGS & ARCHITECTS BATHROOM DRAWINGS.

Study

Study

Sump

Extract fan for purge ventilation. Control via on / off switch. Fan to be as Titon CME2 Q Plus. Fan to be accessible via access panel in ceiling.

Sump SVP

SVP

Ø125 supply duct drops F/A c/w fire collar below.

FS FS

store

Dwelling

Type

Dimensions (HxWxD)

F01 - F09 (inclusive)

35kw

600 x 500 x 270

204 x 60 ducts at H/L (typical).

store 204 x 60 extract duct drop to WM cupboard under stairs.

Radiator Schedule

FS FS

Cond

Cond

Ø22 MWS (Unbalanced) at H/L.

F-06

F-06

L-1 48.25 SQ. M L-1 519.33 Sq. '

L-1 48.25 SQ. M L-1 519.33 Sq. '

Living

Living

Ref

Height (mm)

Length (mm)

Type

Output (W@ 50°C)

Connections

R1

600

1000

21

1389

TBOE

R2

600

1000

21

1389

TBOE

R3

600

500

21

681

TBOE

R4

600

600

21

823

TBOE

R5

600

900

22

1598

TBOE

R6

600

800

21

1106

TBOE

R7

600

1000

21

1389

TBOE

R8*

1222

600

ECOS 126

467

BOE

R9

600

900

21

1247

TBOE

R10

600

900

21

1247

TBOE

R11

600

800

21

1106

TBOE

R12*

862

600

ECOS 86

328

BOE

R13* 1222 600 ECOS 126 467 BOE Radiators to be as Myson Premier Metric C/W TRV on flow connection and LSV on return (except in roomstat zones as indicated). *Towel rails to be as Myson Avonmore Chrome straight pattern with WHV on flow connection and LSV on return. Each towel rail to be complete with ECO 450 dual fuel heater kit

204 x 60 purge ventilation extract duct terminates via high capacity air brick.

Ø22 MWS connects to existing incoming service at H/L and drops to L/L with accessible SC, DCV & PRV to Life Time Homes Spec. Ø22 MWS rise back to H/L (all within boxing - by others).

HIU Schedule

HIU's to be as Tachotherm Compact S. Each HIU to be complete with white enamel casing and heat meter.

Ø125 extract duct rises T/A c/w fire collar below.

Ø22 MWS (Unbalanced) rise T/A Ø15 MWS (Unbalanced) drops to L/L with connection to WM.

LIFETIME HOMES SPECIFICATION ALL CONTROLS INCLUDING AECV, SC & THERMOSTATS TO BE BETWEEN 450mm-1200mm AFFL & AT LEAST 300mm AWAY FROM ANY INTERNAL CORNER.

Ø125 supply duct drops F/A c/w fire collar below.

Indirect HWS Cylinders Schedule

Water Services Layout

Ventilation Services Layout

Dwelling

Type

F01

170

170

550 x 1216

F02

170

170

550 x 1216

F03

170

170

550 x 1216

F04

170

170

550 x 1216

F05

170

170

550 x 1216

F06

210

210

550 x 1474

F07

210

210

550 x 1474

F08

170

170

550 x 1216

F09

170

170

550 x 1216

Capacity (litres) Dimensions (Ø x H)

SVP

SVP

HWS cylinders to be as Centerstore Indirect. Each cylinder to be complete with 3kW electric immersion heater, pressure & temperature relief valve and integral expansion vessel.

New Ø50 stub stack F/A connects to existing Ø110 SVP.

R4

Study

Study Sump

Sump

AS BUILT

SVP

SVP

HTG F&R F/A to H/L.

R3 Radiator connections drop to L/L (typical). RE store

store Zone 1 thermostat.

Cond

F-06 L-1 48.25 SQ. M L-1 519.33 Sq. '

Living

R1

Cond

Existing Ø110 SVP with Ø40 WM waste connection.

F-06 L-1 48.25 SQ. M L-1 519.33 Sq. '

Living

SERVICEPLAN

R2

Heating Services Layout

Drainage Services Layout

THIS DRAWING IS BASED ON THE FOLLOWING:CONSULTANTS DRG K170123-M(B)115 rev C2 ARCHITECTS DRG 1901/C/B099 rev C2