[PDF]PDF Format - Rackcdn.comc24110ab053e5c234c6f-9b7150e100ab604df0aafbaf58c9fe02.r58.cf3.rackcdn.com/...
3 downloads
133 Views
448KB Size
NOTES PLEASE READ THIS DRAWING WITH THE FOLLOWING DRAWINGS: MECHANICAL SERVICES DETAILS & NOTES - DET17/051/01 TYPICAL DWELLING HEATING & DOMESTIC SERVICES DISTRIBUTION SCHEMATIC - SC17/051/01
SVP
SVP
Minimum distance between wall & grille to be 200mm (Typical)
THE LATEST KITCHEN MANUFACTURERS DRAWINGS & ARCHITECTS BATHROOM DRAWINGS.
Study
Study
Sump
Extract fan for purge ventilation. Control via on / off switch. Fan to be as Titon CME2 Q Plus. Fan to be accessible via access panel in ceiling.
Sump SVP
SVP
Ø125 supply duct drops F/A c/w fire collar below.
FS FS
store
Dwelling
Type
Dimensions (HxWxD)
F01 - F09 (inclusive)
35kw
600 x 500 x 270
204 x 60 ducts at H/L (typical).
store 204 x 60 extract duct drop to WM cupboard under stairs.
Radiator Schedule
FS FS
Cond
Cond
Ø22 MWS (Unbalanced) at H/L.
F-06
F-06
L-1 48.25 SQ. M L-1 519.33 Sq. '
L-1 48.25 SQ. M L-1 519.33 Sq. '
Living
Living
Ref
Height (mm)
Length (mm)
Type
Output (W@ 50°C)
Connections
R1
600
1000
21
1389
TBOE
R2
600
1000
21
1389
TBOE
R3
600
500
21
681
TBOE
R4
600
600
21
823
TBOE
R5
600
900
22
1598
TBOE
R6
600
800
21
1106
TBOE
R7
600
1000
21
1389
TBOE
R8*
1222
600
ECOS 126
467
BOE
R9
600
900
21
1247
TBOE
R10
600
900
21
1247
TBOE
R11
600
800
21
1106
TBOE
R12*
862
600
ECOS 86
328
BOE
R13* 1222 600 ECOS 126 467 BOE Radiators to be as Myson Premier Metric C/W TRV on flow connection and LSV on return (except in roomstat zones as indicated). *Towel rails to be as Myson Avonmore Chrome straight pattern with WHV on flow connection and LSV on return. Each towel rail to be complete with ECO 450 dual fuel heater kit
204 x 60 purge ventilation extract duct terminates via high capacity air brick.
Ø22 MWS connects to existing incoming service at H/L and drops to L/L with accessible SC, DCV & PRV to Life Time Homes Spec. Ø22 MWS rise back to H/L (all within boxing - by others).
HIU Schedule
HIU's to be as Tachotherm Compact S. Each HIU to be complete with white enamel casing and heat meter.
Ø125 extract duct rises T/A c/w fire collar below.
Ø22 MWS (Unbalanced) rise T/A Ø15 MWS (Unbalanced) drops to L/L with connection to WM.
LIFETIME HOMES SPECIFICATION ALL CONTROLS INCLUDING AECV, SC & THERMOSTATS TO BE BETWEEN 450mm-1200mm AFFL & AT LEAST 300mm AWAY FROM ANY INTERNAL CORNER.
Ø125 supply duct drops F/A c/w fire collar below.
Indirect HWS Cylinders Schedule
Water Services Layout
Ventilation Services Layout
Dwelling
Type
F01
170
170
550 x 1216
F02
170
170
550 x 1216
F03
170
170
550 x 1216
F04
170
170
550 x 1216
F05
170
170
550 x 1216
F06
210
210
550 x 1474
F07
210
210
550 x 1474
F08
170
170
550 x 1216
F09
170
170
550 x 1216
Capacity (litres) Dimensions (Ø x H)
SVP
SVP
HWS cylinders to be as Centerstore Indirect. Each cylinder to be complete with 3kW electric immersion heater, pressure & temperature relief valve and integral expansion vessel.
New Ø50 stub stack F/A connects to existing Ø110 SVP.
R4
Study
Study Sump
Sump
AS BUILT
SVP
SVP
HTG F&R F/A to H/L.
R3 Radiator connections drop to L/L (typical). RE store
store Zone 1 thermostat.
Cond
F-06 L-1 48.25 SQ. M L-1 519.33 Sq. '
Living
R1
Cond
Existing Ø110 SVP with Ø40 WM waste connection.
F-06 L-1 48.25 SQ. M L-1 519.33 Sq. '
Living
SERVICEPLAN
R2
Heating Services Layout
Drainage Services Layout
THIS DRAWING IS BASED ON THE FOLLOWING:CONSULTANTS DRG K170123-M(B)115 rev C2 ARCHITECTS DRG 1901/C/B099 rev C2