Grove, Stockport, Cheshire, SK7 5DA. Tel: 0161 456 6644. This drawing and copyright belongs to Maple. Sunscreening ltd. Do not copy, reproduce or supp...

0 downloads 0 Views 124KB Size

Recommend Documents


Tel:020 7490 7919 Fax:020 7490 7929. London EC1M 4NP. 5 St. John's Place. Revision note. Date ... SVP. SVP. Lightwell. CONSTRUCTION. PC. MD. 11.07.17. SIGNAGE PLAN. LOWER GROUND FLOOR. 1901/C/700. C3. C1. CONSTRUCTION ISSUE. 11.07.17. MD. PC signage

ALL EXPOSED PIPE WORK BELOW THE CEILING. LEVEL SHALL BE LOCATED ... FROM HIU. SVP COWL & BALLOON TERMINATIONS BY. MECHANICAL ...

THE UNIT IS TO BE TITON CME Q1 PLUS HA WITH. INTERNAL HUMIDISTAT. THIS UNIT IS CONTINUOUS RUNNING WITH BOOST. FACILITY. IT IS TO BE ...

15 B10 08-200 H NF. 15 B10 01-200 H FF. 400. (TYP.) 15 B1001-200 HNE. 15 B10 08-200 H FF. GROUND FLOOR LVL. SSL 9.075. Abnormal or unusual ...

250. — +. N/. 350. Detail-C. 13B12 56-150 T1/ADDL li. 1. 1 B12 34-150 TIL BAR. BOT REINE REFER. DRG NO. E/320 (TYP). 69. 550. (TYP). 5B12 60-150 T1 ... GB-A3. (24)||. +-+---. B10 = 400mm. B16 = 650mm. B25 = 1000mm. B12 = 500mm. B20 = 800mm. B32 = 1

Ø15 MWS (Unbalanced) drops to L/L with connection to WM. F-06. SVP. SVP ... ALL CONTROLS INCLUDING AECV, SC & THERMOSTATS TO BE BETWEEN.

Ø22 MWS (Unbalanced) F/B to H/L. Ø22 MWS (Balanced) T/B from H/L. Ø22 HWS and MWS (Balanced) branch at L/L with connections to bath (with TMV), WHB and WC. HWS cylinder. (below HIU unit). F-04 bathroom. Bedroom 1 store ... ALL CONTROLS INCLUDING A

Sep 24, 2013 - 2x5 B12 92-200 H EF ... Abnormal or unusual residual risks may be shown above where it is considered that such ... 2x14 B12 09-200 H EF.

and Risk reduction in developing the designs shown on this drawing. Abnormal or unusual residual risks may be shown ... ground. Provide A252 nominal mesh to. Concrete base top and bottom with. 35mm cover. Client. DURKAN. Project Title. Cycle Store -

Store bathroom en suite. Bedroom 2. 49.34 SQ. M. L1. 531.06 Sq. ' L1. 446. 100. 860. 1850. 335. 3 ... boxing for builders works holes added. CONSTRUCTION.

SSL 18.150. 8. Minimum lap length to be 40 x bar dia. B10 = 400mm. B16 = 650mm. B25 = 1000mm. B12 = 500mm. B20 = 800mm. B32 = 1300mm. ( 15. E317. 18. E317. 22. E317. E3E. E317. 9.Reinforcement listed on the bar bending schedule complies with BS. 8666

Builders Works Hole. Locations Setting Out To Be. Read In Conjunction With. Calfordseaden Drawings. Builders works hole location. The penetrations are to be 200mm x 200mm. Unless Otherwise Noted. Outlet location. Refer to Architect and M&E Drawings f

Jul 16, 2013 - Union Road - Union Road, Clapham Road, Clapham SW4. Flat Type C6 1B2P Block 'D' (Shared Ownership) Drainage Layout. 1:[email protected]

Sep 3, 2012 - St John's House, 1A Knoll Rise, Orpington, Kent BR6 0JX. T. F. E. 01689 888222. 01689 888299 [email protected]

y. U N I O N R O A D. C. L. A. P. H. A. M. R. O. A. D. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 0. Stanton ... c Biscoe + Stanton Architects. ISO form ... 1901/C/701. C3. C1.

Sep 6, 2013 - 114 B1040-150 U BARS. ----. TooQQQQodoooooooooooooooOOO. 7 B10 38-T50 U BARS. 6B1039-150 U BARS. 6810 P180 LINKGY.

Oldroyd XV drainage membrane to Architect details and specification. Lightwell area. Existing 400mm diameter contiguous piled wall. Ples at 650mm centres. Oldroyd XV drainage membrane to Architect details and specification. Varias. Basement FFL. SSL.

Jul 24, 2013 - render finish to window reveal. DPC to lap into curtain walling. Continuous horizontal cavity barrier at every separating floor such as Rockwool ...

Jul 24, 2013 - Insulated cavity closer to fill cavity width, to provide thermal resistance of not less than. 0.45m2K/W and to form integral DPC. PPC aluminium ...

POSITIONED ABOVE THE KITCHEN WORKTOP BY. ELECTRICAL ... EXHAUST AIR WILL PASS TO ATMOSPHERE THROUGH. SINGLE ... COOKER HOOD.

1 in 80 Fall. 950. RSK LDE LTD has ... Block D Long Section With AOV Void Upstand. Scale 1:25. 853 ... Sections 5.48, 5.49, A and B added. Section 5.47 added ...

Aug 15, 2013 - Isolating membrane / vapour control barrier, to be laid over insulation. Membrane must be adequately lapped and sealed before laying screed.

Jun 13, 2014 - BLOCK C = nom.560mm. BLOCK B = nom.740mm. Note: Durkan to confirm buildability and client to confirm use of space. FFL. Raised timber.

DURKAN. Fanshaw House, Fanshaw Street, London N1 6HX. Tel 020 7739 2020 [email protected] www.davysmitharchitects.co.uk. Door No.

All dimensions are given in millimetres, and internal dimensions are taken to face of blockwork. Do not scale from the drawing. All dimensions and conditions to ...

Jul 24, 2013 - entry / fob access control system in all parts of the building and in all ... colour CCTV camera suitably positioned for facial recognition of visitors.

commercial units renamed C11/C12 - minor amendments to. 28.09.17. MD. PC. C7. Existing SVP positions updated - party wall adjusted. 03.11.17. MD. PC. C8.

AS BUILT. Balcony / Terrace Setting Out Plans. - BLOCK D. TSo. 1:50 @ A3. GD. 1310(AS)04-47. F. AUG 2013. TERRACE TYPE D-T1 - 2ND FLOOR. Terrace.

B. A. REVISED AS PER. ENGG COMMENTS. Issued for CONSTRUCTION. 17.09.13. 20.08.13. |. 5985. AGA RAK RAK. AGA RAK RAK. -. 500. 2 B12 11-150 T1.

Revised as clouded with general minor lalteration & Bar Mark numbering changes. 30.07.13 Issued for CONSTRUCTION. -. (TYP) 107. KSG SSM. RAK. -. 500.