Project 13265


NEGOTIATED BIDDERS Bid 14-54 / Project 13265...

3 downloads 68 Views 31KB Size

NEGOTIATED Bid 14-54 / Project 13265 / Crescent Hill Treatment Plant - Security Building and Grinstead Entrance Improvements Bid Opening Date: 5/29/14 Bid Estimate: $732,000 Prevailing Wage: Yes Recommended Awardee: Badgett Constructors LLC Buyer's Name: Robin Heitz Project Manager's Name: David Allgeier

BIDDERS Base Bid: Alternate #1 Start / Complete Dates: Bid Signed: Acknowledgement of Post Addendum #1 and #2: Good Faith Effort Documents Submitted within 24 hours:

Badgett Constructors LLC

Parco Constructors Group LLC

$779,800 $21,500

$822,400 $23,000

Martin Construction Co. (CMBE) (1) $765,000 $17,900

Corbett Construction Co., Inc. (CWBE) (2) $795,738 $16,800

Beging work within 14 calendar days after the Company issues the Notice to Proceed and to Complete the Work by December 19, 2014.

Yes Yes Yes

Yes Yes Yes

Yes Yes Yes

Yes Yes Yes

Subcontractors proposed to perform Specialty Items of Work: 1 Electrical 2 Mechanical 3 HVAC 4 Roofing 5 Painting Supplementary Unit Pricing

Delta Services Hussung Mechanical Hussung Mechanical Joseph Bowling Chambers Painting

Comstock Hussung Mechanical Hussung Mechanical Joseph Bowling Chambers Painting

Delta Services Hussung Mechanical Hussung Mechanical Tecta America Zero Chambers Painting

Delta Services Hussung Mechanical Hussung Mechanical Tecta America Zero Chambers Painting

1 12” RCP

Unit LF

$150.00

$77.00

$50.00

$75.25

2 15” RCP

LF

$180.00

$88.00

$75.00

$86.00

3 4” HDPE

LF

$40.00

$6.60

$60.00

$6.45

4 6” HDPE

LF

$42.00

$8.80

$70.00

$8.60

5 8” PVC SDR 35

LF

$50.00

$66.00

$80.00

$64.50

6 Dense Grade Aggregate (DGA)

TON

$25.00

$27.50

$30.00

$26.88

7 KDOH No. 3 Crushed Stone

TON

$24.00

$27.50

$32.00

$26.88

8 4” bituminous binder / base in place

SY

$24.00

$26.40

$75.00

$25.80

9 1” Surface Asphalt

LF

$8.00

$7.70

$15.00

$7.53

10 Median Curb

LF

$18.00

$20.90

$35.00

$20.43

11 Roll Curb & Gutter

LF

$20.00

$20.90

$40.00

$20.43

12 Lip Curb

LF

$28.00

$28.60

$40.00

$27.95

13 Mill 1” Asphalt, Clean & Place Tack Coat

SY

$2.00

$17.60

$25.00

$17.20

14 Silt Sack inlet protection

EA

$125.00

$165.00

$175.00

$161.25

15 Silt fence (MSD Standard Drawing EF-09-02)

LF

$3.00

$3.30

$50.00

$3.23

16 Reinforced Silt Fence (MSD Standard Drwg. EF-10-02)

LF

$4.00

$4.40

$75.00

$4.30

17 Trench earth excavation

CY

$24.00

$1.10

$150.00

$10.75

18 Trench rock excavation

CY

$300.00

$220.00

$350.00

$385.00

19 Mass earth excavation on-site

CY

$12.00

$6.60

$75.00

$6.45

20 Mass rock excavation on-site

CY

$150.00

$220.00

$150.00

$215.00

21 Earth or rock excavation haul-off from site

CY

$18.00

$19.80

$200.00

$19.35

22 Compacted engineered fill from on-site

CY

$12.00

$6.60

$50.00

$6.45

23 Compacted engineered fill from off-site

CY

$23.00

$33.00

$60.00

$32.25

24 4000 psi concrete, in place

CY

$400.00

$400.00

$500.00

$440.00

25 Stamped Concrete

SY

$1,600.00

N/A

$220.00

N/A

26 Handicap Ramp

EA

$850.00

$750.00

$525.00

$495.00

27 1” C 900 PVC water line

LF

$27.00

$20.00

$100.00

$15.00

28 Sod per specifications

SY

$4.00

$10.00

$10.00

$11.50

29 Erosion Control mat (N.A.G. C125, Class II – type B)

SY

$4.00

$8.00

$5.00

$5.50

30 Seed and Mulch

SY

$0.60

$6.00

$5.00

$9.50

LF

$5.00

$6.00

$15.00

$5.25

Temporary Chain Link Fence complete with post, rails, ties &

31 connections 32 Asphalt Pavement Removal

SY

$5.00

$20.00

$15.00

$36.92

33 Concrete Pavement / Sidewalk Removal

SY

$25.00

$25.00

$15.00

$36.92

34 Concrete Curb Removal

LF

$8.00

$8.00

$5.00

$36.92

35 Chain Link Fence Removal

LF

$15.00

$20.00

$10.00

$23.06

36 Ornamental Fence Removal

LF

$100.00

$25.00

$25.00

$23.17

37 Type “A” light fixture installed:

EA

$275.00

$225.00

$375.00

$295.63

38 Type “B” light fixture installed:

EA

$344.00

$303.00

$525.00

$369.80

Cost of a single data (or voice) drop including wiremold box, 39 up to 100’ of Cat. 6 cable, all necessary conduit, wiremold, bridal rings, junction boxes, testing, and all labor:

EA

$660.00

$495.00

$750.00

$709.50

40 6' high Ornamental fence 41 8' high Ornamental fence 42 7' high Vinyl Coated Chain Link fence

LF LF LF

$112.00 $125.00 $39.00

$128.00 $143.00 $44.00

$175.00 $225.00 $70.00

$120.01 $134.31 $40.96

(1) Disqualified. Deemed non-responsive, did not demonstrate Good Faith Effort. (2) Disqualified. Deemed non-responsive, submitted GFE documents after deadline