NOTICE The following information posted is provided as a courtesy and convenience for the website visitors. It is not guaranteed for its accuracy, completeness, nor to be the latest information available. = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =
PROJECT DESCRIPTION Venice Boulevard Transit Priority System (TPS) W.O. No. L1302794 FTA Project No. CA-03-0796 NOTICE TO BIDDERS The bid documents for this project will be issued through the City of Los Angeles (CLA) Business Assistance Virtual Network (www.labavn.org). Refer to the section entitled “Bid Documents” in this “Project Description” for information on how to obtain these bid documents. WORK DESCRIPTION This Venice Blvd. Transit Priority System (TPS) project will replace existing Type 170 traffic signal controllers with new Type 2070 controllers to handle additional inputs and phases for buses, and also to install bus transponder hardware and wide bus loops in the roadway. The traffic data collected from the intersection will be used to communicate with the ATSAC Center via interconnect cables. This will allow the ATSAC Center to control and to monitor each intersection along the bus route with a computer-controlled traffic signal system, giving priority to the bus operation. This project is expected to improve bus passenger travel times, encourage a shift from automobile use to public transit, and provide a smoother riding surface for buses and automobiles. CONTRACTOR'S LICENSE CLASSIFICATION At the time of bid the contractor must possess a valid State of California Contractor's License Classification of "A" or a combination of “C” licenses within the field and scope of a majority of the work. BID DOCUMENTS From the page for this project on www.labavn.org, click on each of the documents listed under “Scope of Work Documents and Standard Requirements Documents” near the bottom of the page to open each file and then save it onto your computer. These are the documents you will use to submit your bid for this project. For questions about obtaining the bid documents from the Business Assistance Virtual Network (www.labavn.org), call Bureau of Engineering Plan Distribution at (213) 847-0100 or email
[email protected] Monday through Friday from 9:00 a.m. to 3:00 p.m ADDITIONAL INFORMATION: For additional information, contact the Project Manager (in writing): Inder Dugal Los Angeles Department of Transportation 100 S. Main St., 9th Floor Los Angeles, CA 90012 Fax: (213) 972-5075 E-Mail:
[email protected] This is a Federal-Aid Project. The City of Los Angeles, Department of Public Works hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantage business enterprises (DBE) will be afforded full opportunity to submit a bid in response to this invitation and will not be discriminated against on grounds of race, color, or national origin in consideration for the award. The DBE participation levels for this project will be specified in the bid proposal “Important Notice” section. The DBE participation level for this project is: 3.52%
SCHEDULE OF WORK AND PRICES City of Los Angeles - Department of Transportation
VENICE BLVD. TRANSIT PRIORITY SYSTEM (TPS) W.O. No. L1302794
Federal Project No. CA-03-0796
ITEM
UNIT
QUANTITY
1
Bureau of Street Lighting (BSL) - Deliver To BSL Yard ( Santa Monica Blvd. & Virgil Ave.) Per Plan Removed Light Emitting Diode (LED) Luminaires
DESCRIPTION
LS
1
2
BSL- Remove Luminaire and Reinstall On New Pole
EA
4
3
BSL- Remove Luminaire, Lamp and Ballast (SET 1)
EA
17
4
BSL- Remove Luminaire, Lamp and Ballast (SET 2)
EA
20
5
BSL- Remove and Dispose of Complete Electrolier Assembly & Restore Surface To Match Adjacent Surface
EA
3
6
BSL- Remove and Dispose of Wires Per GENERAL NOTES ON SHEET 1 OF PROJECT PLANS
LS
1
7
BSL- Remove and Dispose of Complete Electrolier Assembly
EA
3
8
BSL- 1" Galvanized (Galv.) Conduit (Cond.) (Parkway) Including Excavations & Restoring Surface to Match Adjacent Surface
LF
64
9
BSL- 1-1/2" Galv. Cond. (Parkway) Including Excavations & Restoring Surface To Match Adjacent Surface
LF
405
10
BSL- 1-1/2" Galv. Cond. (St. Cross) Including Excavations & Restoring Surface To Match Adjacent Surface
LF
80
11 BSL- #10 THWN AWG Solid Wire
LS
1
12 BSL- #8 AWG Stranded Wire (600V)
LS
1
13
BSL - Pullbox (PB), Type 2 Armorcast Including Lid, Bends, Excavating & Restoring Surface To Match Adj. Surface
14
BSL - PB, Type 3 Armorcast Including Lid, Bends, Excavating & Restoring Surface To Match Adjacent Surface
EA
25
EA
4
EA
23
EA
1
17 BSL- CD953C Pole With 6' Luminaire Arm
EA
1
18 BSL- 6' Luminaire Arm For CD953
EA
1
19 BSL- 8' Luminaire Arm For CAL Type Pole
EA
22
20 BSL- LEOTEK 100 LED Luminaire GEN E w/o Dimming Control Module (DCM)
EA
2
21 BSL- LEOTEK 120 LED Luminaire GEN E w/o DCM
EA
28
22 BSL- LEOTEK 60 LED Luminaire GEN E w/o DCM
EA
10
23 BSL- LEOTEK 90 LED Luminaire GEN E w/o DCM
EA
11
EA
59
25 Prepare/Excavate Jackpit & Sidewalk Restoration (25ft-150ft)
EA
31
26 Jack Conduit Galv. 2 In/Ft, Sidewalk
LF
3,551
27 Jack Conduit Galv. 2 In/Ft, Crossing
LF
551
28 Jack Conduit Galv. 3 In/Ft, Sidewalk
LF
168
29 Jack Conduit Galv. 3 In/Ft, Crossing
LF
65
30 Install PB-2 w/o Sweeps
EA
73
15 BSL- 10 Amp Fuse Kit (Includes Cartridge Fuse) 16
24
BSL- Foundation (CD953, B-3685) Including Cap, Excavation All Bends & Restoring Surface To Match Adjacent Surface
BSL- Roam Node Per Plan, See Bureau Of Street Lighting Directive 413 For Purchase and Pickup
F - 2a
UNIT PRICE
ITEM TOTAL
SCHEDULE OF WORK AND PRICES City of Los Angeles - Department of Transportation
VENICE BLVD. TRANSIT PRIORITY SYSTEM (TPS) W.O. No. L1302794
Federal Project No. CA-03-0796
ITEM
DESCRIPTION
UNIT
QUANTITY
31 Install PB-3 w/o Sweeps
EA
141
32 Install PB-2 w/ Sweeps
EA
2
33 Install PB-3 w/ Sweeps
EA
8
34 Install PB-6 (T) w/o Sweeps
EA
1
35 Join and Extend Conduit w/ PB-2 (w/o Sweeps)
EA
5
36 Join And Extend Conduit w/ PB-3 (w/o Sweeps)
EA
1
37 Join And Extend Conduit w/ PB-2; Out of Ramp
EA
1
38
Wire For Signal Phasing (4 Phase Or Less) - (phase change w/ existing controller)
EA
4
39
Wire For Signal Phasing (More Than 4 Phases) - (phase change w/ existing controller)
EA
1
40 Install Atsac 2070 Controller/Cabinet (w/ Wire) - Labor Only
EA
26
41 Install Fuseholder and Fuse (60 AMPS)
EA
1
42 Temporary Controller
EA
13
43 Temporary Standard Including Signal Heads
EA
5
44 Temporary Standard Including Mast Arm (MA) w/ Signal Heads
EA
15
45 Rewire Existing Loops In Controller (Numbers Reassigned)
EA
10
46 Install Detector Loop W/ Home Run, 6 ft Diameter (DIA.)
EA
169
47 Install Bus Detector Loop w/ Home Run; At Midblock & Half Roadway
EA
44
48 Install Bus Detector Loop w/ Home Run; At Midblock & Full Roadway
EA
11
49 Install Bus Detector Loop w/ Home Run; At Inter Section (I/S) & Half Roadway
EA
43
50 Install Bus Detector Loop W/Home Run; At I/S & Full Roadway
EA
17
51 Install 1-Pair (PR) Bus Detector Lead-In Cable (DLC)/ft
LF
29,875
52 Install 2-PR Detector Lead-In Cable (DLC)/ft
LF
9,467
53 Install 3-PR Detector Lead-In Cable (DLC)/ft
LF
11,644
54 Install Detector Loop Stub Out (3.5 ft From Curb-Face) - Asphalt
EA
154
55 Install 3 Conductor Cable (3x #14)/ft
LF
188
56 Install 5 Conductor Cable (5x #14)/ft
LF
5,333
57 Install 9 Conductor Cable (8x #14;1x #12)/ft
LF
48
58 Install 28 Conductor Cable (27x #14;1x #12)/ft
LF
418
59 Install 28 Conductor Cable (27x #14;1x #12)/ft
LF
2,108
60 Install No. 8 Service Wire/ft (2 Wires)
LF
304
61 Install 12 PR Interconnect Cable In Conduit/ft
LF
2,130
62 Install 25 Pr Interconnect Cable In Conduit/ft
LF
4,780
F - 2b
UNIT PRICE
ITEM TOTAL
SCHEDULE OF WORK AND PRICES City of Los Angeles - Department of Transportation
VENICE BLVD. TRANSIT PRIORITY SYSTEM (TPS) W.O. No. L1302794
Federal Project No. CA-03-0796
ITEM
UNIT
QUANTITY
63 Install Pedestrian Push Button (Includes Sign)
EA
12
64 3 Section 8 in. (R,Y,G) One Way (Installation & Wiring Included)
EA
1
65 3 Section 12 in. (R,Y,G) One Way (Installation & Wiring Included)
EA
110
66 3 Section 12 in. (R,Y,G) Two Way (Installation & Wiring Included)
EA
5
67 3 Section 12 in. (R,Y,G) Mas Mount (Installation & Wiring Included)
EA
33
68 3 Section 12 in. (RA,YA,GA) Mas Mount (Installation & Wiring Included)
EA
4
69 4 Section 12 in (R,Y,G,GA) One Way (Installation & Wiring Included)
EA
2
70 5 Section 12 in. (R,Y,G,YA,GA) Cluster (Installation & Wiring Included)
EA
2
71 5 Section 12 in. (R,Y,G,YA,GA) One Way (Installation & Wiring Included)
EA
4
72 Arrow Mask Per Lens On Non-Led Head (Installation Included)
EA
4
73 Bevelled Visor / 12 In Lens (Installation & Wiring Included)
EA
33
74 Pedestrian Head - One Way (Installation & Wiring Included)
EA
32
75 Install/Relocate Signpost
EA
38
76 Install Aps Ped Push Button
EA
120
77 Transit Priority Sensor Unit With Detector Harness (Including Installation)
EA
100
78 Transit Priority Communication Equipment (Exhibit 7, Page 3)
LS
1
Install/Replace Closed Circuit TeleVision (CCTV) Cameras With 5 Yr. Warranty EA (Exhibit 8)
6
79
DESCRIPTION
80 CCTV Control Cable (200 ft)
EA
6
81 CCTV Opical Transmitter (Exhibit 7, Pages 1 & 2)
EA
6
82 CCTV Optical Receiver (Exhibit 7, Pages 1 & 2)
EA
6
83 Pigtail Single Mode Optical Cable, ST To ST (10ft)
EA
12
84 Pigtail Single Mode Optical Cable, ST To FC (10ft)
EA
1
85 CCTV Extension Pole (Venice Blvd. & Overland Ave.)
EA
1
86 Field Office, Class "A" With Air Conditioning
EA
1
87 Permits - Caltrans (Exhibit 9)
LS
1
88 Install 20 ft. Mast Arm
EA
1
89 Install Type 1 or 9 Traffic Signal Standard
EA
5
90 Install Type 7 or 8 Traffic Signal Standard
EA
10
91 Install Type 16 Traffic Signal Standard W/M.A.
EA
2
92 Install Type 17 Traffic Signal Standard W/M.A.
EA
17
93 Install Type 19 Traffic Signal Standard W/M.A.
EA
3
94 Install Type 24 Traffic Signal Standard W/M.A.
EA
3
F - 2c
UNIT PRICE
ITEM TOTAL
SCHEDULE OF WORK AND PRICES City of Los Angeles - Department of Transportation
VENICE BLVD. TRANSIT PRIORITY SYSTEM (TPS) W.O. No. L1302794
Federal Project No. CA-03-0796
ITEM
DESCRIPTION
UNIT
QUANTITY
95 Install F-1 Foundation
EA
5
96 Install F-7 Foundation
EA
10
97 Install F-12a & F-332 Foundation
EA
12
98 Install CIDH Pile Foundation
EA
25
99 Removal Of Existing Conductors In Conduit/ft (Labor Only)
LF
12,691
100 Remove Curb & Gutter Island And Restore Street (PER sq ft)
SF
230
101 Remove Ped Push Button
EA
131
102 Remove 15 ft. or 20 f. MA Only
EA
5
103 Remove Traffic Signal Head Per Head
EA
141
104 Remove Ped Head
EA
32
105 Remove Existing Controller/Cabinet (w/ Wire)
EA
25
106 Remove Type 1, 9 (Excluding Heads)
EA
1
107 Remove Type 7, 8 (Excluding Push Button/Cabinet)
EA
46
108 Remove Type BSL (Excluding Heads)
EA
5
109 Remove Type 2, 3, 5 (Tierods) (w/ M.A. Only)
EA
13
110 Remove Type 16, 17 (w/ M.A. Only)
EA
1
111 Remove Type 18, 19, 24 (w/ M.A. Only)
EA
1
112 Remove F-1, F-8 Foundation
EA
13
113 Remove F-2 Foundation
EA
4
114 Remove F-7 Foundation
EA
34
115 Remove F-5, 6, Or 14 (Concrete Poles) (BSL) Foundation
EA
15
116 Remove CIDH Pile Foundation
EA
1
117 Remove PB Only (Sidewalk Restoration)
EA
7
118 Relocate BSL PB
EA
5
119 Install/Relocate Traffic Sign
EA
150
120 Remove Traffic Sign
EA
15
121 Median Reconstruction
EA
6
UNIT PRICE
ITEM TOTAL
TOTAL BID AMOUNT: Unit abbreviations: CY=cubic yard, EA=each, LF=linear foot, LS=lump sum, SF=square foot Other abbreviations: APS=Accessible Pedestrian Signal, BSL=Bureau of Street Lighting, CAL=Caltrans, CIDH=cast-in-drilled hole, DCM=Dimming Control Module, DLC=Detector Lead-In Cable, FC=Fixed-Connection, Gen D = Generation D, LED=light emitting diode, MA=Mast Arm, PB=pull box, ST=Straight-Tip, W/MA=With Mast Arm NOTES
1. SPECIALTY ITEMS: Items 86 and 121 are designated as Specialty Items. 2. ENHANCED ELECTRIC SAFETY POLICY is applicable on this project for on-site electrical work. See Bid Proposal, Part IV "General Instructions and Information for Bidders", subsection 16b. F - 2d