[PDF]Pump 1 Commissioning - Rackcdn.comc24110ab053e5c234c6f-9b7150e100ab604df0aafbaf58c9fe02.r58.cf3.rackcdn.com/...
2 downloads
138 Views
814KB Size
COMMISSIONING/SERVICE RECORD FORM Shepherd Road Gloucester GL2 5EL United Kingdom
Date:
Job Number
PS1
Site reference
18/09/2015
MECHANICAL 11. Visual inspection of tank and equipment
344 Clapham Road
✔
12. Check seating of non-return valves and close/open
Lambeth
✔
isolation valves
SW9 9AJ ELECTRICAL 1. Check condition of panel for signs of overheating,
✔
loose connections etc. 2. Check integrity of panels, sets, locks, cabinets, etc.
✔
Pump Make
Power
Pump Model
Serial No. 1
Discharge Size
Serial No. 2
Pump 1 Tag
C470
Pump 2 Tag
Control Panel Tag 13. Remove, check for blockages and correct rotation
✔
14. Check for mechanical damage
✔
3. Check integrity of cable connections
✔
4. Check lamp operation
✔
5. Check fuses for damage
✔
16. Check condition of float regulators or level probes etc.
✔
6. Input Voltage .......... Volts
240
17. Check mechanical condition of all safety barriers etc.
✔
15. Check oil level and condition of oil and change if
7. Insulation resistance/phase to earth (meg/ohms) Pump 1
✔
necessary
OPERATIONAL
Pump 2 U2 =
18. Ensure correct operation in hand and auto control
V1 =
V2 =
19. Check operation of all levels
✔
W1 =
W2 =
20. Check duty/changeover operation
✔
21. Check alarm operation
✔
U1 =
8. Check and record continuity of windings (ohms) Pump 1
22. Check and record overload settings
Pump 2
U1-V1
U2-V2
U1-W1
U2-W2
V1-W1
V2-W2
9. Checks of any fixed wiring
Pump 1
Pump 2
Amps
Amps
23. Record current readings during pump operation Pump 1
✔ U1 =
10. Check condition of earth bonding
✔
✔
No. of schedules attached
Pump 2 U2 =
1.6
V1 =
V2 =
W1 =
W2 =
NOTES:
24. Check flow monitoring
All operating correctly.
25. Check B.M.S. operation
0.2
Pump 1 Hours Pump 2 Hours
Customer comments:
How do you rate our service?
Very poor 1
2
3
4
5
6
7
Very good 8
9
10