REVISED ATTACHMENT “A” Resolution 2012-## Amending the
FY 2012/13 to FY 2016/17 Transportation Improvement Program (TIP)
October 23, 2012
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
Section V - Traffic Operations, ITS & Safety Projects
Pg 1
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
Candidate-2012-3
ADD NEW PROJECT
SR 40 Adaptive traffic signal control system Work Summary:
TRAFFIC CONTROL DEVICES/SYSTEM
Trans System:
NON-INTRASTATE STATE HIGHWAY
Fund Phase Source CST CST
XU (SU) LF
Total
Project Description:
Non-SIS From:
Main Trail
To:
Tymber Creek Road
Jursidiction:
City of Ormond Beach
2012/13
2013/14
2014/15
2015/16
2016/17
Total
401,223 44,580
0 0
0 0
0 0
0 0
401,223 44,580
445,803
0
0
0
0
445,803
Implement an adaptive traffic signal control system on SR 40 from Main Trail to Tymber Creek Road. Total project cost is $445,803.
Pg 2
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
Candidate-2012-4
ADD NEW PROJECT
City of New Smyrna Beach Traffic Signal Preemption Work Summary:
TRAFFIC CONTROL DEVICES/SYSTEM
Non-SIS From:
City-wide
To: Trans System:
NON-SYSTEM SPECIFIC
Fund Phase Source CST CST
XU (SU) LF
Total
Project Description:
Jursidiction:
City of New Smyrna Beach
2012/13
2013/14
2014/15
2015/16
2016/17
Total
181,249 20,139
0 0
0 0
0 0
0 0
181,249 20,139
201,388
0
0
0
0
201,388
Install traffic preemption equipment on twenty-three traffic lights within the New Smyrna Beach City limits. Total project cost is $201,388.
Pg 3
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
Candidate-2012-5
ADD NEW PROJECT
LED Traffic Signal Replacement - Daytona Beach Work Summary:
Non-SIS
TRAFFIC CONTROL DEVICES/SYSTEM
From:
City-wide
To: Trans System:
NON-SYSTEM SPECIFIC
Fund Phase Source CST CST
XU (SU) LF
Total
Project Description:
Jursidiction:
City of Daytona Beach
2012/13
2013/14
2014/15
2015/16
2016/17
Total
101,306 75,313
0 0
0 0
0 0
0 0
101,306 75,313
176,619
0
0
0
0
176,619
The City of Daytona Beach is requesting to upgrade 42 traffic control signals to energy efficient LEDs. This would complete the conversion of the City's 100 traffic control signals to LEDs. Total project cost is $176,619.
Pg 4
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
Candidate-2012-6
ADD NEW PROJECT
LED Traffic Signal Replacement - DeLand Work Summary:
Non-SIS
TRAFFIC CONTROL DEVICES/SYSTEM
From:
City-wide
To: Trans System:
NON-SYSTEM SPECIFIC
Fund Phase Source CST CST
XU (SU) LF
Total
Project Description:
Jursidiction:
City of DeLand
2012/13
2013/14
2014/15
2015/16
2016/17
Total
63,000 7,000
0 0
0 0
0 0
0 0
63,000 7,000
70,000
0
0
0
0
70,000
Change out existing traffic signal heads to lower wattage LED traffic signal heads. There are 14 intersections identified by Volusia County that need to be converted. Total project cost is $70,000.
Pg 5
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
Section VIII - Bicycle, Pedestrian & Enhancement Projects
Pg 6
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
4302172
ADD NEW PHASE
Alabama Av Multi-Use Trail - Minnesota to US 92 Work Summary:
Trans System:
XU (SU) LF
Total
Project Description:
BIKE PATH/TRAIL
OFF STATE HWY SYS/OFF FED SYS
Fund Phase Source CST CST
Non-SIS From:
Minnesota Av
To:
US 92
Jursidiction:
City of DeLand
2012/13
2013/14
2014/15
2015/16
2016/17
Total
675,000 75,000
0 0
0 0
0 0
0 0
675,000 75,000
750,000
0
0
0
0
750,000
Construct a multi-use trail, with a preferred width of 12 ft., along Garfield Avenue from an existing trail on US 92 to Minnesota Avenue. Funding for construction has not yet been identified. A related project, FM# 4302171, addresses the construction of a trail segment from the existing trail on US 92, northward along Marsh Road, to the Sperling Sports Complex. Total project cost is $900,000 including $150,000 design costs in FY 2011/2012.
Pg 7
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
4302281
ADD NEW PHASE
Herbert Street Sidewalk - Southside Work Summary:
Trans System:
XU (SU) LF
Total
Project Description:
SIDEWALK
OFF STATE HWY SYS/OFF FED SYS
Fund Phase Source CST CST
Non-SIS From:
Golden Gate Dr
To:
SR 5A (Nova Rd)
Jursidiction:
City of Port Orange
2012/13
2013/14
2014/15
2015/16
2016/17
Total
173,739 19,304
0 0
0 0
0 0
0 0
173,739 19,304
193,043
0
0
0
0
193,043
The project is to complete the sidewalk within the existing gap along the south side of Herbert Street from Golden Gate Drive (opposite the entrance to Silver Sands Middle School) to SR 5A (Nova Rd). Project length: approx. 3,000 ft. Total project cost is $ 209,043 including $16,000 in design costs in FY 2011/2012.
Pg 8
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
4302341
ADD NEW PHASE
Highbanks Road Sidewalk (North Side) Work Summary:
Trans System:
XU (SU) LF
Total
Project Description:
SIDEWALK
OFF STATE HWY SYS/OFF FED SYS
Fund Phase Source CST CST
Non-SIS From:
Donald Smith Boulevard
To:
Rob Sullivan Park
Jursidiction:
City of DeBary
2012/13
2013/14
2014/15
2015/16
2016/17
Total
178,200 21,384
0 0
0 0
0 0
0 0
178,200 21,384
199,584
0
0
0
0
199,584
Replace existing 5-ft wide sidewalk along the north side of Highbanks Road between Donald Smith Boulevard and Rob Sullivan Park with a new 8-ft wide sidewalk. Total project cost is $211,083 including $11,500 design costs in FY 2011/2012.
Pg 9
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
Volusia TPO Transportation Improvement Program - FY 2012/13 - 2016/17
4302351
ADD NEW PHASE
Acadian Drive Sidewalk
Non-SIS
Work Summary:
Trans System:
OFF STATE HWY SYS/OFF FED SYS
Fund Phase Source CST CST
XU (SU) LF
Total
Project Description:
SIDEWALK
From:
Providence Blvd
To:
Elkcam Blvd
Jursidiction:
City of Deltona
2012/13
2013/14
2014/15
2015/16
2016/17
Total
40,500 4,500
0 0
0 0
0 0
0 0
40,500 4,500
45,000
0
0
0
0
45,000
Construct new sidewalk along Acadian Drive between Providence Boulelvard and Elkcam Boulevard. Total project cost is $ 61,500 including $16,500 design costs in FY 2011/2012.
Pg 10
Attachment A - Resolution 2012-25 [REVISED 10/10/12]
10/17/2012
Introduction and Overview Volusia TPO CAC and TCC October 16, 2012 Corridor Improvement Program (CIP) Phase I: Assessment of US 17‐92
•
• • •
Study Area: US 17-92 from Seminole County line to the Putnam County Line South Section: Seminole County line to Spring Garden Avenue North Section: Spring Garden Avenue to Putnam County line Four cities and Volusia County
Pierson
DeLand Orange City
DeBary
Project Scope •
• •
•
Data Collection •Volusia TPO Transportation Plans •Comprehensive Plans •Freight Movement Studies •Origin Destination Studies •CRA Plans/Vision Plans/Area Plans •Corridor Studies •Pedestrian/Bicycle Studies and Plans •Streetscape Plans and Projects •Transit Development Plans (Votran) •Commuter Rail Plans (SunRail) •Intersection Improvements •Development Master Plans (DRIs) •SIS Plans and Design Standards
Collect Studies, Plans and Data, Analysis of Existing Conditions and Develop GIS Interface Identify and Meet with Stakeholders Review Functional Classification and Strategic Intermodal System (SIS) Requirements and Procedures Evaluate Potential Impacts of Relocating SIS
• • • • •
• • •
Stakeholders/Working Group City of DeBary City of DeLand City of Orange City Town of Pierson Volusia County (Growth Management, Traffic Engineering and Economic Development) Florida Department of Transportation District 5 Volusia TPO Votran/SunRail
List of Studies Over 75 studies and plans collected Conducted Stakeholder meetings over 2 months. Identified 115 Different Projects
1
10/17/2012
Categories Used in the CIP
Summary Themes
•
Vehicular
•
Bicycle and Pedestrian
•
Transit
Vehicular Category: • Match Roadway to Local Preference • Manage Truck Traffic • Analyze SIS Alignment Alternative • Improve Safety and Speed Control • Improve Operational Efficiency
•
Landscape-Streetscape
•
Land Use/Economic Dev.
•
Other
Bike/Ped Category: • Improve Mobility Along and Across the Corridor • Enhance Connectivity with Transit • Maximize Connection to Regional Facilities • Improve Safety
Summary Themes
Summary Themes
Transit Category: • Enhance Services to Support Mobility Needs • Interconnect SunRail to Transit • Coordinate Development (TOD) Plans with Transit Plans • Use Transit to Support Economic Development Plans Landscape/Streetscape Category: • Enhance Community Identity • Develop Context-Sensitive Roadway Designs • Improve Aesthetics
Typical Projects • • • •
• • •
•
Vehicular Traffic Operations Access Management Alternative Routing Widening (North Section) Transit Connectivity with SunRail Improvement of Bus Shelters and Amenities Integration into Local Mobility Plans Other Sidewalks and Utilities Extension
•
Bicycling/Pedestrian Implementation of County Trail Plan Safety Improvements for Schools Eliminating Gaps
• •
Landscaping/Streetscape Incremental site improvements Pending Redevelopment Plans
• •
• •
Land Use/ Economic Development Mixed-use and TOD CRA in DeLand and Orange City
Land Use/Economic Dev. Category: • Facilitate Economic Development, Redevelopment and Infill • Facilitate Future Growth with MultiModal Opportunities • Rural Community Enhancement “Other” Category: • Coordinate with Capital Improvements (CRA, Utilities, Stormwater, Trails, Parks, etc.)
GIS Interface • Same as the US 1 CIP tool • Identifies the Projects within the Corridor • Provides Status of the Project • Identifies Complementary and Conflicting Projects
Project:
V-11
Category:
Vehicular
Location:
US 17-92 and Graves Ave
Description: Traffic Control Jurisdiction: Orange City
V-11
Source Document: 2009-2014 Strategic Plan Study Date: 2009 Status: Completed Common Projects: None Conflicting Projects: None
2
10/17/2012
Examples of Roadway Sections
Summary of Existing Conditions •
Corridor is 41.1 Miles
•
19 Different Sections
Rural 2-lane undivided 2-lane CBD
•
Function and Local Vision
•
Traffic Data
•
Roadway Conditions (pavement, ADA compliance, bike/ped facilities, crash data, etc.)
•
Transit Stop Conditions
Rural 2-lane undivided Urban 4-lane w/ bidirectional turn lanes
4-Lane urban divided with raised medians
Urban 4-lane divided with raised medians
Analysis of Functional Classification and SIS Impacts 1. Looked at Functional Classification and SIS Issues
•
2. Florida Intrastate Highway System Eliminated and Blended into SIS
•
3. Reviewed Design Standards/ Alternatives/Level-of-Service Issues
•
4. Summary of SIS Designation (SR 472 as alternative SIS facility)
•
Impacts of SIS Designation Potential SIS Relocation to Accommodate Local Vision Provide Routing that Separates Truck Traffic from Redevelopment Areas Identify Process and Data Requirements for Redesignation Investigate Funding Resources for SIS
Next Steps Review and Update Findings with Stakeholders o Complete GIS-based Mapping Projects
THANK YOU FOR YOUR TIME AND ASSISTANCE.
o Draft Final Report o Hold Final Workshop with Stakeholders o Present Final Report to CAC, TCC and TPO Board
3
CONSTRUCTION STATUS REPORT
CONSTRUCTION STATUS REPORT
CONSTRUCTION STATUS REPORT
PUSH BUTTON PROJECT LIST VOLUSIA COUNTY OCTOBER 2012