[PDF]Rialto - Rackcdn.comhttps://db1736767dbd5e7094bb-d61bbc5d0b342a54145a236e2d5d1ebf.ssl.cf4.rackc...
26 downloads
80 Views
964KB Size
Rialto INCLUDED PARTS
INSTRUCTIONS STEP 1 Attach mounting brackets to both sides of letterbox. STEP 2 Dig 2x holes (roughly 30 cm deep x 20 cm wide). Locate these holes so when letterbox is in desired location, mounting brackets will sit in the middle of the holes. STEP 3 Place letterbox in desired location.
M6 BOLTS (x4)
BARCKETS (x2)
STEP 4 Fill both holes with ready mix concrete. Monitor that the letterbox remains in desired position until concrete has fully set.
ANGLE SCREW (x1)
RIALTO MAILBOX
30cm 20cm
SOIL
SOIL
SOIL